Andhra Pradesh Education And Welfare Infrastructure Development Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Education And Welfare Infrastructure Development Corporation - APEWIDC Tender
Civil And Construction
Building Construction
Opening Date30 Jun 2023
Closing Date14 Jul 2023
Tender Amount₹ 1,21,417
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
639131Bid Award Id
ViewTender No
NIT No. 07/AE/2022-23(4th Call)Tender Authority
Andhra Pradesh Education And Welfare Infrastructure Development Corporation ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
4.55
1787
392.85
... More
Plastering 12 mm thick in two coats with base coat of 8 mm thick in CM (1:6) and top coat of 4 mm thick in CM (1:4) dubara spong finishing including cost and conveyence of all materials like cement, sand, water to site, including seigniorage charges, sales and other taxes on all materials, and all operational, incidential charges on materials and including cost of all labour charges for mixing mortar curing grooves where ever neccesary as directed by Engineer-in-charge etc., for even surface of bricks masonry and RCC exposed faces complete for item of work (APSS No. 903 & 904).
16.5
6248
378.65
... More
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4 mm thick in CM (1:4) dubara spong finishing including cost and conveyence of all materials like cement, sand, water to site, including seigniorage charges, sales and other taxes on all materials, and all operational, incidential charges on materials and including cost of all labour charges for mixing mortar curing grooves where ever neccesary as directed by Engineer-in-charge etc., for even surface of bricks masonry and RCC exposed faces complete for item of work (APSS No. 903 & 904).
24.05
9550
397.1
... More
Supply and Fixing of 6Kg Map 50 Fire exhausting applicable on A,B & C class of Fire filling with MAP50 mono Amonium Phosphate and pressuring agent with Dry Nitrogen of Fire rating 2A 55B etc,. Complete..
4
16000
4000
... More
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
33.12
14192
428.5
... More
Painting to New walls with two coats of acrylic interior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ liter.of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL
119.75
17549
146.55
... More
Painting to New walls with two coats of acrylic Exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ liter.of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors External Walls
61.38
12310
200.55
... More
Painting to wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
10.72
1843
171.95
... More
Providing Antitermite treatment as per IS 6315 (Part - 2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/ sqm of the vertical surface & @ 5.0 Liters/ sqm of the horizontal surface of the substructure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge
39.07
12471
319.2
... More
Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 4 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors
6.6
3896
590.35
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements