Andhra Pradesh State Civil Supplies Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Civil Supplies Corporation Limited - APSCSCL Tender

Opening Date3 Mar 2021
Closing Date17 Mar 2021
Tender Amount₹ 77,29,677 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Godown Complex;Random Rubble Stone Masonry in CM (1:6) prop. using other than granite stone including cost and conveyance of all materials to site of work, labour charges, Seigniorage, curing including all water leads, etc., complete for finished item of work

113.45

-

411463.86

... More
Godown Complex;Refilling basement and sides of foundations with useful excavated soils including watering, ramming, complying with standard specifications for filling including all water leads and consolidation with iron roller including initial lead and lift etc., complete for finished item of work.

120

-

3137.2

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For RCC Footings

16

-

126637.6

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For RCC Columns

26

-

268096.92

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Plinth Beam Over Basement @ Basement Level

13

-

123373.77

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Lintels

1

-

10500.62

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Tie Beam @ 2.75 M Height Over Basement

6

-

60984.48

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Tie Beam @ 4.98 M Height Over Basement

17

-

178686.15

... More
Godown Complex;PCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Bed Blocks

2

-

11638.16

... More
Godown Complex;VRCC M-20 Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 20 mm size graded machine crushed hard granite metal (Coarse aggregate) for Sunshades from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., for sun shades wutg 100 thick at fixed end and 75 mm thick at free end of average thickness of 87.50 mm thick and plastering 12 mm thick in Cement Mortar (1:3) Prop. on all surfaces to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Sunshades.

22

-

19583.94

... More
Godown Complex;Brick Masonry in Cement Mortar (1:6) prop; using 2nd class Bricks traditional size 23x11x7 cms for super structure including cost and conveyance of all materials, Seigniorage, labour charges, scaffolding, all leads & lifts, curing etc., complete for finished item of work (Upto 3.00 M Height over Basement)

55

-

320883.2

... More
Godown Complex;Brick Masonry in Cement Mortar (1:6) prop; using 2nd class Bricks traditional size 23x11x7 cms for super structure including cost and conveyance of all materials, Seigniorage, labour charges, scaffolding, all leads & lifts, curing etc., complete for finished item of work (Above 3.00 M Height over Basement)

70

-

408377.26

... More
Godown Complex;Filling Basement and Foundations with Gravel in layers of 15cms, watering, ramming including all water leads and consolidation including all leads and lifts, seigniorage etc., complete for finished item of work.

723.2

-

478319.66

... More
Godown Complex;Providing Antitermite treatment as per IS 6315 (part-2) 2001 (Pre-costructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using chlorpyriphos/Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Litres/sqm of the vertical surface & @ 5.0 Litres/sqm of the horizantal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etcetc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work.

603

-

187564.01

... More
Godown Complex;Flooring with Plain Cement Concrete (1:5:10) prop; using 40mm gauge hard broken granite metal 100mm thick and simultaneously laid 75mm thick PCC M-20 using 20mm size hard broken machine crushed granite metal chips and then polishsing the flooring with de watering machine including cost of polishing, transportation of machine, generator including, diesel oil etc., including all materials to site of work, labour charges, vibrator charges, seigniorage, curing etc., complete.

605

-

553496.35

... More
Godown Complex;Plastering to Brick Masonry in two coats in 12mm thick. Base Coat in CM (1:5) prop; 8mm thick and Top Coat in CM (1:3) prop; 4mm thick with sponze finishing including cost and conveyance of all materials, labour charges, scaffolding charges, lift charges, curing, water leads, Seigniorage etc., complete for finished item of work (Upto 3.00 M Height over Basement)

581.28

-

214315.03

... More
Godown Complex;Plastering to Brick Masonry in two coats in 12mm thick. Base Coat in CM (1:5) prop; 8mm thick and Top Coat in CM (1:3) prop; 4mm thick with sponze finishing including cost and conveyance of all materials, labour charges, scaffolding charges, lift charges, curing, water leads, Seigniorage etc., complete for finished item of work (Above 3.00 M Height over Basement)

690

-

278827.62

... More
Godown Complex;Plastering with CM 2 coats, 20mm thick, basecoat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost and conveyance of all materials, labour charges, scaffolding charges, lift charges, curing, water leads, seigniorage etc., complete for finished item of work.

170

-

64872.85

... More
Godown Complex;Painting two coats with best synthetic enamel paint (Asian make) of approved colour to new iron work without primer coat including cost and conveyance of all materials to site of work, labour charges, scaffolding charges etc., complete for finished item of work.

115

-

12051.31

... More
Godown Complex;White cement paint two coats with best quality surya cem including cost and conveyance of all materials, labour charges, blue, brushes etc., complete for finished item of work.

600

-

22258.2

... More
Godown Complex;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labourcharge etc,. complete including contractors profit and over head charges etc complete.

685

-

147599.69

... More
Godown Complex;Manufacturing, Supplying and Fixing in position of 0.76 M x 0.76 M size Mild Steel Air Inlets with MS Angles having two frames of outer and inner side. The outer side frame is with 40 x 40 x 5 mm MS Angle with 12mm Square Rods @ 75mm c/c in both the ways (9 Nos. on each side) with alternative joints welded and a wire mesh welded to this frame of 25 x 25 x 25 x 3mm Z Angle with two glazed shutters frame of suitable angles including cost and conveyance of all materials and accessories, required such as hold fasts, tower bolts, wind appliances, packing for glass including labour charges for finished item of work including one coat of red oxide primer etc., complete as per the drawing and as directed by the Officer-in-charge of the work.

12

-

48324

... More
Godown Complex;Manufacturing, Supplying and Fixing in position 0.92 M x 0.46 M size Rotating Type Ventilators having two frames of outer side and inner side. The outer side frame with 40 x 40 x 5mm MS Angle fixed with 2 Nos. of 12mm Square Rods horizontally and 24 x 12 gauge wire mesh fixed to this frame from outside with 35 x 4mm MS Flat. The inner side frame of 25 x 25x 25 x 3mm Z Angle with rotating glazed frame fixed to inner frame with central pivoting arrangements including cost and conveyance of all materials required for the work, labour charges etc., complete for finished item of work including one coat of red oxide primer etc., complete as per the drawing and as directed by the Officer-in-charge of work.

16

-

40816

... More
Godown Complex;Tor Steel Reinforcement, Wrought and Put up including decoiling, bending, cranking, tying them after placing them in position as directed by Engineer-in-charge of work, including cost and conveyance of steel, binding wire etc., complete for all works for all heights.

10

-

556985

... More
Godown Complex;Supply & Fixing in position (inside opening) Rolling Shutters with guides for a clear opening of 2.45 M x 2.75 M of push and pull type of approved quality and design and as per ISI specifications with guaranteed 20 gauge and 75mm wide inter locking block steel of deep converse corrugation with single piece of sheet and balanced with steel pipe shaft including pressed steel bottom rail brackets, suspension shaft, top rolling spring including supply and fixing top cover with 1mm thick MS sheet providing necessary clamps, hold fasts including all other necessary fixtures with CM (1:3) prop; etc., complete for finished item of work for Rolling Shutters including 2 Nos. of Side Locks, 1 No. Middle Lock including one coat of red oxide of primer etc., complete for finished item of work.

4

-

102804

... More
Godown Complex;Supply and fixing of 600mm dia turbo Ventilators as per approved manufacturer specifications including cost of materials to site all incidental operational and labour charges, all types of taxes, scaffolding and lift charges, all types of tools and plants etc complete for finished item of work as directed by engineer incharge.

6

-

36000

... More
Godown Complex;Supply & Fixing of Self Supported Arc Shaped Gal Valume sheeting, Color compying to ASTM A792, base metal thickness 1.00mm, alloy coating AZ 150 (Aluminium 55%, Zin 43.50% and Silicon 1.5%), Yield Strength: 350 MPA, Paint coating regular modified polyster top coat 12 microns epoxy, top color: Combination of Blue and Off White and bottom color grey using make of Thyssen Krupps, Germany / Donghu Steel Co. ltd., Korea / Corus Steels, U.K / Union Steel, Korea / Yieh Phui Enterprises Ltd., Taiwan. The Steel Sheet shall be 3'-0" (914MM) width which shall be curved and moulded at site using mechanical press and dies to the desired curves and shape to form 2'-0" (605MM) wide interlocking panels. These panels shall be erected in position and the joints are seamed. The installation should be done by mechanized Vendor has to mobilize required number of Hydra for transportation of sheets and Cranes for the erection of seamed sheets and complete the entire work satisfactorily by using the fixtures like anchor fasteners, standard light hangers, turbo ventilators and sky lights etc., complete as per terms and conditions etc. complete for finished item of work.

769

-

1230400

... More
Godown Complex;Supply and Fixing of Varandah Truss of 2.40 M c/c. span made up of 60.30mm OD (Medium) for Top & Bottom Rafters and all other members with 48.30mm OD (Medium) Mild Steel Pipes including Supply & Fixing of 16mm dia 450mm length MS holding down bolts one side threaded (4 Nos) with MS Cleats of size 150mm x 75mm x 10mm thick and as per the working drawings, including cost and conveyance of all materials, labour charges, one coat of red oxide etc., complete for finished item of work.

9

-

60829.16

... More
Godown Complex;Supply and fixing of 4.00M long with 50 x50 x4.65mm MS Square Hollow pipe for purlin with side plates on either ends of size 75mm x 150mm x 6mm including cost and conveyance of all materials, labour charges for welding, fixing, one coat of red oxide, etc., complete for finished item of work.

24

-

80382.03

... More
Godown Complex;Supply and fixing of colour coated Galvalume roofing sheet thickness 0.50mm, with guard film ( Tolerance as +0.02mm) with alloy coating AZ 150 (Aluminium 55% Zinc 43.50% and Silicon 1.5%) Yield strength: 550MPA, paint coating Regular Modified paint/super durable paint top coat upto 25 microns and bottom coat 7-8 microns epoxy, and fixing to existing Trusses with EPDM Wasters of 12/55 & 12/25 where applicabe using self threading fasteners on existing trusses including transportation, taxes etc,. complete for finished item of work.

97.35

-

53328.33

... More
Godown Complex;Supplying and fixing clear 4mm thick polycarbonate sheets sky lights with necessary self tapping screws, washer etc, fixing firmly to the structural steel frame work and conseiling the joints with seal ants etc. complete as per drawing and as directed including cost and conveyance of all materials to site all operational incidental charges and labour charges and all taxes , J-bolts and nuts, washers, tools and plants lifting charges , scaffolding charges etc, at all heights and levels, complete for finished item of work as directed by engineer incharge.

3.6

-

10600

... More
Godown Complex;S & F of 110 mm dia ISI mark PVC - 4 Kg/sq.cm rain water spouts of 2.5mm thick including cost of necessary pvc bends, shoes and pvc clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, sales and other taxes on all materials, all operational incidental and Labour charges such as fixing in alignment etc, complete for finished item of work. (APSS NO.1328)

36

-

19549.32

... More
Godown Complex;Supplying and Laying of 25 mm dia 2.00 mm thick PVC pipe ISI Mark of sudhakar / Maco Plast / Modi make concealed in WALLS with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, including contractors profit and overhead.

350

-

31150

... More
Godown Complex;Wiring with Run off 2 of 1/1 40mm PVC copper cable (Find cable) with existing Metal conduit pipe for Light / Fan points with 5 Amps flush type switch (Anchor/Cona) make providing with metal concealed switch Board 8'x10' with necessary earth clips including cost of all materials, labour charges etc., complete for finished item of work.

22

-

12893.32

... More
Godown Complex;Supply and Fixing of 36/40 Watts Flourescent Street Light luminarie with sheet steel Aluminium and UV stablilized acrylic cover etc., completed fitting with 'U' clamps including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

10

-

19695.3

... More
Godown Complex;Supply and Fixing 36/40 Watts Patty Type Tube Light luminare power coated CRCA sheet housing with copper choke, and all standard accessoires of Wipro/GE/Philips make etc., fixing to walls etc., including cost of materials, labour charges etc, complete for finished item of work.

20

-

8868.2

... More
Godown Complex;Wiring with Run off 2 of 20.03 mm (1.50 sq mm) PVC insulated copper wire Phase and Nutral from main swith to switch board in common pipe of 20 mm dia 16 gauge MS conduit pipe etc., complete for finished item of work.

70

-

3668.05

... More
Godown Complex;Run off 10 square mm gauge weather proof twin core Aluminum cable along with GI barrier wire etc., including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

100

-

4005.65

... More
Godown Complex;Providing Independent Earthing to single-phase board, with 2.50 RM 40 mm dia GI pipe with copper plate with 4 Nos. of GI bolts and nuts and washers, drilling of 12 dia holes of numbers , 20 Kg salt, 40 Kg hard coke ,with an earth work excavation of 1.50M x 0.60 M x 0.90M depth including, screws, nails, labour charges etc., complete for finished item of work.

2

-

7089.38

... More
Godown Complex;Supply and fixing with 6A, 3 pin / 2 pin wall plug point with switch (Kosala / K ) make including cost and conveyance of materials, labour charges etc. complete for finished item of work.

1

-

88.61

... More
Godown Complex;Wiring with Run off 2 M of 14/0.3 mm dia FR Flexiable copper cable and fixing with 6 Amps 3/2 pin wall plug with flush type switch Anchor/ Cona make with including cost of materials and labour charges etc., complete for finished item of work.

4

-

1879.13

... More
Godown Complex;S&F of MCB 16 Amps heavy duty forceline fuse carriers with Double pole ion clad (DPIC) switch fixing on metal concealed 8?x10? board including cost of Hylum sheet with screws including all materials, labour charges etc., complete for finished item of work

1

-

825

... More
Godown Complex;Supply & Fixing of bulk headed fitting made up with Aluminium casting with 100 Wattes bulb including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

4

-

5311.36

... More
Godown Complex;Providing Name Board on Godown Wall a required height for the size of 3.50 M x 1.50 M duly applying two coats of synthetic enamel paint of base surface and writing the letters of required size with Synthetic Enamel Paint in Telugu and English version

1

-

2420

... More
Godown Complex;Providing U Channel of ISMC 150 of 75 x 150 x 75 x 9.00 mm thick is provided with 16 mm dia 600 mm long 3" threaded and other end welded with Ms plate and providing washers, nuts etc., complete for finished item of work.

25

-

27475

... More
Godown Complex;Cubes Testing Reports should be submitted duly consulting with the respective Engineering Department along with the certificates for the following spells of works a)Footings, b) Plinth Beam, c)Columns d)Tie Beam etc.,

4

-

40000

... More
Godown Complex;Third Party Analysis Report should be produced for every bill

1

-

60000

... More
Godown Complex;B) Construction of Hamalies Rest Room:- Earth work excavation in sand or loose soils wet sand not under water and all other soils except rock requiring blasting with initial lead and lift and depositing the same as directed by the Engineer-in-charge of work, labour charges etc., complete for finished item of work for foundations.

27

-

8702.64

... More
Godown Complex;Plain Cement Concrete (1:5:10) prop; using 40mm size hard blasted granite metal including cost and conveyance of all materials, labour charges, seigniorage, mixing, laying, curing, hire and operational charges of all tools and plants required for the work including all water leads and lifts etc., complete for finished item of work.

