Andhra Pradesh Industrial Infrastructure Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender

Works
Civil And Construction
Opening Date29 Aug 2024
Closing Date13 Sep 2024
Tender Amount₹ 12,84,398 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sand filling in foundation including cost and conveyance of all materials to site and watering, tamping, etc., complete for finished item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer - in - charge.

13

12968

997.61

... More
Laying Plain Cement Concrete (1:4:8) mix using 40mm size HBG machine crushed stone aggregate and fine aggregate and confirming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing, etc, including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, & 2100 (5th Revision) and as directed by the Engineer-In-Charge for Foundations.

13

65266

5020.49

... More
Vibrated Reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution for finished item including all taxes except GST and seigniorage charges as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision ) and as directed by the Engineer-in-Charge for footings & Raft foundations

-

-

-

26

172672

6641.24

... More
For Body walls

40

280143

7003.59

... More
For culvert Slab

18

136935

7607.5

... More
Providing HYSD bars (Fe-500) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and icluding over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for foundations of RCC items

6

479715

79952.55

... More
No of BOQ items: 07 (Seven ) only

-

1284398

-

... More
The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit for Civil items. The overhead charges includes Labour Amenitites and Labour Importation / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made. The rates given in Schedule 'A' are exclusive of GST & Seigniorage charges.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.