Andhra Pradesh Solar Power Corporation Private Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Solar Power Corporation Private Limited - APSPCL Tender
Civil And Construction
Water Storage And Supply
Opening Date23 Mar 2022
Closing Date2 May 2022
Tender Amount₹ 1,62,46,680
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
489671Bid Award Id
ViewTender No
APSPCL-e-C- 33/2021-22Tender Authority
Andhra Pradesh Solar Power Corporation Private Limited ViewPurchaser Address
-Website
http://https://www.apspcl.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Civil Work;Excavation in hard rock by blasting including boulders above 1.2 m dia. for Laying of Pipe line, tank sluice approach channel etc., including leveling bed by removing all projections by hammering / chiseling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and leveling the same as directed etc., complete with initial lead up to 1 km and all lifts, including cost and conveyance of all materials, machinery and labour chargers, dewatering, all leads and lifts complete for finished item of work as directed by Engineer in Charge and as per SS No. 203 and 301 of APDSS.
1700
-
627300
... More
Civil Work;Providing PCC 1:3:6 nominal mix for sluice walls, abutments, man hole chambers, pedestals and other concrete items using 20 mm & 40 mm HBG metal, mechanically mixed and compacted by vibration, shuttering, Centering charges, dewatering, curing etc., complete as per drawings and as per SS 402 of APDSS
200
-
1020800
... More
Civil Work;Providing RCC grade M20 design mix using minimum cement content of 300 kg / Cum for construction of RCC Channel from tank sluice to field channel using 20 mm graded HBG metal mechanically mixed placed in the form works and compacted by vibration including cost of all materials, dewatering, labour, all leads and lifts etc complete as per drawings, technical specification and as per SS No: 402 and 403 of APDSS. The rate is excluding reinforcement steel & its fabrication and centering & shuttering charges which will be measured paid separately.
200
-
1102400
... More
Civil Work;Providing rigid Steel centering, shuttering and scaffolding using steel pipes, adjustable Jack screw props, acro spans, couplers, tie rods, bracings members, supporting brackets, acro span beams and steel plate/ ply-wood form work as per the approved shuttering designs & plan and other accessories as per the IS Norms and stability calculations including hire charges for jack pipes, acro spans, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work as directed by the Engineer-in-charge. (Measurement will be given on one face of the wall only)
870
-
1000500
... More
Civil Work;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size, tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance all materials, all wastages such as overlaps, couplings, chairs, spacer bars etc, all incidental, operational, labour charges etc., complete for finished item of work at all elevations as directed by the Engineer-in-charge.
20
-
1722980
... More
Civil Work;Providing and constructing 300 mm thick dry rubble stone pitching at Slopes of the Tank bund / field channels wherever required including cost of all materials, labour, hand packing, finishing etc., complete as directed by Engineer - in - Charge and as per SS No: 619 of APDSS.
3000
-
1488000
... More
Civil Work;Drilling 45 to 50 mm dia holes vertical or inclined in the tank bed by percussion drilling up to 12 m depth using wagon drill or any other suitable equipment for curtain grouting including cost and conveyance of all materials, machinery, labour, re drilling through partially set grout wherever required etc., complete for finished item of work as directed by the Engineer- in- Charge.
3700
-
1346800
... More
Civil Work;Flushing grout holes of all sizes with water and air jets alternatively for an average period of 30 minutes including water intake observations after flushing, cost and conveyance of all materials, machinery, labour etc., complete for finished item of work as directed by the Engineer- in- Charge.
3700
-
432900
... More
Civil Work;Consolidation/Curtain grouting with neat Cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost and conveyance of all materials, machinery, labour, re drilling if necessary etc., complete with all leads and lifts etc., complete for finished item of work as directed by the Engineer-in-charge
80
-
868000
... More
Civil Work;Forming embankment with borrowed useful earth by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc complete for finished item of work as directed by the Engineer-in-charge and as per MoRT&H specification 305 (4th revision). Payment will be made based on level for finished item of work.
6000
-
1284000