Andhra Pradesh Rajiv Swagruha Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Rajiv Swagruha Corporation Limited - APRSCL Tender
Civil And Construction
Civil Works Others
Opening Date23 Dec 2022
Closing Date11 Jan 2023
Tender Amount₹ 2,18,06,618
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 20,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577561Bid Award Id
ViewTender No
03/APRSCL/CE/RCHT/2022-23 dated 22.12.2022Tender Authority
Andhra Pradesh Rajiv Swagruha Corporation Limited ViewPurchaser Address
-Website
http://http://rajivswagruhaap.gov.in/ais/index.php
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supply, & Delivery of OD 160mm Dia. HDPE BENDS (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes. to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., complete for finished item of work. including overhead charges & Contractors profit.
2
-
863.5
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Supply and delivery of Rubber Packing 6mm thick including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .), including overhead charges & Contractors profit.
32.4
-
3423.38
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.), including overhead charges & Contractors profit.
108
-
13618.8
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Re-filling with useful available excavated earth (excluding rock) in trenches, sides of Foundations upto ground level with standard specifications in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work (APSS No.309 & 310), including overhead charges & Contractors profit.
2029.77
-
790087.97
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Construction of Brick masonry Valve Pit of size 3'-0" x 3'-0" required for sluice valveS, scour valves & Air Valves including all civil works such as earth work excavation up to 1.32 mts. 4" thick PCC(1:5:10)Prop., brick masonry in CM(1:8) Prop.,12mm thick plastering in CM(1:4) including 4"thick RCC M30 Grade design mix with necessary reinforcemnt including cost of steel and its fabrication chares for cover slab, and smooth rendering etc., complete as directed by department, including overhead charges & Contractors profit.
9
-
129706.38
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Scour Valve including overhead charges & Contractors profit.
2
-
666.08
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Sluice Valve including overhead charges & Contractors profit.
5
-
1665.2
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 150mm Dia. Sluice Valve including overhead charges & Contractors profit.
2
-
1017.54
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Lowering and keeping in position of 100 mm Dia. Scour valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work, including overhead charges & Contractors profit.
1
-
206.05
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Lowering and keeping in position of 100 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work , including overhead charges & Contractors profit.
5
-
1030.25
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work, including overhead charges & Contractors profit.
2
-
698.4
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete for finished item of work, including overhead charges & Contractors profit.
1867
-
59800.01
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete for finished item of work, including overhead charges & Contractors profit.
383
-
19483.21
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Filling with Sand for Basements and sides of Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work (APSS No.309 & 310), including overhead charges & Contractors profit.
202.5
-
165240
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Earth work excavation for pipe line trenches in ordinery soils by mechanical means upto 3mts depth and depositing on bank with an initial lead of 10mts incluidng all labour charges shuch as shoring, sheeting, planking, strutting and excluding dewatering charges etc., complete for for finished item of work as directed by the Engineer-incharge, including overhead charges & Contractors profit.
1215
-
150417
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
2
-
2042.8
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
17
-
8981.1
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
17
-
9966.25
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
2
-
4194.7
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
13
-
7813.65
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
2
-
3488
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Supply & Delivery of Tamper Proof DI Flanged Single Chamber Air Release Valves of Dia 150mm PN 1.0 (MPa) with body & cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005. All internal parts such as Float, shell, Cove Bolts etc. made of Austenitic alloy steel of SS AISI 304/316 and DN 50 float of and other components with ABS/PTFE/EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination Flange drilling as per IS - 1538 and exclusive of all taxes and transportation for 150mm dia Air Valve, including overhead charges & Contractors profit.
1
-
54852.2
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Supply, Delivery of D.I double flanged short/Long body or Wafer Type pattern Butterfly Valves/Sluice Valves of Dia 150mm PN 2.5(MPa) conforming to IS 13095 (with up to date amendments, if any) manually operated having Body, Disc with D.I; Shaft, Seating ring, internal fastenings with Stainless steel (IS: 6603); External bolting with Carbon steel; Seat with Nitrite or EPDM rubber; excluding transportation and all taxes, complete. for 100 mm dia Scour valve, including overhead charges & Contractors profit.
1
-
19421.35
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Supply, Delivery of D.I double flanged short/Long body or Wafer Type pattern Butterfly Valves/Sluice Valves of Dia 150mm PN 2.5(MPa) conforming to IS 13095 (with up to date amendments, if any) manually operated having Body, Disc with D.I; Shaft, Seating ring, internal fastenings with Stainless steel (IS: 6603); External bolting with Carbon steel; Seat with Nitrite or EPDM rubber; excluding transportation and all taxes, complete. for 100 mm dia Sluice valve, including overhead charges & Contractors profit.
5
-
97106.75
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Supply, Delivery of D.I double flanged short/Long body or Wafer Type pattern Butterfly Valves/Sluice Valves of Dia 150mm PN 2.5(MPa) conforming to IS 13095 (with up to date amendments, if any) manually operated having Body, Disc with D.I; Shaft, Seating ring, internal fastenings with Stainless steel (IS: 6603); External bolting with Carbon steel; Seat with Nitrite or EPDM rubber; excluding transportation and all taxes, complete. for 150 mm dia Sluice valve, including overhead charges & Contractors profit.