11

-

45413.72

... More
Godown Complex;VRCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finished item of work for RCC Footings

3.6

-

28493.46

... More
Godown Complex;VRCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finished item of work for RCC Columns

2.43

-

25056.75

... More
Godown Complex;VRCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finished item of work for Plinth Beam

2.51

-

25366.19

... More
Godown Complex;VRCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finished item of work for Tie Beam Slab level:

2.57

-

26121.69

... More
Godown Complex;VRCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finished item of work For Lintels.

0.35

-

3675.22

... More
Godown Complex;VRCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering etc., complete for finished item of work For RCC Slab.

6.2

-

66577.34

... More
Godown Complex;RCC M-20 using 20mm size HBG graded metal with 100 mm thick at fixed end and 75mm thick at free end of average thickness of 87.50mm thick and Plastering 12mm thick in CM (1:3) prop; on all surfaces including cost and conveyance of all materials and excluding cost of steel and its fabrication but including cost of centering, scaffolding, all leads and lifts and mixing, laying curing, vibrating, seigniorage, labour charges etc. complete for finished item of work For Sun shades

10

-

8901.79

... More
Godown Complex;PCC M-20 using 20 mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seigniorage charges, other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete for finished item of work, but including centering, shuttering etc., complete for finshed item of work For Bed blocks.

0.1

-

581.91

... More
Godown Complex;Random Rubble Stone Masonry in Cement Mortar (1:6) prop; using hard granite stone including cost and conveyance of all materials to site of work, labour charges, seigniorage, curing including all water leads etc., complete for finished item of work for foundations.

19.2

-

69635.14

... More
Godown Complex;Brick Masonry in Cement Mortar (1:6) prop; Using 2nd Class Bricks for super structure including cost and conveyance of all materials, seigniorage, labour charges, scaffolding, all leads & lifts, curing etc., complete for finished item of work.

24

-

140021.76

... More
Godown Complex;Plastering with CM 2 coats, 12mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing including cost and conveyance of all materials, labour charges, scaffolding charges, lift charges, curing, water leads, seigniorage etc., complete for finished item of work.

281

-

103603.3

... More
Godown Complex;Plastering 20mm thick to RR Stone Masonry in single coat in CM (1:5) prop; in sponge finishing including cost and conveyance of all materials, labour charges, scaffolding charges, lift charges, curing, water leads, seigniorage etc., complete for finished item of work.

123

-

46937.42

... More
Godown Complex;Supply and Fixing of 0.90 M x 2.10 M of Door Outer Frame with 45 x 45 x 5mm thick Angle Iron Frame 30 mm thick flush door shutter of solid bond wood block board type with commercial ply on both sides and 2 Nos. of Mild Steel Tower Bolts and 1 No. 250mm long Mild Steel Aldrop and 3 Nos. of Mild Steel 100 long Butt Hinges, one coat of red oxide and 2 coats of synthatic enamel paint etc., complete for finished item of work.

6.6

-

21192.6

... More
Godown Complex;Supply and Fixing of 0.90 M x 1.20 M size Mild Steel Window Frame and Shutters using with 25 x 25 x 25 x 3mm Z Angle and Shutters provided with 4mm thick pin headed glasses, hold fasts, one coat of red oxide primer, labour charges for fixing in position, transportation etc., complete for finished item of work.

4.32

-

13698.72

... More
Godown Complex;White Cement paint two coats including cost and conveyance of all materials, labour charges, blue, brushes etc., complete for finished item of work.

170

-

6306.49

... More
Godown Complex;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labourcharge etc,. complete including contractors profit and over head charges etc complete for finished item of work.

170

-

36630.58

... More
Godown Complex;Painting two coats with best synthetic enamel paint 1st quality (Asian make) of approved color to new iron work without primer coat including cost and conveyance of all materials to site of work, labour charges, scaffolding charges etc. complete for finished item of work.

25

-

2619.85

... More
Godown Complex;Supply & Fixing of European water closet of 1st quality conforming to IS:2556 Part-2-1973 of white glazed with "P"(or) "S"trap including best Indian Plastic seat and lid, PVC low level system with internal components & short bend with 10Ltrs capacity single flush, Health faucet including cost of Labour charges for fixing, transportation etc., for complete finished item of work.

2

-

9336.8

... More
Godown Complex;Supply and Fixing of 4'.0" dia with 40mm thick 1'.0 depth Reinforced Concrete Rings 7 Nos. and 4'.0" dia RCC Cover for Septic Tank including jointing Rings in CM (1:3) prop. bottom Flooring with CC (1:5:10) prop; 100 mm thick using 40 mm HBG Metal and over it 12mm thick plastering with CM (1:3) including cost and conveyance of all materials, labour charges earth work etc., complete for finished item of work.

1

-

5303.6

... More
Godown Complex;Supply and Fixing of 110 mm single socket pipe of 3 Mts length of 6 Kg/CM2 of approved make including cost and conveyance of all materials to site of work, labour charges, transport charges, fixing charge etc., complete for connection to Toilet WC and septic tank.

3

-

2313.3

... More
Godown Complex;Supply and Fixing of 90 mm single socket pipe of 3 Mts length of 4 Kg/CM2 of approved make including cost and conveyance of all materials to site of work, labour charges, transport charges, fixing charge etc., complete for Air pipe over septic tank.

6

-

2567.4

... More
Godown Complex;Supply & Fixing of 1" dia UPVC Pipe including cost of UPVC Pipe, Labour Charges for fixing, transportation of Pipe etc., complete for finished item of work

50

-

1320

... More
Godown Complex;Supply & Fixing of 1/2" dia UPVC Pipe including cost of UPVC Pipe, Labour Charges for fixing, transportation of Pipe etc., complete for finished item of work

50

-

1100

... More
Godown Complex;Supply & Fixing of 12.70 mm N.P bib tap Indian make heavy duty Spike / Senior / Nice or equivalent etc., complete for finished item of work.

4

-

1535.6

... More
Godown Complex;Supply & Fixing of Syntax Tank 500 Ltrs with all accessories including cost and conveyance its fittings etc., complete for finished item of work

1

-

3850

... More
Godown Complex;Supply of Nahani Traps of 4" dia including cost and conveyance its fittings etc., complete for finished item of work

2

-

182.6

... More
Godown Complex;Supply of PVC pipe of 75 mm 3 mm single socket PVC / SWR pipe 4 Kgs / CM2 Prime / Sudhakar / Kisan / Supreme or any ISI brand etc., complete for finished item of work.

2

-

475.2

... More
Godown Complex;Supply & Fixing of TV shape Mirror with plastic frame of size 609.6 mm x 457.2 and labour charges etc., complete for finished item of work.

2

-

994.4

... More
Godown Complex;Supply & Fixing of 25.44mm & 609.6mm length Aluminium Anodized Towel Rod with brackets and aluminium screws etc., complete for finished item of work.

2

-

321.2

... More
Godown Complex;Flooring with Ceramic Tiles of 1st quality of approved make & color not less than 7.3 mm thick in all shades and designs over a base coat of Cement Concrete (1:8) prop including cost of color pegment for jointing the tiles to match the tiles, cost and conveyance of all materials to site of work etc., complete for finished item of work for Toilet Flooring.

37

-

34466.98

... More
Godown Complex;Dadoing Walls with Ceramic decorated white background glazed wall tiles of any size end of 5 to 7 mm thick of 1st quality of approved color and make in CM (1:5) prop; using jointed with color cement to match the tiles including cost and conveyance of all materials to site, labour charges, curing etc., complete for finished item of work.

20.04

-

10663.42

... More
Godown Complex;Supply & Fixing of RCC Jali Ventilators of size 0.75 M x 0.60 of approved make including fixing charges, labour charges etc., complete for finished item of work.

0.72

-

196.42

... More
Godown Complex;Wiring with Run off 2 of 1/1.40 mm PVC copper cable (Finolex cable) with GI wire for earth continuity in ¾? or metal conduit pipe for light points with 5 Amp SPT switch (Kosala/K) providing with metal concealed switch Board 8?x10? with necessary earth clips including cost of all materials, labour charges etc., complete for finished item of work.

10

-

5860.6

... More
Godown Complex;Supply & Fixing of approved make ISI mark Tube Light Fitting 4?-0?, 40W, 230 V tube, choke, starter (My sore / Compton / Anchor) fixing to walls etc., including cost and conveyance of materials, labour charges etc., complete for finished item of work.

3

-

1330.23

... More
Godown Complex;Supply & Fixing of 100 W bulb including cost and conveyance of all materials like holder and wire, labour charges etc., complete for finished item of work.

4

-

352

... More
Godown Complex;Supply & Fixing of approved make of 48" (1200mm) Sweep Ceiling Fan of Cromptom make High speed / Bajaj G Gold / Havells Duo / Usha Striker / Orient Summer Pride etc., complete for finished item of work

2

-

5821.76

... More
Godown Complex;Supply & Fixing of bulk headed fitting made up with Aluminium casting with 100 Wattes bulb including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

2

-

2655.68

... More
Godown Complex;Supply & Fixing with 6A, 3 pin / 2 pin wall plug point with switch (Kosala / K ) make including cost and conveyance of materials, labour charges etc. complete for finished item of work.

7

-

620.27

... More
Godown Complex;Supply & Fixing of MCB 16 Amps heavy duty Forceline Fuse Carriers with Double Pole Ion Clad (DPIC) Switch fixing on metal concealed 8?x10? board including cost of Hylum sheet with screws including all materials, labour charges etc., complete for finished item of work

2

-

1650

... More
Godown Complex;Providing independent earthing to single-phase board with 1 ? dia GI pipe 1.30 M length, GI wire , nails, earthwork excavation for pit salt coal labour charges etc., complete for finished item of work.

1

-

3544.69

... More
Godown Complex;Run off 7/20 weather proof twin core Aluminum Cable along with GI bearer wire etc., and support with Shakleel insulator including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

50

-

2003

... More
Godown Complex;Filling Basement and Foundations with Gravel in layers of 15cms, watering, ramming including all water leads and consolidation including all leads and lifts, seigniorage etc., complete for finished item of work.

22

-

14550.58

... More
Godown Complex;Tor Steel Reinforcement, Wrought and Put up including de-coiling, bending, cranking, tying them after placing in position as directed by Engineer-in-charge of work, including cost and conveyance of steel binding wire etc., complete for all works for all heights.

1.4

-

77977.9

... More
Godown Complex;Drilling of Bore well with 1.5HP Motor including casing, labour charges, wiring, panel board, etc., all necessary fittings, etc., including all cost & conveyance of all the materials etc., for complete finished item of work.

1

-

100000

... More
Godown Complex;C) Providing WBM Road to Approach and Internal Road: Supply of JCB to the site for Removal of debris material on the existing road and clear away the materials from the site duly loading the materials into trucks for filling at low level area including hire and operational charges of all tools and plants etc., complete for finished item of work.

15

-

12750

... More
Godown Complex;Granular Sub-base/base/surface course with local materials by mix in place method normal construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method and compacting with smooth wheel roller to achieve the desired density complete for furnished item of work.

564

-

569640

... More
Godown Complex;Providing, laying, spreading and compacting stone aggregates of 63mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 10T capacity road roller applying and brooming, crushable, screening to fill-up the interstics of coarse aggregate, watering and compacting to the required density grading etc., complete for finished item of work.

127

-

296037

... More
Godown Complex;Providing, laying, spreading and compacting stone aggregates of 40mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 10T capacity road roller applying and brooming, crushable, screening to fill-up the interstics of coarse aggregate, watering and compacting to the required density grading etc., complete for finished item of work.

127

-

328168



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.