Andhra Pradesh Education And Welfare Infrastructure Development Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Education And Welfare Infrastructure Development Corporation - APEWIDC Tender

Opening Date12 Nov 2020
Closing Date26 Nov 2020
Tender Amount₹ 87,64,570 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ACRS at Kadiri;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including c/c like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

32

-

110821

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) COLUMN FOOTINGS:

10.38

-

97185

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Pedastals

3.89

-

38576

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Columns

9.6

-

117156

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Plinth beams

8.4

-

99357

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof beams

10.1

-

111613

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof slab 125mm thick

149.3

-

199644

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Waist Slab of 175mm thick

18

-

29863

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) LINTELS: (RCC)

0.8

-

9503

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Sun Shades of 0.6 mtrs of avearage thick of 0.0625 mtrs

19

-

20007

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Platforms 50mm thick

4.5

-

4063

... More
ACRS at Kadiri;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

76

-

2271

... More
ACRS at Kadiri;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

140

-

60991

... More
ACRS at Kadiri;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

36

-

224881

... More
ACRS at Kadiri;Plain Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete for finished item of work for steps (APSS No. 402 )

0.74

-

5428

... More
ACRS at Kadiri;Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS Flats 25x4mm-3Nos for Horizontal to the Dor MS aldrop 250mm long-1No MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-4Nos with primary coat of Red oxide paint including cost,conveyance of all materials to site ,sales and other taxes on all materials and labour charges etc complete

2

-

15154

... More
ACRS at Kadiri;Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x 1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm one number horizontally in centre of the window and 2 Nos. verticles also bended with fixtures such as M.S. Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., M.S. Powder coated wind appliance 6 Nos., and safety rods 10mm square roads at 100mm centre to centre welded horizontally to full width of window including redoxide primer grade I quality coating including cost and conveynace of all materials, labour charges etc., complete for finished item of work.

6

-

50754

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1518

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1245

... More
ACRS at Kadiri;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

180

-

77688

... More
ACRS at Kadiri;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

275

-

113795

... More
ACRS at Kadiri;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

235

-

101708

... More
ACRS at Kadiri;Supplying and Fixing of 0.30 Ceramic Magntic Green Chalk board of size 10'x 4' with virtual enamelcoated sheet made up of 0.30to 0.40m thick stell steet havibg 0.095mm thick on top and 0.03mm thick on back surface wuth 9mm thick MDF board having bulk density of 750kgs/cum and laminaed with 0.25mm thick electo Galvanised sheet of the back both the top and backing sheet shall be properly fixed with MDF board using suitable chnnelsetc Complete.

2

-

21800

... More
ACRS at Kadiri;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors.

43

-

4532

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL

460

-

74635

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors EXTERNAL

270

-

45009

... More
ACRS at Kadiri;Flooring with Polished Kadapa Slabas 15mm thick (0.457m x 0.457 M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701)

140

-

83419

... More
ACRS at Kadiri;Providing skirting to internal walls 10.0 Cm high withPolished Kadapa Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)

14

-

9094

... More
ACRS at Kadiri;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade ) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including c/c of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

5.7

-

353672

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Columns

6.2

-

79706

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof beams

10.1

-

14061

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof slab 125mm thick

149.3

-

207855

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Waist Slab of 175mm thick

18

-

31023

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) LINTELS: (RCC)

0.8

-

9954

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Sun Shades of 0.6 mtrs of avearage thick of 0.0625 mtrs

19

-

20924

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Platforms 50mm thick

4.5

-

4259

... More
ACRS at Kadiri;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

34.1

-

225549

... More
ACRS at Kadiri;Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS Flats 25x4mm-3Nos for Horizontal to the Dor MS aldrop 250mm long-1No MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-4Nos with primary coat of Red oxide paint including cost,conveyance of all materials to site ,sales and other taxes on all materials and labour charges etc complete

2

-

15154

... More
ACRS at Kadiri;Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x 1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm one number horizontally in centre of the window and 2 Nos. verticles also bended with fixtures such as M.S. Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., M.S. Powder coated wind appliance 6 Nos., and safety rods 10mm square roads at 100mm centre to centre welded horizontally to full width of window including redoxide primer grade I quality coating including cost and conveynace of all materials, labour charges etc., complete for finished item of work.

6

-

50754

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1518

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1245

... More
ACRS at Kadiri;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

175

-

83391

... More
ACRS at Kadiri;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

275

-

124933

... More
ACRS at Kadiri;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

180.1

-

85241

... More
ACRS at Kadiri;Supplying and Fixing of 0.30 Ceramic Magntic Green Chalk board of size 10'x 4' with virtual enamelcoated sheet made up of 0.30to 0.40m thick stell steet havibg 0.095mm thick on top and 0.03mm thick on back surface wuth 9mm thick MDF board having bulk density of 750kgs/cum and laminaed with 0.25mm thick electo Galvanised sheet of the back both the top and backing sheet shall be properly fixed with MDF board using suitable chnnelsetc Complete.

2

-

21800

... More
ACRS at Kadiri;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors.

43

-

4532

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL

446.3

-

72412

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors EXTERNAL

236

-

39341

... More
ACRS at Kadiri;Flooring with Polished Kadapa Slabas 15mm thick (0.457m x 0.457 M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701)

138.8

-

87277

... More
ACRS at Kadiri;Providing skirting to internal walls 10.0 Cm high withPolished Kadapa Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)

14

-

9639

... More
ACRS at Kadiri;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including c/c of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

3

-

189759

... More
ACRS at Kadiri;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

150

-

73178

... More
ACRS at Kadiri;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors

2.8

-

1866

... More
ACRS at Kadiri;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

120

-

9600

... More
ACRS at Kadiri;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI MARK) surface mounted with all required accessories fixing of chromium plated metallic base saddles including all labour charges etc., complete [ for run of mains,power plugs ,computer boards and AC circuits] Makes : Sudhakar / Modi ( ISI mark).

60

-

5340

... More
ACRS at Kadiri;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

48

-

26880

... More
ACRS at Kadiri;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

8

-

3424

... More
ACRS at Kadiri;Supply and run of 1 of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

2109

... More
ACRS at Kadiri;Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

6965

... More
ACRS at Kadiri;Supply, Transportaton, and fixing of 4-36/40W box type tube light fitting with 28Watt electronic ballast with all accessories with 40Watt tube and operating voltage 90 to 350 Volts, power factor 0.98 and harmonics shall be as per IS specifications including all labour charges and conveyance of all materials etc complete with with flexible wire and connections. Makes: Makes: Wipro / G.E. / Phillips / Crompton / Bajaj/Havells/HPL/Halonix

8

-

6904

... More
ACRS at Kadiri;Supply of Supply of 48" (1200mm) Sweep 5 star rated Ceiling Fan , with double ball bearings, air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton HS Plus / Havells ES Neo/Orient Energy Star/ Halonix(Zephyr)/Polycab(Synergy Star)

8

-

18360

... More
ACRS at Kadiri;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

16

-

2784

... More
ACRS at Kadiri;Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

16

-

6544

... More
ACRS at Kadiri;Supply and fixing of concealed box PVC/MS with hook for fan

16

-

640

... More
ACRS at Kadiri;Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

40

-

2141

... More
ACRS at Kadiri;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3622

... More
ACRS at Kadiri;Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., c

1

-

4607

... More
ACRS at Kadiri;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation). BH Make: Anchor / Gold Medal Olive / Million Zoom.

16

-

2672

... More
ACRS at Kadiri;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

95

-

19803

... More
ACRS at Kadiri;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (C:FA:CA) using 40mm size HBG (IS383, 1970) metal from approved quarry including c/c like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

5.4

-

21458

... More
ACRS at Kadiri;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (C:FA:CA) using 40mm size HBG (IS383, 1970) metal from approved quarry including c/c like cement, sand, coarse aggregate, water etc. to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

17

-

64626

... More
ACRS at Kadiri;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including c/c like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

32

-

110821

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) COLUMN FOOTINGS:

10.38

-

97185

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Pedastals

3.89

-

38576

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Columns

9.6

-

117156

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Plinth beams

8.4

-

99357

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof beams

10.1

-

111613

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof slab 125mm thick

149.3

-

199644

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Waist Slab of 175mm thick

18

-

29863

... More
ACRS at Kadiri;Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) LINTELS: (RCC)

0.8

-

9503

... More
ACRS at Kadiri;Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Sun Shades of 0.6 mtrs of avearage thick of 0.0625 mtrs

19

-

20007

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Platforms 50mm thick

4.5

-

4063

... More
ACRS at Kadiri;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

76

-

2271

... More
ACRS at Kadiri;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

140

-

60991

... More
ACRS at Kadiri;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

36

-

224881

... More
ACRS at Kadiri;Plain Cement Concrete M25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete for finished item of work for steps (APSS No. 402 )

0.74

-

5428

... More
ACRS at Kadiri;Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS Flats 25x4mm-3Nos for Horizontal to the Dor MS aldrop 250mm long-1No MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-4Nos with primary coat of Red oxide paint including cost,conveyance of all materials to site ,sales and other taxes on all materials and labour charges etc complete

2

-

15154

... More
ACRS at Kadiri;Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x 1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm one number horizontally in centre of the window and 2 Nos. verticles also bended with fixtures such as M.S. Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., M.S. Powder coated wind appliance 6 Nos., and safety rods 10mm square roads at 100mm centre to centre welded horizontally to full width of window including redoxide primer grade I quality coating including cost and conveynace of all materials, labour charges etc., complete for finished item of work.

6

-

50754

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1518

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1245

... More
ACRS at Kadiri;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

180

-

77688

... More
ACRS at Kadiri;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

275

-

113795

... More
ACRS at Kadiri;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

235

-

101708

... More
ACRS at Kadiri;Supplying and Fixing of 0.30 Ceramic Magntic Green Chalk board of size 10'x 4' with virtual enamelcoated sheet made up of 0.30to 0.40m thick stell steet havibg 0.095mm thick on top and 0.03mm thick on back surface wuth 9mm thick MDF board having bulk density of 750kgs/cum and laminaed with 0.25mm thick electo Galvanised sheet of the back both the top and backing sheet shall be properly fixed with MDF board using suitable chnnelsetc Complete.

2

-

21800

... More
ACRS at Kadiri;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors.

43

-

4532

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL

460

-

74635

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors EXTERNAL

270

-

45009

... More
ACRS at Kadiri;Flooring with Polished Kadapa Slabas 15mm thick (0.457m x 0.457 M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701)

140

-

83419

... More
ACRS at Kadiri;Providing skirting to internal walls 10.0 Cm high withPolished Kadapa Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)

14

-

9094

... More
ACRS at Kadiri;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade ) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including c/c of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

5.7

-

353672

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Columns

6.2

-

79706

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof beams

10.1

-

14061

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof slab 125mm thick

149.3

-

207855

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Waist Slab of 175mm thick

18

-

31023

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) LINTELS: (RCC)

0.8

-

9954

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Sun Shades of 0.6 mtrs of avearage thick of 0.0625 mtrs

19

-

20924

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Platforms 50mm thick

4.5

-

4259

... More
ACRS at Kadiri;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

34.1

-

225549

... More
ACRS at Kadiri;Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS Flats 25x4mm-3Nos for Horizontal to the Dor MS aldrop 250mm long-1No MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-4Nos with primary coat of Red oxide paint including cost,conveyance of all materials to site ,sales and other taxes on all materials and labour charges etc complete

2

-

15154

... More
ACRS at Kadiri;Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x 1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm one number horizontally in centre of the window and 2 Nos. verticles also bended with fixtures such as M.S. Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., M.S. Powder coated wind appliance 6 Nos., and safety rods 10mm square roads at 100mm centre to centre welded horizontally to full width of window including redoxide primer grade I quality coating including cost and conveynace of all materials, labour charges etc., complete for finished item of work.

6

-

50754

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1518

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

2

-

1245

... More
ACRS at Kadiri;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

175

-

83391

... More
ACRS at Kadiri;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

275

-

124933

... More
ACRS at Kadiri;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

180.1

-

85241

... More
ACRS at Kadiri;Supplying and Fixing of 0.30 Ceramic Magntic Green Chalk board of size 10'x 4' with virtual enamelcoated sheet made up of 0.30to 0.40m thick stell steet havibg 0.095mm thick on top and 0.03mm thick on back surface wuth 9mm thick MDF board having bulk density of 750kgs/cum and laminaed with 0.25mm thick electo Galvanised sheet of the back both the top and backing sheet shall be properly fixed with MDF board using suitable chnnelsetc Complete.

2

-

21800

... More
ACRS at Kadiri;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors.

43

-

4532

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL

446.3

-

72412

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors EXTERNAL

236

-

39341

... More
ACRS at Kadiri;Flooring with Polished Kadapa Slabas 15mm thick (0.457m x 0.457 M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701)

138.8

-

87277

... More
ACRS at Kadiri;Providing skirting to internal walls 10.0 Cm high withPolished Kadapa Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)

14

-

9639

... More
ACRS at Kadiri;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade ) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including c/c of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

2.8

-

177109

... More
ACRS at Kadiri;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

150

-

73178

... More
ACRS at Kadiri;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors

3

-

1999

... More
ACRS at Kadiri;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

120

-

9600

... More
ACRS at Kadiri;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI MARK) surface mounted with all required accessories fixing of chromium plated metallic base saddles including all labour charges etc., complete [ for run of mains,power plugs ,computer boards and AC circuits] Makes : Sudhakar / Modi ( ISI mark).

60

-

5340

... More
ACRS at Kadiri;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

48

-

26880

... More
ACRS at Kadiri;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

8

-

3424

... More
ACRS at Kadiri;Supply and run of 1 of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

2109

... More
ACRS at Kadiri;Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

100

-

6965

... More
ACRS at Kadiri;Supply, Transportaton, and fixing of 4-36/40W box type tube light fitting with 28Watt electronic ballast with all accessories with 40Watt tube and operating voltage 90 to 350 Volts, power factor 0.98 and harmonics shall be as per IS specifications including all labour charges and conveyance of all materials etc complete with with flexible wire and connections. Makes: Makes: Wipro / G.E. / Phillips / Crompton / Bajaj/Havells/HPL/Halonix

8

-

6904

... More
ACRS at Kadiri;Supply of Supply of 48" (1200mm) Sweep 5 star rated Ceiling Fan, with double ball bearings, air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton HS Plus / Havells ES Neo/Orient Energy Star/ Halonix(Zephyr)/Polycab(Synergy Star)

8

-

18360

... More
ACRS at Kadiri;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

16

-

2784

... More
ACRS at Kadiri;Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

16

-

6544

... More
ACRS at Kadiri;Supply and fixing of concealed box PVC/MS with hook for fan

16

-

640

... More
ACRS at Kadiri;Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

40

-

2141

... More
ACRS at Kadiri;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3622

... More
ACRS at Kadiri;Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., c

1

-

4607

... More
ACRS at Kadiri;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation). BH Make: Anchor / Gold Medal Olive / Million Zoom.

16

-

2672

... More
ACRS at Kadiri;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

47

-

9797

... More
ACRS at Kadiri;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (C:FA:CA) using 40mm size HBG (IS383, 1970) metal from approved quarry including c/c like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

2.4

-

9537

... More
ACRS at Kadiri;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (C:FA:CA) using 40mm size HBG (IS383, 1970) metal from approved quarry including c/c like cement, sand, coarse aggregate, water etc. to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

8

-

30412

... More
ACRS at Kadiri;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including c/c like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

28

-

96968

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) COLUMN FOOTINGS:

4

-

37451

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Pedastals

1.94

-

19238

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Columns

5

-

61019

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Plinth beams

3.7

-

43764

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof beams

4.3

-

47518

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Roof slab 125mm thick

67

-

89592

... More
ACRS at Kadiri;Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) LINTELS: (RCC)

0.5

-

5940

... More
ACRS at Kadiri;Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Sun Shades of 0.6 mtrs of avearage thick of 0.0625 mtrs

11

-

11583

... More
ACRS at Kadiri;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) Platforms 50mm thick

2.2

-

1986

... More
ACRS at Kadiri;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

38

-

1136

... More
ACRS at Kadiri;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

60

-

26139

... More
ACRS at Kadiri;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

20

-

124934

... More
ACRS at Kadiri;Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS Flats 25x4mm-3Nos for Horizontal to the Dor MS aldrop 250mm long-1No MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-4Nos with primary coat of Red oxide paint including cost,conveyance of all materials to site ,sales and other taxes on all materials and labour charges etc complete

1

-

7577

... More
ACRS at Kadiri;Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1.52 M x 1.22 M (Six Leafs shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm one number horizontally in centre of the window and 2 Nos. verticles also bended with fixtures such as M.S. Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., M.S. Powder coated wind appliance 6 Nos., and safety rods 10mm square roads at 100mm centre to centre welded horizontally to full width of window including redoxide primer grade I quality coating including cost and conveynace of all materials, labour charges etc., complete for finished item of work.

3

-

25377

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.52 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

1

-

759

... More
ACRS at Kadiri;Supply and Fixing of Ventilator of size 1.22 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of work

1

-

622

... More
ACRS at Kadiri;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

80

-

34528

... More
ACRS at Kadiri;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

160

-

66208

... More
ACRS at Kadiri;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

110

-

47608

... More
ACRS at Kadiri;Supplying and Fixing of 0.30 Ceramic Magntic Green Chalk board of size 10'x 4' with virtual enamelcoated sheet made up of 0.30to 0.40m thick stell steet havibg 0.095mm thick on top and 0.03mm thick on back surface wuth 9mm thick MDF board having bulk density of 750kgs/cum and laminaed with 0.25mm thick electo Galvanised sheet of the back both the top and backing sheet shall be properly fixed with MDF board using suitable chnnelsetc Complete.

1

-

10900

... More
ACRS at Kadiri;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors.

22

-

2319

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL

205

-

33261

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors EXTERNAL

150

-

25005

... More
ACRS at Kadiri;Flooring with Polished Kadapa Slabas 15mm thick (0.457m x 0.457 M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701)

80

-

47668

... More
ACRS at Kadiri;Providing skirting to internal walls 10.0 Cm high withPolished Kadapa Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)

5

-

3248

... More
ACRS at Kadiri;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

67

-

30318

... More
ACRS at Kadiri;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including c/c of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

2.7

-

167529

... More
ACRS at Kadiri;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete for finished item of work for Dummy Columns. (APSS No. 402)

0.9

-

6402

... More
ACRS at Kadiri;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

2.06

-

13626

... More
ACRS at Kadiri;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

25

-

11358

... More
ACRS at Kadiri;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

10

-

4733

... More
ACRS at Kadiri;Painting to New walls with two coats of acrylic emulsion paint weather proof waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in All Floors EXTERNAL

35

-

5835

... More
ACRS at Kadiri;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade ) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including c/c of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

0.1

-

6325

... More
ACRS at Kadiri;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

150

-

73178

... More
ACRS at Kadiri;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors

1.5

-

999

... More
ACRS at Kadiri;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories including masonary work for light, fan , common and separate plug point including all labour charges etc., complete. Makes : Sudhakar / Modi ( ISI mark).

40

-

3200

... More
ACRS at Kadiri;Supply and Fixing of 25mm outer dia heavy (2.20mm thickness) grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI MARK) surface mounted with all required accessories fixing of chromium plated metallic base saddles including all labour charges etc., complete [ for run of mains,power plugs ,computer boards and AC circuits] Makes : Sudhakar / Modi ( ISI mark).

20

-

1780

... More
ACRS at Kadiri;Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with 6 Module Hot Dip Galvanized modular type Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make:Polycab /RPG / Million / Power Flex / Anchor / V-Guard. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge. Ceiling Rose Make:Anchor / Gold Medal Olive / Million Zoom.

13

-

7280

... More
ACRS at Kadiri;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make:GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

2

-

856

... More
ACRS at Kadiri;Supply and run of 1 of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for earth continuity including all labour charges etc., complete. Makes:Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

20

-

422

... More
ACRS at Kadiri;Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Polycab /RPG / Million / Power Flex / Anchor / V-Guard.

30

-

2090

... More
ACRS at Kadiri;Supply, Transportaton, and fixing of 4-36/40W box type tube light fitting with 28Watt electronic ballast with all accessories with 40Watt tube and operating voltage 90 to 350 Volts, power factor 0.98 and harmonics shall be as per IS specifications including all labour charges and conveyance of all materials etc complete with with flexible wire and connections. Makes: Makes: Wipro / G.E. / Phillips / Crompton / jaj/Havells/HPL/Halonix

4

-

3452

... More
ACRS at Kadiri;Supply of Supply of 48" (1200mm) Sweep 5 star rated Ceiling Fan , with double ball bearings, air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton HS Plus / Havells ES Neo/Orient Energy Star/ Halonix(Zephyr)/Polycab(Synergy Star)

4

-

9180

... More
ACRS at Kadiri;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

-

696

... More
ACRS at Kadiri;Supply of 1 Module Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes : GM Four-Five / Legrand Arteor / Schneider Zen celo / MK Blenge.

4

-

1636

... More
ACRS at Kadiri;Supply and fixing of concealed box PVC/MS with hook for fan

2

-

80

... More
ACRS at Kadiri;Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

40

-

2141

... More
ACRS at Kadiri;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

3622

... More
ACRS at Kadiri;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation). BH Make: Anchor / Gold Medal Olive / Million Zoom.

4

-

668



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.