2
-
57214.3
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 10.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc.,including Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
1867
-
1120013.3
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 10.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc.,including Excise duty, Sale Tax and speicals etc., complete for finished item of work, including overhead charges & Contractors profit.
383
-
486505.75
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Filling Sand for below pipe line with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work as directed by the Engineer-incharge, including overhead charges & Contractors profit.
479.38
-
391174.08
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Earth work excavation for pipe line trenches in ordinery soils by mechanical means upto 3mts depth and depositing on bank with an initial lead of 10mts incluidng all labour charges shuch as shoring, sheeting, planking, strutting and excluding dewatering charges etc., complete for for finished item of work as directed by the Engineer-incharge, including overhead charges & Contractors profit.
1438.14
-
178041.73
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Construction of 3'-0" dia.(904mm)Solid block masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 12mm thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 3'-0" (904mm) in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work, complete for finished item of work and as directed by the Engineer-incharge, including overhead charges & Contractors profit.
128
-
918521.6
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Construction of 3'-0" dia.(1524mm)Solid block masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 12mm thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 5'-0" (1524mm) in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work, complete for finished item of work and as directed by the Engineer-incharge, including overhead charges & Contractors profit.
40
-
451734
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture ,Supply and Delivery of 200mm Dia. (S.16.5) unplasticized Non-pressure Polyvinyl Chloride (PVC-U) Pipes of dark (any shade of Brown) for use in Underground Drainage & Sewerage System conforming to IS.15328/2003) with Solvent Cement Jointing as per specification including transportation charges to work site , loading, unloading, and testing of pipes complete for finished item of work and as directed by the Engineer-incharge, including overhead charges & Contractors profit.
660
-
747615
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture, Supply and Delivery of 160mm Dia. (S.16.5) unplasticized Non-pressure Polyvinyl Chloride (PVC-U) Pipes of dark (any shade of Brown) for use in Underground Drainage & Sewerage System conforming to IS.15328/2003) with Solvent Cement Jointing as per specification including transportation charges to work site , loading, unloading, and testing of pipes as per the directions of the department, including overhead charges & Contractors profit.
318.82
-
232563.25
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Manufacture ,Supply and Delivery of 110mm Dia. (S.16.5) unplasticized Non-pressure Polyvinyl Chloride (PVC-U) Pipes of dark (any shade of Brown) for use in Underground Drainage & Sewerage System conforming to IS.15328/2003) with Solvent Cement Jointing as per specification including transportation charges to work site , loading, unloading, and testing of pipes complete for finished item of work and as as per the directions of the department, including overhead charges & Contractors profit.
2344.4
-
809755.76
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Construction of subgrade and Gravel/Earthen(using naturally occuring Gravel) Shoulders with approved/selected material obtained from borrow pits with a;ll lifts and leads, transporting to site, spreading, grading to required slopes and compacted to meet reqiurement of Table 300-2(Shoulders with Gravel), complete for finished item of work and as directed by the Engineer-incharge, including overhead charges & Contractors profit.
1387.79
-
390440.84
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade, including overhead charges & Contractors profit
3165
-
440093.25
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4th revision) and as directed by the Engineer-in-Charge. including overhead charges & Contractors profit
11069.89
-
127525.13
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Providing and laying 30 mm thick Semi-Dense Bitumious Concrete with 100 -120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of Grading - II, premixed bituminous binder of VG-30 grade @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic pavour finisher with sensor control to the required grade, level and alignment , rolling with smooth whelled , vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause 508 complete in all respects for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all and all other contingent charges necessary , complete and as per MoRTH specification No. 508, inluding OH & CP charges.
237.15
-
2184934.1
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) including overhead charges & Contractors profit.
395.24
-
2806935.19
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. including overhead charges & Contractors profit
1185.73
-
2329010.87
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Construction of Granular Sub-Base by providing coarse graded material(naturally occuring gravel), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401.(GSB) including overhead charges & Contractors profit.
1624.32
-
848983.33
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres etc., complete for finished item of work and as directed by the Engineer-incharge including overhead charges & Contractors profit.(MORTH 301 of Sl. No.3.9)
1698.27
-
982160.49
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Excavation for roadway in hard rock (blasting prohibited) with rock breakers including, breaking rock loading in tippers and disposal within all lifts and lead upto upto 1000 metres, trimming bottom and side slopes in accordancee with trquirements of lines, grades and cross sections and finished item of work as directed by the Engineer-incharge including overhead charges & Contractors profit.(MORTH 301 of Sl. No.3.8)
3962.68
-
4425441.77
... More
Providing Balance Infrastructure works such as BT Roads, Ext. water supply lines, Ext. sewerage line;Excavation for road way in soil by mechanical means ncluding cutting and pushipng the earth to site of embankment upto a distance of 100 mts (average lead 50mts) including trimming bottom and side slopes in accrodance with requirments of lines grades and cross sections etc., complete for finished item of work and as directed by the Engineer-incharge, including overhead charges & Contractors profit.
1082.88
-
133356.67