Andhra Pradesh Power Generation Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
Electrical Generators And Transformers
Electrical and Electronics
Opening Date8 Apr 2024
Closing Date12 Apr 2024
Tender Amount₹ 5,38,622
Costs
EMD
₹ 2,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
735777Tender No
E-67/23-24 CE/OM/DrNTTPS(SE/OM/CHP)Tender Authority
Andhra Pradesh Power Generation Corporation Limited ViewPurchaser Address
-Website
http://apgenco.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Replacement of 3 ph 415V Induction motors of capacities below 3.7kw with fan motor, gate actuator & alignment
6
19470
3245
Replacement of 3 ph 415V Induction motors/220V DC motors of capacities 3.7kw, above & below 11kw with fan motor & alignment
6
36924
6154
Replacement of 3 ph 415V Induction motors/220V DC motors of capacities 11kw, above & below 30kw with alignment
5
36590
7318
Replacement of 3 ph 415V Induction motors of capacities 30kw, above & below 90kw with alignment
5
58700
11740
Replacement of 3 ph 415V Induction motors of capacities 90kw, above & below 190kw with alignment
4
65744
16436
Replacement of failed unbalanced motor exciter of 4KW, 415V, and 995 rpm VVVFD motor at WT-5&6
4
49424
12356
Replacement of failed thrusters at WT-5&6 including bed modification work
2
6326
3163
Modification of LT motor bed suitable to the erected motor ranging from 3.7KW above &30KW below if necessary including RPG/tripper travel & other motors
2
9816
4908
Modification of LT motor bed suitable to the erected motor ranging from 30KW above & below 90KW if necessary
2
12814
6407
Modification of LT motor bed suitable to the erected motor ranging from 90KW above & below 190KW if necessary
2
18222
9111
Note:1. The firm has to quote their acceptable % excess/less on the above mentioned total amount for carrying out the subject work as & when required during the year 2024-25 as per the scope of work attached to this schedule
-
-
-
2. The statutory appliances EPF , ESI shall be reimbursed subject to production of proof of acquittances and limited to the rates & rules applicable from time to time.GST will be paid extra as per the rates & rules applicable from time to time.
-
-
-
3.If any deviation in quoting the tender by the tenderer will be liable for rejection
-
-
-
4. The standard field quality plan should be enclosed to the tender enquiry by incorporating the clause that ”the contractor should submit the FQP duly signed along with the tender schedule
-
-
-
5. FQP shall be approved by QC wing
-
-
-
6. The contractor should engage sufficient man power for completion of the work within time as instructed by the Engineer In charge without fail or else necessary action will be initiated
-
-
-
sd/-
-
-
-
CE/O&M/Dr.NTTPS
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements