Airports Authority Of India Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Airports Authority Of India - AAI Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date26 Oct 2024
Closing Date16 Nov 2024
Tender Amount₹ 44,95,327
Costs
EMD
₹ 89,907Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AAI_210076_1Tender No
AAI/VZ/ENGG(E)/ARMOTender Authority
Airports Authority Of India ViewPurchaser Address
-Website
http://https://www.aai.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Designing, supplying, fixing & maintaining of water proof 10 mtr length LED pixel strip suitable to work on 230 Volt AC, 50Hz supply of desired colors based on the theme of the festival for which decoration is made at different location of City Side and Inside of the Terminal Building including all related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
450
-
-
2 nd Year
450
-
-
Designing, supplying, fixing & maintaining of 100 watt to 150 watt LED PALCO light suitable to work on 230 Volt AC, 50Hz supply of desired colours based on the theme of the festival for which decoration is made at different locations on City side and Inside of Terminal Building including all related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
1000
-
-
2 nd Year
1000
-
-
Designing, supplying, fixing & maintaining of 100 watt to 150 watt Colour LED bay light/LED Facade Light suitable to work on 230 Volt AC, 50Hz supply of desired colours based on the theme of the festival for which decoration is made at different locations on City side and Inside of Terminal Building including all related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
350
-
-
2 nd Year
350
-
-
Designing, supplying, fixing & maintaining of Color LED Globe light suitable to work on 230 Volt AC, 50Hz supply of desired colors based on the theme of the festival for which decoration is made at different locations on City side and Inside of Terminal Building including all related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
350
-
-
2 nd Year
350
-
-
Decoration with different type of Art and Crafts in Departure and Arrival of Terminal Building based on the themes of Festival/occasion including platform (of area around 70 to 150 Sq. Feet), decorative illumination and as mentioned in the technical specification and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
14
-
-
2 nd Year
14
-
-
Design, fabricate, install, and maintain a decorative and interactive selfie point (10 ft x 6.5 ft) at departure and arrival side of terminal building based on the theme of the festival for which decoration is made including all other related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
14
-
-
2 nd Year
14
-
-
Decoration with Marigold Flower in Departure and Arrival of Terminal Building and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
6
-
-
2 nd Year
6
-
-
Making Rangoli design in Departure and Arrival of Terminal Building based on the theme of the festival for which decoration is made at different locations of the Terminal Building and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and cleaning after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
14
-
-
2 nd Year
14
-
-
Decoration of Departure and Arrival gates of Terminal Building based on the theme of the festival for which decoration is made including all other related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
12
-
-
2 nd Year
12
-
-
Decoration with balloon arch at different Gates of Terminal Building during Independence day Celebration and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system.
-
-
-
1st Year
14
-
-
2 nd Year
14
-
-
Supply, installation, and decoration of a 4 ft. to 5ft. artificial Christmas tree with high-quality ornaments and LED lighting at different location of Terminal Building during Christmas day celebration and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system.
-
-
-
1st Year
3
-
-
2 nd Year
3
-
-
Santa Claus Character Performance for Christmas Events at Departure and Arrival and side of terminal Building, interaction with passengers, distribute gift and candy and maintain a joyful and festive demeanor at all times as per technical specification etc. complete as required. (The performance shall be 3 days and 8 to 10 hours per day)
-
-
-
1st Year
3
-
-
2 nd Year
3
-
-
Decoration with National Flag/Tri Color Cloth with good quality fabric and beautifully arranged in stripes or patterns that reflect your country's heritage inside and outside of Terminal Building during Independence day and Republic day Celebration and maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system.
-
-
-
1st Year
600
-
-
2 nd Year
600
-
-
Providing Lettering work (letter size shall be 2 ft to 2.5 ft) in durable and weather-resistant materials suitable with Creative and thematic designs reflecting the spirit of each occasion as mentioned in technical specification, ensuring high visibility and aesthetic appeal maintaining the same by deploying suitable manpower round the clock during the entire period of Festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. completed as required.
-
-
-
1st Year
14
-
-
2 nd Year
14
-
-
Designing, supplying, fixing & maintaining of water proof Meteor Shower LED Lights (each of at least 0.5 Meter) suitable to work on 230 Volt AC, 50Hz supply of desired colors based on the theme of the festival for which decoration is made at different locations on city side of the Terminal Building including all related accessories and maintaining the same by deploying suitable manpower round the clock during the entire period of festival as specified in the technical specification and dismantling including taking back the same materials after the festival without alteration of existing structure/system etc. complete as required.
-
-
-
1st Year
3500
-
-
2 nd Year
3500
-
-
Engage a professional photographer to capture both day and night stills and videos of the decoration of different festivals, and produce a 60 to 90 second short film with appropriate background music for promotion on social media platforms like Twitter, etc.
-
-
-
1st Year
7
-
-
2 nd Year
7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%