Andhra Pradesh Disaster Recovery Project Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Disaster Recovery Project Tender
Civil And Construction
Eprocure
Opening Date17 Dec 2018
Closing Date17 Jan 2019
Tender Amount₹ 1,02,00,000
Costs
EMD
₹ 1,10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
91/apdrp/comp2.1-w /rrcs/pred/03/ Rambilli/001
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_APDRP_419531_1Bid Award Id
ViewTender No
174/AP/PR/APDRP/ RRCS/ PRESD/2017-18 dt.11.12.2018Tender Authority
Andhra Pradesh Disaster Recovery Project ViewPurchaser Address
-Website
http://http://apsdma.ap.gov.in/view-apdrp
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of granular sub-base by providing well graded HBG metal (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
27.84375
-
-
Providing, laying, spreading and compacting graded stone aggregate (HBG) to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
55.6875
-
-
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
371.25
-
-
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
742.5
-
-
Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
18.5625
-
-
Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for quadrential revetment.
113.9
-
-
Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD 305, MoRT&H by using machinery including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
25.875
-
-
3 Vents of 8.00 Mts. Span Bridge(1 No.)
-
-
-
Earthwork in excavation for structures in ordinary soils as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH by mechanical means upto 3mts. depth,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
2418.83
-
-
Filling in foundation trenches with sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
115.68
-
-
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Leveling Coarse
82.26
-
-
Providing vibrated reinforced cement concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Foundation/Raft
238.525
-
-
Providing vibrated cement concrete M 25 grade (Design Mix) in Substructure using 40, 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Cutoff walls/ Raft
53.4
-
-
Providing vibrated reinforced cement concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Foundation/Raft
71.82
-
-
Providing vibrated Cement concrete M 25 grade (Design Mix) in Substructure using 40, 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for body walls
322.69
-
-
Providing Vibrated Reinforced Cement concrete M 25 grade (Design Mix) in Substructure using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Bed Blocks / Backing Walls
13.06
-
-
Providing and laying Reinforced Cement Concrete M-30 grade fusing 20mm &10 mm HBG (SS5) M/c graded metal including cost and and conveyance of all materials, vibrating, centering, machine mixing, curing hire and operational charges of all T& P but excluding cost and its fabrication charges of steel etc complete as per drawing and as per technical specification clauses 800,1205.4 and 1205 MORD /Sections . No. 1500, 1600 & 1700 /MoRTH including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Deck Slab
195.4
-
-
Providing concrete for plain concrete M15 ( Design mix) in open foundations using 40, 20 & 10mm size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge for Foundations.
8.1
-
-
Reinforced reinforced cement concrete approach slab with M 30 grade concrete excluding reinforcement and formwork complete as per drawing and Technical specification Clause 800, 1211 MORD / 1500, 1600, 1700 & 2704 MORTH including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge but excluding Cost of Steel
17.19
-
-
Providing and laying cement concrete wearing course M 30 grade design mix including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH, including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
15.86
-
-
Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1404.3 MORD ,including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
71.68
-
-
Supplying, fitting, and placing HYSD bar reinforcement ( Fe-500) in foundations complete as per drawing and technical specifications Clauses 1000,and 1202 MORD & 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
21.35
-
-
Supplying, fitting, and placing HYSD bar reinforcement( Fe-500) in sub-Structure complete as per drawing and technical specifications Clauses 1002,1010and 1202 MORD & 1600, 2200 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
14
-
-
Supplying, fitting, and placing HYSD bar reinforcement (Fe-500) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
13
-
-
Supply and fixing of mastic pads 25.40mm including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
17.56
-
-
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH, including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
72
-
-
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
37.39
-
-
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges,seignorage, all taxes etc complete but excluding GST and as per direction of Engineer in charge
216.29
-
-
Providing SS Revetment 300mm thick including cost and conveyence of material to sit including labour charges for packing of stones for revetment etc., complete for finished item of work as per MoRTH specification 250 4(5th Revision) ncluding cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
54.71
-
-
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH ncluding cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
351.33
-
-
Supply and fixing of mastic pads 25.40mm including cost of labour, hire charges of machinary, Contractor Profit and Over Head charges, all taxes etc complete but excluding GST and as per direction of Engineer in charge
28.04
-
-