Andhra Pradesh Power Generation Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
Machinery and Tools
Opening Date23 Apr 2024
Closing Date3 May 2024
Tender Amount₹ 8,27,055
Costs
EMD
₹ 4,135Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
735964Bid Award Id
ViewTender No
e-06/2024-25 of CE/O&M/Dr.NTTPS(SE/O&M/Stg-IV)Tender Authority
Andhra Pradesh Power Generation Corporation Limited ViewPurchaser Address
-Website
http://apgenco.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Replacing/ Resetting of Cold end radial seals of APH
2
30062
15031
Replacing/ Resetting of Hot end and Cold end By pass seals of APH.
2
16650
8325
Replacing/ Resetting of axial seals
2
26972
13486
Recondition and patch welding of hot end and cold end static seal and center section
2
9818
4909
Recondition of hot end sector plates
2
5164
2582
Recondition of Cold end sector plates
2
5164
2582
Recondition /Replacement of T-bar and by pass angles at hot end
2
11076
5538
Recondition /Replacement of T-bar and by pass angles at cold end
2
11076
5538
Servicing of air preheater soot blower
2
4996
2498
Servicing LOP's cleaning of filters and servicing of Guide bearings
2
16060
8030
Servicing LOP's cleaning of filters and servicing of Support bearings
2
16060
8030
Recondition of cold end support gratings
2
18812
9406
Welding of M.S. Flat pieces on the diaphragm plate at the hot end side modules
2
28476
14238
Repairs of man hole doors.
5
6145
1229
Dismantling and repairing of the air seal assembly, replacement of Ka-wool, gland packing rope and assembly of air seal assembly for APH
2
24232
12116
Servicing of Guide and support bearing lub oil units
2
14730
7365
Dismounting, mounting of main drive motor, fluid coupling and its alignment for APH
2
38718
19359
Repairs / Replacement of Hot end and cold end Rotor post seals (Per APH)
2
22916
11458
Repairing of connecting plate flange, axial seal plates and patch welding to PA sector plate of APH.
2
88648
44234
Erection of temporary platforms for inspection and repair works of cold end gratings, cold end baskets, T bars and T bar holders at cold end side Air preheaters (per one nunber APH)
2
75022
37511
Repairing and Replacement of gusset plates and pipes to the flue gas duct holding frames in the inlet and outlet of each APH
2
98326
49163
Erection & dismantling of scaffolding for taking up repairing works on flue gas duct holding frames in the inlet and outlet of each APH
2
30570
15285
Water washing of SCAPH
2
12238
6119
Replacement of patch welding or for guide vanes of flue gas ducts(both left and right side of boiler) at boiler 6th floor (Economise outlet to APH 7A and 7Binlet)
2
139918
69959
Note:
-
-
-
The Contractor/Firm has to quote their acceptable % excess/Less on the above mentioned 'Estimate amount' duly inclusive of all the applicable provisions, as per Minimum wages Act and excluding EPF, ESI & GST, for carrying out the subject work during the year 2023-24, as per the scope of work attached to this schedule.
1
-
-
The statutory appliances of EPF, ESI shall be reimbursed subject to production of proof of acquittance and limited to the Rates & Rules applicable from time to time. GST will be paid extra as per the Rates & Rules applicable from time to time.
2
-
-
If any deviation in quoting the tender by the tenderer, will be liable for rejection.
3
-
-
The Successful bidder should submit the filed quality plan duly signing before issuing the LOA. The Field quality plan (FQP) signed by the awarded tenderer and the same should got approved by the Quality Control wing/APGENCO before commencement of the work and shall follow all the quality system procedures as mentioned in FQP in executing the subject work.
4
-
-
Note:
-
-
-
The Contractor/Firm has to quote their acceptable % excess/Less on the above mentioned 'Estimate amount' duly inclusive of all the applicable provisions, as per Minimum wages Act and excluding EPF, ESI & GST, for carrying out the subject work during the year 2024-25, as per the scope of work attached to this schedule.
1
-
-
The statutory appliances of EPF, ESI shall be reimbursed subject to production of proof of acquittance and limited to the Rates & Rules applicable from time to time. GST will be paid extra as per the Rates & Rules applicable from time to time.
2
-
-
If any deviation in quoting the tender by the tenderer, will be liable for rejection.
3
-
-
The Successful bidder should submit the filed quality plan duly signing before issuing the LOA. The Field quality plan (FQP) signed by the awarded tenderer and the same should got approved by the Quality Control wing/APGENCO before commencement of the work and shall follow all the quality system procedures as mentioned in FQP in executing the subject work.
4
-
-
CONTRACTOR
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements