Andhra Pradesh Power Generation Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
Electrical and Electronics
Electrical Works
Opening Date12 Jun 2023
Closing Date20 Jun 2023
Tender Amount₹ 5,46,878
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
632976Bid Award Id
ViewTender No
E-14/2023-24 of CE/O&M/Dr.NTTPS(SE/O&M/Stage-IV)Tender Authority
Andhra Pradesh Power Generation Corporation Limited ViewPurchaser Address
-Website
http://apgenco.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Replacement/Repairing of bent shock bars.
40
22600
565
Cleaning and clearing of heavily accumulated ash in the Ash hoppers and inspection of air leaks in hoppers
7
16114
2302
Overhauling of EERM gear box.
72
85608
1189
Overhauling of CERM and GDRM gear box.
80
95120
1189
Replacement and repairing of pin wheels, pads, thrust bearings and alignment of EERM drive shaft and pin wheels
50
161850
3237
Welding U clamps for collecting electrodes at the top, bottom and middle
150
7200
48
Welding of leaking joints in the ducts and hoppers
60
7500
125
Hard facing of Emitting electrode frame where the hammer is striking the frame
2
1638
819
Replacement/ alignment of rapping shafts.
20
23400
1170
Leveling of suspended frames inside the ESP.
1
1754
1754
Replacement/ hard facing of eroded/ cracked grip couplers of EERM drive shafts.
2
1444
722
Replacement of EERM drive shaft bearings.
2
600
300
Replacement of worn out/ inspection and missing bolts, nuts,cleaning of collecting electrodes and checking of clearances between the collecting electrodes ad emitting frame
1
38859
38859
Tack welding of inner arms and plain bearings for both EERM and CERM drive shaft system.
15
14040
936
Replacing of Emitting Electrodes of ESP
96
8256
86
Note
-
-
-
The Contractor/Firm has to quote their acceptable % excess/Less on the above mentioned 'Estimate amount' duly inclusive of all the applicable provisions, as per Minimum wages Act and excluding EPF, ESI & GST, for carrying out the subject work during the year 2023-24, as per the scope of work attached to this schedule.
1
-
-
The statutory appliances of EPF, ESI shall be reimbursed subject to production of proof of acquittance and limited to the Rates & Rules applicable from time to time. GST will be paid extra as per the Rates & Rules applicable from time to time.
2
-
-
If any deviation in quoting the tender by the tenderer, will be liable for rejection.
3
-
-
The Successful bidder should submit the filed quality plan duly signing before issuing the LOA. The Field quality plan (FQP) signed by the awarded tenderer and the same should got approved by the Quality Control wing/APGENCO before commencement of the work and shall follow all the quality system procedures as mentioned in FQP in executing the subject work.
4
-
-
CONTRACTOR
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements