Andhra Pradesh Industrial Infrastructure Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender
Civil And Construction
Bridge Construction
Opening Date22 Feb 2024
Closing Date7 Mar 2024
Tender Amount₹ 4,06,693
Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
725266Tender No
13/ZM/GNT/APIIC/SlabCulvert/2023-24, Dated:16.02.2024Tender Authority
Andhra Pradesh Industrial Infrastructure Corporation ViewPurchaser Address
-Website
http://https://www.apiic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying Plain Cement Concrete (1:4:8) mix using 40mm size HBG machine crushed stone aggregate and fine aggregate and confirming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing, etc, including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700,2100 (5th Revision) and as directed by the Engineer-In-Charge for Foundations.
4
17816
4454.17
Vibrated cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision ) and as directed by the Engineer-in-Charge
-
-
-
Raft Concrete
4
24538
6134.69
Body & Parapet Walls
10
67415
6741.56
Slab Culvert 300MM Thick
7
51481
7354.43
Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2300 (5th revision) and as per I.S.1786 of 1985 for R.C.C items.
3
236317
78772.46
No of BOQ items: 5 (Five ) only
-
406693
-
(Rupees Four Lakhs Six Thousand Six Hundred Ninty Three Only)
-
-
-
The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit for Civil items. The overhead charges includes Labour Amenitites and Labour Importation / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made. The rates given in Schedule 'A' are exclusive of GST & Seigniorage charges
-
-
-