Andhra Pradesh Disaster Recovery Project Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Disaster Recovery Project Tender

Works
Eprocure
Opening Date16 Mar 2019
Closing Date15 Apr 2019
Tender Amount₹ 1,18,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaGSTor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit,Over head charges, GST and Seignaorage charges etc complete

1263.6

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit,Over head charges, GST and Seignaorage charges etc complete

1462.5

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete

1350

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete

9000

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete

9000

-

-

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects, including overhead charges & Contractors profit, GST and seigniorage charges etc., complete

225

-

-

... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800,900 and 1404.2.2 MORD including overhead charges & Contractors profit, GST and seigniorage charges etc., complete -

56.25

-

-

... More
Construction of 1000mm dia Pipe Culvert 2 Nos

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaGSTed suitable material as per Technical Specification 305,1101.4 of MORD including contractors profit,Over head charges, GST and Seignaorage charges etc complete

51.46

-

-

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit, GST and seigniorage charges etc., complete for finished item of work.

9.12

-

-

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete for Leveling Coarse

6.04

-

-

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete for Foundations

40.58

-

-

... More
Providing and laying RCC NP3 class (as per design) for culverts on prepared bedding (PCC-M10) including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per clause 1106 and as per clause 1100 of MORD including overhead charges & Contractors profit, GST and seigniorage charges etc., complete

20

-

-

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD including contractors profit,Over head charges, GST and Seignaorage charges etc complete - For Protection Work

162

-

-

... More
Construction of 2m Span RCC slab culvert

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaGSTed suitable material as per Technical Specification 305,1101.4 of MORD including contractors profit,Over head charges, GST and Seignaorage charges etc complete

62.56

-

-

... More
Filling sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including overhead charges & Contractors profit, GST and seigniorage charges etc., complete for finished item of work.

5.57

-

-

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse

11.91

-

-

... More
Providing concrete for plain concrete M15 ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete for Foundations

12.5

-

-

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806,807 and 900 MORD including overhead charges & Contractors profit, GST and seigniorage charges etc., complete

48.91

-

-

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806,807 and 900 MORD ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete (upto 5m height)

3.54

-

-

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800,900 and 1401 MORD ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete upto 5m height. - For Super Structure (Deck slab)

4.68

-

-

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD including contractors profit,Over head charges, GST and Seignaorage charges etc complete

14

-

-

... More
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm iincluding contractors profit,Over head charges, GST and Seignaorage charges etc complete

3.6

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001,1002,1003,1004 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete - For Sub Structures

0.4

-

-

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001,1002,1003,1004 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit, GST and seigniorage charges etc., complete - For Super Structures

1

-

-

... More
Road Safety interventions

-

-

-

... More
Providing and fixing of kilometre stones of size 350x250x1100 mm precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.55x0.55x0.60 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, overhead charges & Contractors profit, GST and seigniorage charges etc., complete for finished item of work.

3

-

-

... More
Providing and fixing of 200m/Hectometre stones of size mm 650x150x1100 precasted with RCC (1:2:4) using 20 mm and 10 mm HBG Metal and using 5 Kgs/sqm of steel HYSD bars including cost and fabrication charges and embedding these stones in 0.35x0.30x0.40 m size Cement concrete M20 Grade CC(1:2:4) using 20 mm and 10 mm HBG metal below ground level,painting ,lettering etc Complete as per Drawings and technical specification clause 1703 of MORD including cost and conveyance of all materials, all labour charges, overhead charges & Contractors profit, GST and seigniorage charges etc., complete for finished item of work.

11

-

-

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign board as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, overhead charges & Contractors profit, GST and seigniorage charges etc., complete for finished item of work. for 600 mm Equilateral triangle

10

-

-

... More
Providing and erecting direction and place identification of information board of size 1500*1000mm boards as per as per IRC 67 made of 2 mm thick MS sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70mm width& required message letters & figures with reflective tape engineering grade as per MoRD specifications of required shade & colour supported & welded on two numbers 47mmX47mmX12SWG sheet tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, GST, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge.

1

-

-

... More
Providing and erecting direction and place identification of retro-reflectorised sign boards as per as per IRC 67 made of made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting 2.0 mm thick with reflective border of 70 mm width & required letters & required message letters & figures with retro reflective sheeting as per clause 1701.3.8 and 1701.3.9 of as per MoRD specifications of required shade & colour supported on 2 inch Dia. GI Pipe of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to ground by mean of property designed foundation with M-20 grade cement concrete 450mmX600mmX600mm below ground level as per approved drawing clause 1701 including cost, conveyance, taxes of all materials required & fixing at site as per approved drawing & direction of Engineering in charge for APDRP Information board of size 1500mm x 900mm including all over heads and Contractors profit and seinorage charges Including GST

2

-

-

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, overhead charges & Contractors profit, GST and seigniorage charges etc., complete for finished item of work.

480

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.