Andhra Pradesh Education And Welfare Infrastructure Development Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Education And Welfare Infrastructure Development Corporation - APEWIDC Tender
Civil And Construction
Civil Works Others
Opening Date29 Sep 2023
Closing Date4 Oct 2023
Tender Amount₹ 13,98,314
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 11,800
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
666867Bid Award Id
ViewTender No
107/2023-24, Dt:23.09.2023Tender Authority
Andhra Pradesh Education And Welfare Infrastructure Development Corporation ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismantaling and clearing way, carfully stracking materials useful for reuse of Brick Masonry in Cement Motor including all labour charges for all oprations etc., complete for finished item of work
2.97
1557
524.16
... More
Providing Mild steel bars (Fe 250 grade as per IS 432) of different diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.
0.3
23287
77622.3
... More
Providing Wearing Coat over RCC Roof slab to required slopes with CC (1:1.5:3) prop. 40mm thick, using 6 to 12 mm HBG metal and plastering with CM (1:3) prop 8mm thick (average) mixed with water proofing compound manufactured by reputed manufactures as approved by Engineer-in-cherge at 1 Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lineing at regular intervals of 45 x 45 cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc.., to site seigniorage charges, sales & other taxes on all materials, all operations, incidental and labour charges such as charges such as mixing motor, laying, rounding off at junctions of wall slab, rounding smooth thread lining, curing, lift charges, etc., complete for finished item of work.
610
349066
572.24
... More
Supply and fixing of 110mm PVC / SWR pipe 4kgs/cm2 including cost and conveyance of all materials and all labour charges etc., complete work for finished item of wrok
45
10971
243.8
... More
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for finished item of work (APSS 901,903 & 904)
140
68481
489.15
... More
Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG (SS5) graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402)
6
32853
5475.57
... More
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a required quantity of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering, machine mixing, laying concrete, lift charges, curing etc., complete for finished item of work for Dummy Columns (APSS No. 402 & 403)
5
35747
7149.4
... More
Providing supply and application of chemical treatment flexible acrylic polymer cementicias water proofing sealant treatment to Roof Slab, after thoroughly scraping and brushing the surface to remove all loose powdered materials of the Roof Slab, before primary coat you have applied filling cracks with required chemicals as directed by the Department, after that applied primary coat of brush bond acrylic latex water proofing adhesive cum bonding agent of hydroment 476 create HS / Bosco create chemical or equivalent with 1:4 ratio i.e.., 1 lit. Hydroment 476 create HS / Bosco create chemical and 4 Lt. Water in pigment to apply brush bond to Roof Slab after completion of the primary coat and dry the surface to apply the second coat of brush bond of flexible acrylic polymer cementicias (Bostik or other equivalent) of two components i.e.., powder and chemical liquid in pigment to apply the surface of the roof slab. After two hours later to apply the brush bond of acrylic latex chemical with cement in ratio 1:2 i.e.., 1 lit. acrylic latex in 2 Kgs of cement with pigment to apply the brush bond to roof slab including cost and conveyance of all materials and hire charges of scraping, brushing, cutting, browing machine and all labour charges for scraping, brushing, browing, applying charges etc.., complete as directed by the Department for finished item of work.
615
407880
663.22
... More
Supply & fixing pre-painted galvalium trepizoidal profile roofing sheets with 0.47mm thickness, coating Alu-zinc coating AZ 150 GSM. Tensile strength 550 MPA, paint coating: Regulat modified polyster painting. THickness (top) 18-20 microns, (Bottom) 5-7 microns including C/C of all materials like sheets, J bolts, bitumen washers etc.., with or without ridge with sales & all other taxes & all labour charges etc.., complete for fixing sheets in position
250
125403
501.61
... More
supply and Fixing 50 mm dia MS Purlins medium grade including Labour Charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes all labour charges etc., complete for finished item of work
108
59266
548.76
... More
supply and Fixing 100 mm dia MS Purlins / Rafter including Labour Charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes all labour charges etc., complete for finished item of work
140
182274
1301.96
... More
supply and Fixing of 32x32x2.60mm thick MS Square Purlins including Labour Charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes all labour charges etc., complete for finished item of work
290
70522
243.18
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements