Andhra Pradesh Power Generation Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
Agriculture or Forestry Works
Opening Date11 Oct 2022
Closing Date20 Oct 2022
Tender Amount₹ 9,96,635
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
551903Bid Award Id
ViewTender No
NIT.No.e-16/2022-23/SE/C/O&M/Dr.NTTPSTender Authority
Andhra Pradesh Power Generation Corporation Limited ViewPurchaser Address
-Website
http://apgenco.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
clearing of jungle inside and outside of the compound wall;Removing stumps, tree roots upto 1.5Mtrs girth including excavation and levelling the surface,after stump removal, conveying and stacking materials neatly with 2KM lead and over initial leads and all lifts etc., complete for finished item of work as directed by the Engineer-in-charge at site.
160
-
12168
... More
clearing of jungle inside and outside of the compound wall;Removal and clearing of silt & jammu including weed growth in wet condition deposited in the storm water drain and deposit the wet soil in the form of stacks on the bank of drain 20 M away from the bank of drain with initial lead of 50M and lift of 3M including labour charges for removal and formation of cross bunds across the drain using the available soil from the surrounding area in order to remove the soil completely upto bed level, dewatering charges, hire charges of T& P required and diesel pump and the cross bunds are to be removed completely after removal of silt with all leads and lifts etc., complete for finished item of work as directed by the Engineer ?in-charge.
1060
-
155841.2
... More
clearing of jungle inside and outside of the compound wall;Removal and Conveyance of dry silt accumulated on both sides of the banks of the strom water drain and depositing in low lying areas with a lead of 2Km in addition to the initial lead and lifts etc., complete for finished item of work as directed by the engineer in charge.
116
-
8704.64
... More
clearing of jungle inside and outside of the compound wall;Removal of Garbage and Debris accumulated to the grills during rainy times on war footing basis, duly engaging the labour round the clock whenever necessary including labour charges, hire charges for T&P required and safety equipments and dispose the debris in low lying areas with all leads and lifts etc., complete for finished item of work as directed by the engineer-in-charge. (1 Job = 3 Nos man mazdoors)
9
-
10985.67
... More
clearing of jungle inside and outside of the compound wall;Conveaynce of ash, debris, silt and coal dust and other waste material including clearing of dust bins at various locations in storage godowns and wagon tipplers areas, and road side berms etc, and dumping in low lying areas with a lead of 2KM in addition to the initial lead and lift etc., complete for finished item of work as directed by the Engineer-in-charge.
230
-
17259.2
... More
clearing of jungle inside and outside of the compound wall;Excavation and removal of ash, silt, earth stones and debris etc., along with impornea cornea under water from drains and depositing on the road side berms and conveying the same to low lying areas with in 1km lead and including clearing of jungle, grass of 1.00M width on either side of drain etc., complete for finished item of work as directed by the Engineer-in-charge at site.
470
-
84195.8
... More
clearing of jungle inside and outside of the compound wall;Cutting, clearing and disposing of debris from the roofs of storage sheds/buildings, ie., wet and dry tree branches,leaves, removing small tree branches suspended/fallen on roofs of storage godowns of stage I, including cost and conveyance machinery, tools and plants, wood cutting saw etc., and conveying the same to low lying areas with in 1km lead etc., complete for finished item of work as directed by the engineer in charge at site.
10
-
20343.8
... More
clearing of jungle inside and outside of the compound wall;Regular Maintenance of plants (about130 Nos) for one year Including watering,weed removal,mulching,appling manures,pesticides and replacement of plants whe4never and wherever necessary including cost of plants all tools and tackles etc.,complete as directed by the Engineer-in -charge.(Excluding cost of manures, pesticides etc., which will be supplied by the Department at free of cost.
7
-
8134
... More
clearing of jungle inside and outside of the compound wall;Earthwork excavation in loamy and clayey soils like B.C.soils, Red earth,stone earth and ordinary gravel with initial lead and lift and leveling the ground by removing the excavated earth and conveying the same to low lying areas with 1 KM lead,all taxes etc., complete for finished item or work as directed by the Engineer in charge at site.
240
-
66136.8
... More
clearing of jungle inside and outside of the compound wall;Dismantling of PCC/RCC including all labour charges, all leads and lifts, cost/hire charges of all tools required for dismantling, carting the debris to low lying areas with 2Km lead etc complete as directed by the Engineer in charge for finished item of work.
8
-
10525.68
... More
clearing of jungle inside and outside of the compound wall;Construction of brick masonary with CM (1:5) using flyash bricks for walls/damaged drains etc., inlcuding cost and conveyance of all materials, labour charges for curing with all leads and lifts etc., complete for finished item of work and as directed by the Engineer-in-charge but excluding cost of cement and fly ash bricks which will be supplied by the department at free of cost.
10
-
19755.5
... More
clearing of jungle inside and outside of the compound wall;Plastering in CM(1:4) 12 mm thick inlcuding cost and conveyance of all materials, labour charges, mixing, curing, scaffolding with all leads and lifts etc., complete for finished item of work and as directed by the Engineer-in-charge but excluding cost of cement which will be supplied by the department at free of cost.
100
-
27925.3
... More
clearing of jungle inside and outside of the compound wall;Labour charges for straightening, cutting, bending of RTS/MS bars to required sizes and shapes, placing in position for all sizes and all RCC works tying and lap-splicing with binding wire of 18 SWG, for reinforcement work as per approved designs and drawings, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,tying with all leads and lifts etc., complete for finished item of work in all levels as directed by the Engineer-in-charge but excluding cost of reinforcement steel which will be supplied by the department at free of cost.
0.15
-
2019.81
... More
clearing of jungle inside and outside of the compound wall;Providing R.C.C.M25 grade, using 20mm and 12 mm size HBG machine crushed metal and including cost and conveyance of all materials,all labour charges,shuttering charges, machine mixing,laying concrete,vibrating, curing, rendering smooth finishing for exposed surface with c.m (1:2) all leads and lifts etc., complete for finished item of workas directed by the Engineer-in- charge but excluding cost of cement and steel which will be supplied by department at free of cost.
3
-
18042.24
... More
clearing of jungle inside and outside of the compound wall;Replacement of damaged plain glass fixing with 4mm thick plain glass including cost and conveyance of glass putty pins and 4mm thick plain glass,all labour charges with all leads and lifts etc.,complete for finished item of work as directed by the Engineer-in-charge.
12
-
11266.32
... More
clearing of jungle inside and outside of the compound wall;Replacement of damaged ACC sheet Roofing duly removing the old and damaged ACC sheets at all heights carefully , with corrugated AC sheets of 6mm thick inlcuding 150mm over lapping for sheds including cost and conveyance of all materials such as ACC sheets, 8mm GI bolts and nuts and limpet washers, hook bolts, nuts and BT washers, all labour charges, cost of T&P required, all incidental charges, conveyance of removed sheets to the yard with in a distance of 1km lead, with all lifts etc., complete for finished item of work and as directed by the Engineer-in-charge.
190
-
73725.7
... More
clearing of jungle inside and outside of the compound wall;Replacement of damaged ACC ridge pieces for Roofing duly removing the old and damaged at all heights carefully with 6 mm thick corrugated asbestos cement sheets, fixing with G.I ?J? bolts &nuts 8 mm dia, G.I limpet washers and including cost and conveyance of all materials, all labour charges cost of T&P including seigniorage charges etc., all incidental charges, conveyance of removed pieces to the yard with in a distance of 1km lead, with all lifts etc., complete for finished item of work and as directed by the Engineer-in-charge.
150
-
55800
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of hydraulic Door closer of automatic hyper brand of IS 3564with double speed adjustment with necessary accessories, screws etc., including cost and conveyance of all materials, all labour charges etc., complete for finished item of work as directed by the engineer in charge.
5
-
4642.8
... More
clearing of jungle inside and outside of the compound wall;Labour charges for dismantling of RCC including cost and conveyance of all tools, all labour charges, all leads and lifts, carting the debris to low lying areas with 2Km lead etc complete for finished item of work as directed by the Engineer-in-charge for finished item of work.
2.5
-
6607.9
... More
clearing of jungle inside and outside of the compound wall;Laying PCC M20 using 50% of 40mm crushed metal and 50% of 20mm crushed metal including cost and conveyance of all materials,all labour charges, machine mixing, ramming curing, etc with all leads and lifts etc complete for finished item of work as directed by the engineer in charge but excluding cost of cement which will be supplied by the department at free of cost.
6
-
18140.4
... More
clearing of jungle inside and outside of the compound wall;Labour charges for repairs to the damaged Aluminium doors at different locations including replacement of damaged rubber beading, AA clips,hinges with new one and adjust the door shutter for free movement, cost of materials like rubber beading,AA clips and hinges etc,hire charges for drilling machine etc,complete for finished item of work as directed by the Engineer incharge at site.
6
-
15198.54
... More
clearing of jungle inside and outside of the compound wall;Construction of RR masonry in CM (1:6) to correct line, level and slopes for drains by using hard broken stone of granite variety including cost and conveyance of all materials, all labour charges, all leads and lifts, curing etc., complete for finished item of work as directed by the Engineer in charge but excluding the cost of Cement will be issued by the department at free of cost.
11.5
-
32497.28
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of different sizes of GI pipe of 'B' class with GI specials including the cost of pipe & its fittings, GI bends and conveyance of all materials with all leads & lifts, all labour charges etc., complete for finished item of work as directed by the engineer in charge. a)S&F of 15mm dia GI pipe
56
-
11009.6
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of different sizes of GI pipe of 'B' class with GI specials including the cost of pipe & its fittings, GI bends and conveyance of all materials with all leads & lifts, all labour charges etc., complete for finished item of work as directed by the engineer in charge. b)S&F of 20mm dia GI pipe
45
-
9747
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of different sizes of GI pipe of 'B' class with GI specials including the cost of pipe & its fittings, GI bends and conveyance of all materials with all leads & lifts, all labour charges etc., complete for finished item of work as directed by the engineer in charge c)S&F of 25mm dia GI pipe
40
-
11144
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing 12.7 mm brass stop cock Indian make 300 grams, including the cost of material and conveyance of all materials with all leads & lifts, all labour charges etc., complete for finished item of work as directed by the engineer in charge.
25
-
5405
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of 12.7 mm dia NP pillar cock Ist quality Indian make Seiko or equivalent, including the cost of NP pillar cock and conveyance of all materials with all leads & lifts, all labour charges etc., complete for finished item of work as directed by the engineer in charge.
13
-
7207.2
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of 12.7 mm dia Nylon connections Ist quality Indian make, including the cost of material and conveyance of all materials with all leads & lifts, labour charges etc., complete for finished item of work as directed by the engineer in charge.
25
-
2450
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of GI Fittings of different sizes including the cost of NP pillar cock and conveyance of all materials with all leads & lifts, labour charges etc., complete for finished item of work as directed by the engineer in charge.a)GI Union of 12.7mm 1st quality
13
-
520
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of GI Fittings of different sizes including the cost of NP pillar cock and conveyance of all materials with all leads & lifts, labour charges etc., complete for finished item of work as directed by the engineer in charge.b)GI Union of 19.05mm 1st quality
13
-
624
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of GI Fittings of different sizes including the cost of NP pillar cock and conveyance of all materials with all leads & lifts, labour charges etc., complete for finished item of work as directed by the engineer in charge c)GI Union of 25.4mm 1st quality
13
-
949
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of GI Fittings of different sizes including the cost of NP pillar cock and conveyance of all materials with all leads & lifts, labour charges etc., complete for finished item of work as directed by the engineer in charge d)GI connector 25.4mm dia
13
-
1040
... More
clearing of jungle inside and outside of the compound wall;Supply and fixing of GI Fittings of different sizes including the cost of NP pillar cock and conveyance of all materials with all leads & lifts, labour charges etc., complete for finished item of work as directed by the engineer in charge e)GI 'T' of size 12.7mm A class 1st quality
13
-
637
... More
clearing of jungle inside and outside of the compound wall;Carrying out fogging operations in stage-I godowns areas, wagon tipplers and BOBR areas using mobile fogging machine of desired capacity as directed by the engineer in charge .including hire charges of fogging machine, conveyance all labour charges, all leads and lifts tools and tackles ,safety emenities,cost and conveyance of consumables execpt king fog chemical issued by department at free of cost .(1 job includes carrying out fogging operations along godowns,tipplers and BOBR roads for about 3.5 km)complete for furnished item of work as directed by the engineer in charge.
7
-
25237.59
... More
clearing of jungle inside and outside of the compound wall;Providing Antilarva operations for storm water drain and internal drains located at Marshalling Yard, Stage-I Godowns for every month, including cost and conveyance of all materials like petrol, and hire charges of power sprey machine, all leads and lifts, all safety amenities, all labour charges and other incidental charges complete (1 job includes carrying out about 5.2 km) for finished item of work as directed by the Engineer-in-charge
7
-
24596.18
... More
clearing of jungle inside and outside of the compound wall;Upkeeping of roads infront of godowns of stage I area(weekly 3 times at storage godowns areas) clearing dry leaves and picking the grass , racking and removal of dirt formed, removal of wastages and brooming, stacking the deposits and conveyance of the debris to low lying areas including all T&P, all labour charges ete,. complete for finished item of work as directed by the engineer -in-dharge.
21
-
8544.48