Agricultural Marketing Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Agricultural Marketing Department - AMD Tender

Opening Date5 Jul 2021
Closing Date19 Jul 2021
Tender Amount₹ 35,24,286 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them within 100 metre lead not Exceeding 3 sq.m. in area, including all sundries, all incidental and operational charges,and all labour charges etc.complete for finished item of work or as directed by the Engineer-in-Charge.

1

-

233.98

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for COLUMNS

3.72

-

40965.29

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for LINTELS

1.44

-

15956.68

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for Sun Shade/Chajja of Slab Average thickness of 62.50mm

15.52

-

12065.25

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for BEAMS

17.07

-

153778.82

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 125mm thick

324.13

-

406121.71

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 150mm thick

11.11

-

15417.96

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.

46.88

-

293760.05

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Brick Masonry in CM (1:4) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:4) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.

13.68

-

87096.03

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.

215.86

-

73925.57

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.

490

-

161308

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Plastering 12 mm thick in single coat in CM (1:3) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.

152.81

-

52140.46

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911, SS 912 or as directed by Engineer-In-Charge for external walls

1082.57

-

255919.08

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge

12.08

-

11126.98

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Dadooing to walls with Glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., but excluding seigniorage charges, on materials,complete as per drawing and technical specifications for finished item of work or as directed by Engineer-In-charge.

58.27

-

47870

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., but excluding seigniorage charges complete for finished item of work or as directed by Engineer-in-Charge. (APSS No. 901 903).

315.52

-

143190.19

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply, Installation and commissioning approved make floor mounted Close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approvedmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects:White Colour

3

-

28153.8

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge

181.05

-

180474.26

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing skirting to internal walls to 10/15 cm height/risers of steps with Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge

15

-

11388.15

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supplying Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 580 mm x 440 mm

1

-

1589.47

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supplying Fixing 12.7 mm N.P bib tap Indian make heavy dutys

10

-

3965.2

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply fixing of PVC low level systemwith internal components short bend:10 Litres capacity Single Flush

1

-

1424.73

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 ofwhite glazedwith 'P' trap

1

-

2026.89

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply & Fixing of Door with salwood of Size 1.50x2.10m alround frame 90mmx60mm thick & 30mm thick solid bond wood black board type with teak ply on both faces with shutter such as hold fasts 6No's & Buthinges(PC) 125mm 6 No's & Tower bolt(PC) 150mm 2No's & Aldrops 250mm steel 1No handels 125mm 1 Np with nuts & bolts Including Labour Charges For Fixing the Shutter frame etc., Complete for Finished item of Work.

6.3

-

29080.17

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply & Fixing of Door with salwood of Size 1.05x2.10m alround frame 90mmx60mm thick & 30mm thick solid bond wood black board type with teak ply on both faces with shutter such as hold fasts 6No's & Buthinges(PC) 125mm 3 No's & Tower bolt(PC) 150mm 2No's & Aldrops 250mm steel 1No handels 125mm 1 Np with nuts & bolts Including Labour Charges For Fixing the Shutter frame etc., Complete for Finished item of Work.

13.23

-

61150.38

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing and fixing factory made uPVC white colour sliding glazed door comprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, i

24.3

-

193148.55

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 45x75 MM . The two Vertical members are to be joined together with the horizontal member using 8x50 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall usi ng hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member. (BMT- N.83A) and Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame with fixing all fixures ( BMT N-

7.88

-

34311.38

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing complete for finished item of work at all floor levels.

50

-

6150

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

50

-

39822

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supplying Fixing Indian make Flat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Double C.P. Pillar cock

5

-

14491.6

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;SF HYSD bars (Lap splicing) - Providing High Yield Strength Deformed (HYSD) (Fe 415 grade as per IS 1786-1979) of different d iameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for rein forcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

6

-

444332.34

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work or as directed by Engineer-In-Charge for Internal walls

457.94

-

88358.56

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with standard GI ceiling angles, sections perimeter channels including cost and conveyance of all materials and labour charges etc complete

184.81

-

85040.77

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for COLUMNS

0.87

-

10150.59

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.

5.01

-

32488.62

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.

30.51

-

11336.71

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.

28.6

-

10246.16

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 100mm thick

22.91

-

26741.51

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for BEAMS

0.69

-

7446.59

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., but excluding seigniorage charges complete for finished item of work or as directed by Engineer-in-Charge. (APSS No. 901 903).

22.91

-

11280.49

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and Fixing of ISI 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 rigid FRLS PVC pipe on surface of wall with PVC Junction boxes and all accessories fixing on chromium plated metallic base saddles including Fixing of existing suitable size Decolam board / MS metal box / Modular box for fixing flush type/ Modular switches for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. ) - Makes : Precision/Universal Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/Orbit/ AKG

100

-

9373

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and Fixing of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid FRLS PVC pipe on surface of wall with PVC junction boxes fixing on chromium plated metallic base saddles including all required materials and labour charges etc., complete for run of mains. Makes : Precision/Universal Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/Orbit/ AKG

60

-

4669.8

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and fixing of 6A/10A ISI Mark 3/2 pin Modular socket with 6A/10A 1way Modular switch, 3 Module box with cover frame on a Common switch board including cost and conveyance of all materials and all labour charges etc., complete in N.R.B. / R.B.Accessories Makes: Accessories Makes: Legrand Myrius / Crabtree verona / LT/ HPL/ Schneider Livia/ GM- Zicono/ CS/Goldmedal(Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series/Precision/Koncept(Samrat/Qura)/Ploycab(Levana)/ Anchor-Roma/ A mron/IndoAsian/Pointer

