Agricultural Marketing Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Agricultural Marketing Department - AMD Tender
Opening Date2 Aug 2021
Closing Date16 Aug 2021
Tender Amount₹ 41,11,660 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
431188Bid Award Id
ViewTender No
SE(AM)/AP/GNT/Ep/14/02/2021-22, Dt.30-07-2021Tender Authority
Agricultural Marketing Department ViewPurchaser Address
-Website
http://http://agricoop.nic.in/divisiontype/agricultural-marketing
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Plain Cement concrete (1:4:8) using 40 mm metal with hand mixing upto Plinth level: PCC (1:4:8) Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 40mm size nominal machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as hand mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials for finished item of work, but excluding Centering Scaffolding, Shuttering
21.09
-
77389
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering . For Footings
20
-
162324
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering. For Pedestals (Below Plinth)
2
-
17340
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering. For Plinth Beam
7
-
74072
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts. For Columns
4.83
-
53508
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts. For Beams
15
-
136113
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply & Fixing of HYSD bars (Lap splicing) - Providing High Yield Strength Deformed (HYSD) (Fe 415 grade as per IS 1786-1979) of different d iameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for rein forcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
11
-
814609
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.
52.43
-
339388
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Brick Masonry in CM (1:4) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:4) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.
2
-
13149
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Dadooing to walls with Glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., but excluding seigniorage charges, on materials,complete as per drawing and technical specifications for finished item of work or as directed by Engineer-In-charge.
30
-
24689
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Flooring with Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
104
-
110254
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Providing skirting to internal walls to 10/15 cm height/risers of steps with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
17
-
10597
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 ofwhite glazedwith 'P' trap
3
-
6081
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supplying Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995
3
-
2761
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supplying Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar cock
3
-
8027
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and Fixing of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid FRLS PVC pipe on surface of wall with PVC junction boxes fixing on chromium plated metallic base saddles including all required materials and labour charges etc., complete for run of mains. Makes : Precision/Universal Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/Orbit/ AKG
80
-
6226
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and Run of 2 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete.copper cable Makes: Finolex / RR kabel / Havells /KEI
48
-
2039
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and fixing of 6A ISI mark Flush type switch with 6A 3/2 pin wall plug socket on a common switch board with earth connections in surface wiring including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
20
-
2914
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and Run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., completecopper cable Makes: Finolex / RR kabel / Havells /KEI
120
-
10514
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and fixing of ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W-60W Lamp (for new installation) Accssories Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor. Lamp Makes: Phillips / Crompton / Bajaj / Surya / Havells / Style Lamp / Capart
17
-
1499
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;110 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm
40
-
20178
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T P etc., complete for finished item of work. (APSS NO. 309 310) - Earth filling (ordinary soil)
120
-
5246
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Filling with Carted Gravel in trenches, sides of foundations basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 310).
82
-
26661
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Wiring with run of 3 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated 1100V grade as per IS:694/1990 specification copper cable in existing surface pipe including supply and fixing of Ceiling rose and 6A ISI mark Flush type switch on suitable size decolam board including cost and conveyance of all material and all labour charges etc., complete for for fan and Exhaust fan points in N.R.B. copper cable Makes: Finolex / RR kabel / Havells /KEI .Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
45
-
37817
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Providing independent earthling by excavating a pit to a depth of 2.25Mt in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 G.I. double earth wire and accessories with 18" dia 2" thick hume pipe ring duly providing staggered holes including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder in layers and all labour charges etc., complete.
1
-
4034
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts. For Lintels
2.5
-
27796
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts. For Sun Shade/Chajja of Slab Average thickness of 62.50mm
8
-
7563
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
320
-
105990
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
150
-
51788
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700 K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GE-Venture / Crompton / Bajaj / VIN /Haloni x/Jaquar/HPL/Havells / GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.
20
-
18178
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Plain Cement concrete (1:5:10) using 40 mm metal with concrete mixer. All work upto plinth level: PCC (1:5:10) Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 40mm size nominal machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials for finished item of work, but excluding Centering Scaffolding, Shuttering
8
-
28319
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply of split AC unit with high wall mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units with 3 mts of copper piping, insulation kit and 4 mts of 3 core copper flexible cable including cordless remote control etc. 1.5 TR 3 Star capable of delivering 18000 BTU / hr and above with operating on refrigerant R-32 / R-410A Makes: Toshiba RAS18S3KS / Blue Star VA or VC series / Daikin FTE-M or N Sereis / Hitachi / Voltas / Carrier Superia
3
-
141451
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts. For Slab 125mm thick
135
-
170292
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts. For Steps
2.1
-
15679
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Providing and fixing factory made uPVC window white colour sliding glazed doorcomprising of uPVC multi-chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmission gear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all c
25.92
-
206025
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Providing and fixing of top hung Ventilators made of pre Painted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work. - Single fixed Louvers Ventilator size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section size of 80 x 45mm
1.08
-
4659
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;SINGLE SIDE PRELAM SOLID PANEL PVC DOOR FRAME (CHOUKHAT): Providing and fixing factory made Pac single side Prelam door frame of the size 50X47 mm with a wall thickness of 5mm, made out of extruded 5mm rigid Pac single side prelam sheet, meter cut at two corners and joined with 2nos. of 150mm long brackets of 1515mm MS.Square tube. The two vertical door profiles are to be reinforced with 19X19mm MS. square tube of 19guage. The door frame shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a minimum of 4nos. of screws to be provided for each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacture specification and direction of Engineer-in- charge.
15.6
-
5849
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Providing and fixing 30mm thick BRAND FACTORY MADE WIRE MESH SOLID PVC DOOR SHUTTER consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mmX19mm for stiles and 15mm for top, lock bottom rails. MS. Frame shall have a coat of steel primers of approved make and manufacture. 19mmX19mm M.S. squaretubes shall be covered with 5mm thick heat moulded ?Rajshri? PVC ?C? channel of size 30mm thickness, 90mm width out of which 75mm shall be flat and 15mm shall be flat and 15mm shall be bent in 900 on the inner side to from top and bottom rail land 130mm wide PVC sheet out of which 100mm shall be flat and 154mm shall be bent in 900 on both side to from lock rail, 10mm(5mmX2) thick, 20mm wide cross PVC sheet as gap insert for top rail bottom rail. Panel will be of G.I.wire mesh of 24gauge to be fitted in by ?C? channel of size 35mm X10mm on the either side in the stiles. The inner side ?C? channel is fixed by 19mmX19mm MS. Tube on both sides with screws. The wire mesh in top bottom lock rail is sealed with15mm X 15mm tube with G.I.wire 10mm(5mmX2) thick PVC strip of 25mm width is to be stucknails on both side of G.I. wire mesh int erior at the top, bottom lock rail. An additional 5mm thick PVC srip of 20mm width is to be stuck on the interior side of the ?C? channel using PVC solvent cement adhesive etc. complete as per direction of Engineer-in-charge, manufacturer?s specification drawings
4.05
-
9203
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and Fixing of Premium make CPVC Pipes and Fittings of dia 28.60mm ODPipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)
100
-
13975
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;II. 1st Floor
-
-
-
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for COLUMNS
5
-
55357
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for LINTELS
0.75
-
8317
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for Sun Shade/Chajja of Slab Average thickness of 62.50mm
15
-
14181
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 125mm thick
135
-
170292
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 150mm thick
13
-
18183
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.
40
-
258927
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
150
-
51788
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911, SS 912 or as directed by Engineer-In-Charge for external walls
1530.41
-
361789
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
250
-
82805
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Flooring with Soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 810 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
104
-
103477
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Dadooing to walls with Glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., but excluding seigniorage charges, on materials,complete as per drawing and technical specifications for finished item of work or as directed by Engineer-In-charge.
18
-
14813
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., but excluding seigniorage charges complete for finished item of work or as directed by Engineer-in-Charge. (APSS No. 901 903).
135
-
61640
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and fixing of Country wood fully paneled door size of 1.20x2.10mm with outer frame of CRCA section 50X60MM of 1.25mm thick and inner shutter with 100X30mm thick planks of 25mm thick including wrought and put up and specials such as M.S powder coated hingles 6Nos-125mm, Tower bolts 3Nos-150mm, Handles 4Nos-150MM, alldrop 1No-300MM and M.S. hold fast 4Nos etc. complete as per standard specification and as directed by Dept.
10.08
-
46659
... More
Construction of Office Building at New Market Yard Cheepuripalli under AMC, Cheepuripalli in Viziana;Supply and fixing of best teak wood fully panelled door size of 1.50x2.10m with outer frame of 125X100MM of thick and shutter with double door using 125X35mm thick frame and planks of 25mm thick including wrought and put up and including cost of specials such as M.S powder coated hinges 6Nos-125mm, Tower bolts 3Nos-150mm, Handles 4Nos-150MM, and Alldrop 1No-300MM and M.S. hold fasts 4Nos etc. complete as per standard specification and as directed by Dept.
6.3
-
60716
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements