Andhra Pradesh Industrial Infrastructure Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender

Works
Civil And Construction
Pipe Line Project
Opening Date5 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 1,93,22,650 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Vibrated Reinforced Cement Concrete M-20 Nominal mix using 20mm size graded (SS5) hard grantie machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges and all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work.( For Foundations, Plinth, pedestals (below Plinth)

-

-

-

... More
Foundation/Footings

2

20094

10047

... More
For Plinth Beams

1.1

13676

12432.9

... More
Vibrated Reinforced Cement Concrete M-20 Nominal mix using 20mm size graded (SS5) hard grantie machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges and all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( For Columns, lintels, Water Tanks, RCC Walls))

-

-

-

... More
For Columns

1

12805

12805.2

... More
For Lintels

0.4

5197

12994.9

... More
Vibrated Reinforced Cement Concrete M-20 Nominal mix using 20mm size graded (SS5) hard grantie machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges and all other taxes on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. ( For Slabs & Beams)

-

-

-

... More
For Roof Beams

0.5

5998

11996.1

... More
For Roof Slab

20

29132

1456.6

... More
Brick Masonry in CM (1:6) with Bricks traditional size 23 x 11 x 7 cms (2nd Class) Bricks for super-structure on ground floor including cost of all materials, seigniorage charges, labour and all operations for constructing brick masonry, mixing cement mortar, curing, scaffolding etc., complete for finished item of work as directed by the Engineer-in-Charge.

20

150830

7541.5

... More
Plastering 20mm thick in single coat in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand water etc., to site all materials, and all opertional incidental charges on materials and including cost of all labour charges for mixing mortar, finishing scaffolding, lift charges curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work.

150

42180

281.2

... More
Plastering 12mm thick single coat in CM(1:6) with dubara sponge finishing including cost and conveyance of all materials like cement, sand water etc., to site all materials, and all opertional incidental charges on materials and including cost of all labour charges for mixing mortar, finishing scaffolding, lift charges curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work.

15

2611

174.1

... More
Proving Impervious coat to exposed RCC roof slab of sump, sump side walls, sump bottom slab, inside of the septic tank, in sunken slabs etc.,to required slope with CM (1:3) 20mm thick mixed with water proofing compound manufavtured by reputed manufacturers as approved by engineer in charge at 1 kg of water proofing compound per bag of cement laid over roof when it is green including cost of al materials, conveyanve charges of materials and including all operational and incidental charges for mixing mortar, laying rendering smooth and head lining, curing rounding off junctions of wall and slab complete for finished item of work

25

13622

544.9

... More
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work,

15

6243

416.2

... More
White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

165

7392

44.8

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1.19

102799

86386

... More
Supply and fixing of Single shutter MS window of size 2'0 x 4'0 (609.6 x 1219.2 mm ) Outer frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm including cost and conveyance of all materials and labour charges including fixing of 4 mm pinheaded glass and labour charges, complete for finished item of work.

3

22127

7375.8

... More
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top , 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm)

2.1

10379

4942.65

... More
Water Supply Items

-

-

-

... More
Earthwork excavation with machinery in all types of soils like black cotton soil, red earth, ordinary gravel, hard gravelly soils, mixture of gravel and soft disintigrated rock in the restricted work place icluding all hire and oparational charges of T & P, all labour charges etc., complete for the finished item of work but excluding bailing out waer from pipeline trenches.

6850

859675

125.5

... More
Supply and filling with Crusher stone dust to the pipe line trenches where ever required including watering tamping,ramming including cost and conveyance of all material loading, unloading, transportation, and all other incidental charges etc. complete for finished item of work as directed by the Engineer-in-Charge.

700

491750

702.5

... More
Supply and delivery of (OD) HDPE pipes 6Kg/Cm2 of PE-100 confirming to IS specification 4984/1995 including cost and conveyance of all materials and labour charges etc., complete as per Standard Specifications etc., complete for finished item of work as directed by the Engineer in charge.

-

-

-

... More
110 mm dia HDPE pipe

8500

3302250

388.5

... More
Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 – part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure etc., complete for finished item of work as directed by the Engineer-in-Charge.

-

-

-

... More
110 mm dia HDPE pipe

8500

258400

30.4

... More
Manufacture, Supply, & Delivery of HDPE (PE –100 Grade) fittings conforming to IS 4984 - 1995 including transportation to anywhere in A.P for finished item of work as directed by the Engineer-in-Charge..

-

-

-

... More
(A) HDPE Tee's

-

-

-

... More
i) 110 mm dia

50

27040

540.8

... More
(B) HDPE Bend's

-

-

-

... More
i) 110 mm dia

50

27720

554.4

... More
(C) HDPE End cap's

-

-

-

... More
i) 110 mm dia

30

4806

160.2

... More
(D) HDPE reducer

-

-

-

... More
i) 110 mm dia

100

21580

215.8

... More
Providing cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer-in-Charge-For Road Cutting Portion

50

317035

6340.7

... More
Supply & Delivery of Tamper Proof DI Flanged Single Chamber Air Release Valves with body & cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005. All internal parts such as Float, shell, Cove Bolts etc. made of Austenitic alloy steel of SS AISI 304/316 and DN 50 float of and other components with ABS/PTFE/EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination Flange drilling as per IS - 1538 and including cost and conveyance of all materials etc., complete for for finished it em of work as directed by the Engineer-in-Charge.

-

-

-

... More
50mm dia air valve on 180mm and 200mm dia HDPE- pipe

50

821460

16429.2

... More
Manufacture, Supply and delivery of DI D/F Butterfly Valves, Body and disc of Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 Double eccentrically designed Disc., with renewable soft seal on the disc and Integral Body seat face of nickel-chromium overlay welding (Fusion Bonded) micro finished, 100 % leak tight in both directions, Medium free bearings and with minimum thickness of 250 microns Fusion bonded food grade epoxy coating and 1200mm dia. and above food grade liquid Epoxy coating of minimum 150 microns applied on both body and disc inside and outside. Face to face dimensions as per EN558-1/IS 13095 body or IS: 13095 long body design standard as per EN 593/IS 5163 Flange drilling as per EN 1092-2/ IS 1538 the Valve should be suitable for buried application. etc., complete for finished item of work as directed by the Engineer-in-Charge.

-

-

-

... More
110mm dia valve

50

1503160

30063.2

... More
Manufacture, supply and erection of air valve guard cabins made with 4 Nos. of verticals and 8 Nos. horizental MS angles of size 50x50x6mm and 12mm square bas fixed at 5 cm c/c with door and locking arrangement with 65 x 65 x 6mm MS angles 2 Nos. For support of top plate and with 4 Nos. of 30x30x3mm MS angles for laterial direction supports including 6mm thick MS plate for covering the top of the cage including cost of locking arrangements for the door along with the cost of bolts, hinges, handles etc., complete and painting both sides with corrosive paint two coats over one coat of primary coat including cost of all materials fabrication, welding, transportation to site, fixing in position duly emberding in CC (1:2:4) prop. and all other incidental and operational charges etc., complete for finished item of work.

300

988830

3296.1

... More
Construction of R.C.C Valve Chamber for 110mm diameters including earth work excavation, PCC (1:4:8), M20 Grade concete, HYSD Steel , Manhole Covers and frames etc., including cost & conveyance of all materials , labour charges , formwork, machine mixing, vibration, curing incidental and operational charges etc., complete as directed by the Engineer-in- Charge for finished item of work.

-

-

-

... More
110 mm dia dia valve chamber

50

1990900

39818

... More
Manufacture, Supply and Delivery of Cast Iron Pipes and Fittings (spls.) Conforming to IS. No. 7181/1986, and C.I.D Joints confirming to IS:1538/1998 at site of work anywhere in A.P. Including, loading, unloading, transportation to site of work stacking at site transit risk and package, etc., complete for the finished item of work.

-

-

-

... More
50mm dia D/F pipe 0.6m long

60

64248

1070.8

... More
Refilling with useful excavated earth in pipeline trenches (excluding rock), consolidated each deposited layer not exceeding 15cm thick by watering and ramming including all, cost and conveyance of water to work site and all operational,incidental, labour charges, hire charges of T&P etc., complete for finished item of work as directed by the Engineer-in-Charge.

6850

239065

34.9

... More
GLSR

-

-

-

... More
Clearing Heavy jungle growth including bushes upto 30cms/ Parthenium and other weeds including disposing of the same as directed by the Engineer-in-charge.

650

2340

3.6

... More
Earth work excavation Ordinary soils-Mechcanical Means for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) BLD_CSTN_2-2

230

28865

125.5

... More
Crusher stone dust filling in foundation including cost and conveyence of all materials to site and watering, tamping etc., complete for finshed item of work as per APSSNo 309 & 310 and as directed by the Engineer - in - Charge.

30

21072

702.4

... More
Plain Cement Concrete in (1:4:8) proportion (cement;fine aggregate: Coarse aggregate) for foundations using 40mm size(SS5) hard granite metal from approved quarry including cos and conveyance of all materials like cement,sand,coarse aggregate, water etc., to site including all labour charges for machine mixing, laying concrete, ramming, finishing top surface to the required level, curing etc., complete for finished item of work as directed by the Engineer in charge

20

102012

5100.6

... More
Supply and placing of the M30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 6 to 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.

-

-

-

... More
Footing/Raft

34.02

391056

11494.9

... More
Side Walls 200mm Thk

100

331970

3319.7

... More
Alround Ring Beam

1.5

19491

12994.4

... More
200 mm Thick Top Slab

86

190352

2213.4

... More
Proving Impervious coat to exposed RCC roof slab of sump, sump side walls, sump bottom slab, inside of the septic tank, in sunken slabs etc.,to required slope with CM (1:3) 20mm thick mixed with water proofing compound manufavtured by reputed manufacturers as approved by engineer in charge at 1 kg of water proofing compound per bag of cement laid over roof when it is green including cost of al materials, conveyanve charges of materials and including all operational and incidental charges for mixing mortar, laying rendering smooth and head lining, curing rounding off junctions of wall and slab complete for finished item of work .

190

103531

544.9

... More
Plastering 12mm thick 2 coats 8mm thick in CM (1:5) and top coat 4mm thick in CM (1:3) including cost and conveyance of all materials and labour complete etc. for finished item of work.

100

48530

485.3

... More
White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

100

4480

44.8

... More
Providing High Yield Strenth Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of all materials and labour complete etc.

32

2764352

86386

... More
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including,loading, unloading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable. I.S.I Mark

1

1772

1772.3

... More
Supply and fixing of MS railing using Mild steel tubes, sections plates sheets pipes of all sizes and dia meters including fabrication as per approved design using stainless steel welding rods, buffing polishing lacquer finishing to present seam less finish and all other insanity, Operational charges for finished item of work as directed by Engineer- In - Charge

3011.6

421021

139.8

... More
ELSR

-

-

-

... More
Construction of 1 Lakh Ltr Capacity OHSR in a soil having SBC of 15 T/Sqm, with 25 Mts staging including three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including roof, 2 coats of whether proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections with the following Fixtures a) RCC or Aluminum ladder inside 0.60 m wide. b) Spiral staircase on the outside c) Lightening arrestor, including conductor and earthling etc. d) RCC ventilators with copper or stainless steel fly proof mesh. e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2 Nos. f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1 No. g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single column OHSRs only. h) The railing provided to the gallery and stair case shall be with stainless steel of grade 304 for a height of 1.20mts. i). D.I swan neck ventilators shall be provided in top dome and slab.

100000

3489000

34.89

... More
No. of BOQ items: 38(Thirty Eight) only

-

19322649

-

... More
(Rupees One crore Ninety Three lakhs Twenty Two thousand Six hundred and Fifty Only)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.