Andhra Pradesh Power Generation Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
Civil And Construction
Water Storage And Supply
Opening Date9 Jan 2024
Closing Date24 Jan 2024
Tender Amount₹ 6,84,183
Costs
EMD
₹ 10,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
708357Tender No
e-63/23-24/SE/CivilTender Authority
Andhra Pradesh Power Generation Corporation Limited ViewPurchaser Address
-Website
http://apgenco.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Labour charges for Placing Polyethylene water storage tanks (Sintex make) double layer confirming to ISI 12701/96 mark with lid on Terrace (at all floor levels) duly providing suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost and conveyance of double gullies with check nuts, PVC washers labour charges for fixing, all leads, lifts, all taxes etc,. complete for finished item of work as directed by the Engineer - in - charge.
17100
21375
1.25
Brick Masonry in CM(1:6) for super structure using cured FLY ASH BRICKS of size 225mmx100mmx60mm and 75Kg/cm2 compressive strength including cost of cement and conveyance of all materials, labour charges, curing and all leads and lifts etc., Complete for finished item of work and as directed by the Engineer in charge. (Cement will be issued by the department at free of cost)
23
162679
7073
Plastering with Cement Mortar(1:5) 12mm thick for the internal face of brick masonry walls and bottom of slab including cost and conveyance of all materials like cement, sand and other materials including all labour charges, scaffolding charges, curing, all leads and lifts etc., Complete for finished item of work and directed by the Engineer in charge. (Cement will be issued by the department at free of cost)
170
49300
290
Roofing with 6mm thick corrugated asbestos cement sheets confirming to IS 459, fixing with G.I J bolts & nuts 8mm dia G.I plain washers etc., including cost & conveyance of all materials, labour charges with all leads & lifts etc., complete for finished item of work as per APSS 815 and as directed by Engineer-in-charge.
14
5558
397
Dismantling and relaying of 1" dia UPVC Pipeline at all elevations for Supply of potable water to Power House and other locations inside the plant, run at all elevations of the buildings, casings at road crossings and wherever necessary the rate includes all labour charges including chiselling the masonry wall,clamping to the wall with clamps and nails, tying with GI wire to Structural memebers wherever necessary, testing the pipe line to the required pressure etc.,hire charges of all Tools & plants, safety equipment etc. and finishing the same as directed by the Engineer -in-charge.
320
43200
135
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements