Andhra Pradesh Industrial Infrastructure Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender

Works
Civil And Construction
Road Construction
Opening Date7 Feb 2024
Closing Date15 Feb 2024
Tender Amount₹ 29,36,753 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work including all taxes except GST and seigniorage charges as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1550

17019

10.98

... More
Providing and laying of 50mm thick Bituminous Macadam with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-7 of MoRT&H specification 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work including all taxes except GST and seigniorage charges as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary , complete and as per MoRT&H specification No. 504 (5th Revision) .

100

822831

8228.31

... More
Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work including all taxes except GST and seigniorage charges as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1550

17019

10.98

... More
Providing and laying of 30 mm thick Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading – II as per Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

50

525537

10510.74

... More
Construction of gravel for shoulders with side slopes 2:1 in layers including sectioning each layer to proper camber, watering compaction with vibratory roller 8 to 10 tonnes capacity including the cost and conveyance of gravel to site, cost of watering etc, labour charges for operations, hire and operational charges of power roller and other T & P, diversion of traffic, etc. complete for finished item of work. as directed by Engineer - In - Charge. MORTH Spfn No:305.

140

101178

722.7

... More
No. of BOQ items: 8(Eight) only

-

2936753

-

... More
(Rupees :- Twenty Nine Lakhs Thirty Six Thousand Seven Hundred Fifty Three Only)

-

-

-

... More
The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit for items. The overhead charges includes Labour Amenitites and Labour Importation / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made. The rates given in Schedule 'A' are exclusive of GST and Seigniorage charges.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.