48

-

20136.96

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and fixing of 6A ISI mark Flush type switch with 6A 3/2 pin wall plug socket on a common switch board with earth connections in surface wiring including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor

12

-

1748.4

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA SP MCB including internal connection and labour charges for Flush Mounting etc., complete. Makes: ABB/Standard / Havells-euro II / HPL (Techno) / Indo Asian / CS / LT/GM /Gold Medal/Anchor/Salzer. MCB Makes: ABB- S200/Standard / Havells-euro II / HPL (Techno) / Indo Asian / C S /LT-Exora/ GM /Gold Medal/Anchor/Salzer

3

-

5051.31

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-5.1.1. Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings, power input not more than 50W , air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton / Bajaj Kassels 50 / Usha atom

20

-

45446

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-3.8.20.a Supply, transportation and fixing of ..36 W..... Recessed / Surface mounting 2' x 2' (600x600 mm) LED luminaire made o f CRCA sheet housing with powder coated with acrylic diffuser, Constant current Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , Wi th System lumen output = 3200lm operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV, THD<10%, with high power LED's having efficacy of > 120 lumins / watt, CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. a) LUMINAIRE MAKE : Philli ps /Lighting Technologies(LT) / GE-Venture / Crompton / Wipro / Bajaj / Havells / VIN /Halonix/Jaquar/HPL b) LED MAKE : PHILIPS LUMI LEDS / CREE / NICHIA / OSRAM / SAMSUNG.

18

-

71577.54

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and fixing of (8 +12) 4 Way TPN DB Horizontal with IP 43 Protection suitable for 12 Nos S.P out goings and for 1 No 4 pole In comer etc complete as per IS 8623; IS 13032; IEC 61439-3. with 1 No 40A FP Isolator and 12 Nos 6-32 A 10kA SP MCBs of including internal connections and labour charges for SURFACE Mounting etc., complete. DB Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/LT-Newrange. Isolator MCB makes:Makes:Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Crabtree-Xpro/LT-AU

2

-

17024.98

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-1.7.1.l Supply of ?stepped type Electronic Regulator... Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor

20

-

4090.2

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-1.4.3.d Supply of Peeta Boards of size 18" x 24"

2

-

624.88

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Providing independent earthling by excavating a pit to a depth of 2.25Mt in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 G.I. double earth wire and accessories with 18" dia 2" thick hume pipe ring duly providing staggered holes including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder in layers and all labour charges etc., complete.

2

-

8068.48

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and Run of 4 of 10.0 Sq.mm WPSC (Whether Proof Single Core) Aluminium cable of ISI mark along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

80

-

9057.6

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and Run of 1 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for earth continuity inlcuding all labour charges etc., complete copper cable Makes: Gloster/ Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal / Finecab /Fortune Art / Kundan cab/Sudhakar/Orbit/Standard/Tamra/Anchor

100

-

3628

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;Supply and Run of 1 of 56/0.3mm (4.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for earth continuity inlcuding all labour charges etc., completecopper cable Makes: Finolex / RR kabel / Havells /KEI

150

-

8142

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-2.7.1.c Supply of 63A 415V... Porcelain Rewirable Fuse Units. Makes: CS/Standard/HPL/ Sputnik / Million / Gold Medal / Benlo /Anchor

6

-

1704.24

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-3.8.13. Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700 K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GE-Venture / Crompton / Bajaj / VIN /Haloni x/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.

8

-

7271.36

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-5.5.1.f Supply of .............. split AC unit with high wall mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units with 3 mts of copper piping, insulation kit and 4 mts of 3 core copper flexible cable including cordless remote control etc. 1.5 TR 3 Star capable of delivering 18000 BTU / hr and above with operating on refrigerant R-32 / R-410A Makes: Toshiba RAS18S3KS / Blue Star VA or VC series / Daikin FTE-M or N Sereis / Hitachi / Voltas / Carrier Superia.

4

-

188600.92

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-5.8.1.d Supplly of ???... Stabilizer. Makes: V-Guard / Real Guard / Uni Stab / ITL. 4.0 KVA

5

-

15338.05

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-5.9.24. Supply, Fabrication of 1 set MS bracket suitable for fixing out door unit of split AC unit.

4

-

5453.52

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-5.9.30. Installation of Split Air Conditioners. ELEC-5.5.28

4

-

7271.36

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-1.8.2.h Supply of ? 16A / 20A 1 Way 1 Module Modular Switch .???????.. Makes: Legrand Myrius / Crabtree verona / LT/ HPL/ Schneider Livia/ GM- Zicono/ CS/Goldmedal(Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series/Pre cision/Koncept(Samrat/Qura)/Ploycab(Levana)/ Anchor-Roma/ Amron/IndoAsian/Pointer

4

-

340.84

... More
Construction of Office Building for DEE AM Office and ADM Office over the existing Building at Marke;ELEC-1.8.2.l Supply of ? 16A/6A 1 way Combi Socket Modular Socket with shutter???????.. Makes: Legrand Myrius / Crabtree verona / LT/ HPL/ Schneider Livia/ GM- Zicono/ CS/Goldmedal(Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series/Precision/Koncept(Samrat/Qura)/Ploycab(Levana)/ Anchor-Roma/ Amron/IndoAsian/Pointer

4

-

568.08



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.