Agricultural Marketing Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Agricultural Marketing Department - AMD Tender
Opening Date23 Jul 2021
Closing Date7 Aug 2021
Tender Amount₹ 51,28,501 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
427852Bid Award Id
ViewTender No
SE(AM)/AP/GNT/Ep/12/13/2021-22, Dt.20-7-2021Tender Authority
Agricultural Marketing Department ViewPurchaser Address
-Website
http://http://agricoop.nic.in/divisiontype/agricultural-marketing
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of New Office Building;Plain Cement concrete (1:5:10) using 40 mm metal with concrete mixer. All work upto plinth level: PCC (1:5:10) Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 40mm size nominal machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials for finished item of work, but excluding Centering Scaffolding, Shuttering
24.96
-
95259
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering for FOOTINGS
10.65
-
90564
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering for PEDESTALS (Below Plinth)
6.92
-
62888
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Centering Scaffolding, Shuttering for PLINTH BEAMS
11.12
-
122544
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for LINTELS
5.63
-
59973
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for COLUMNS
4.55
-
52819
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for BEAMS
9.87
-
107235
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 125mm thick
227.71
-
299018
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 150mm thick
20.91
-
30493
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for Sun Shade/Chajja of Slab Average thickness of 62.50mm
11.57
-
9394
... More
Construction of New Office Building;Plain Cement concrete - Nominal Mix (1:3:6) using 20mm metal with hand mixing: PCC (1:3:6) Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as hand mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials for finished item of work, but including Centering Scaffolding, Shuttering FOR BED BLOCKS
8.79
-
45655
... More
Construction of New Office Building;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.
58.28
-
374768
... More
Construction of New Office Building;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
478.99
-
166457
... More
Construction of New Office Building;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
188
-
68202
... More
Construction of New Office Building;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911, SS 912 or as directed by Engineer-In-Charge for internal walls
591.15
-
70737
... More
Construction of New Office Building;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911, SS 912 or as directed by Engineer-In-Charge for external walls
397.09
-
97117
... More
Construction of New Office Building;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
262.38
-
327892
... More
Construction of New Office Building;Flooring with Non-skid red or white full body Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water, tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
61.99
-
58774
... More
Construction of New Office Building;Providing skirting to internal walls to 10/15 cm height/risers of steps with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., and including all operational incidental charges and all labour charges etc., complete, but excluding seigniorage charges, for finished item of work or as directed by the Engineer-in-Charge
81.48
-
51358
... More
Construction of New Office Building;Supply and fixing of Salwood door frame with 100mmX75mm and flush door shutter of 35mm thick with teak on both sides with all accessories such as 'Z' hold fast, butt hinges, aldrop, tower bolts, handles, door stopers etc all comformed to ISI stanrderds including cost and conveyence of all materials and labour charges etc complete.
27.72
-
94692
... More
Construction of New Office Building;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding doors three track - two glass shutters sliding and one mesh shutter sliding- 95 -Series duly manufactured using UPVC reinforced profiles of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.0 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.0 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricate d & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter shall be made of (48.5 mm x 30 mm))/(50 mm x 26.5 mm) x 2.0 mm uPVC profile section and fitted with nylon/polymer mesh and rollers/pulley duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber
28.41
-
174649
... More
Construction of New Office Building;Supply, Installation and commissioning approved make floor mounted Close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approvedmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects:White Colour
5
-
46923
... More
Construction of New Office Building;Supplying Fixing Indian make Flat Back Wash Hand Basin1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock
6
-
14254
... More
Construction of New Office Building;Supply and Fixing of Premium make CPVC Pipes and Fittings of dia 28.60mm ODPipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)
60
-
8385
... More
Construction of New Office Building;Supply and Fixing of Premium make CPVC Pipes and Fittings of dia 22.20mm OD Pipe - SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)
60
-
5794
... More
Construction of New Office Building;Manufacture, Supply and Delivery of Unplasticised PVCs pipes 110mm dia 4 kgs for portable water supplies confirming to IS : 4985 / 2000 (3rd revision) with bell ends (Socket) as per specification in light (Grey / Natural Ivory Grey / Any other color (except white) inclusive of transportation to the sub divisional stores anywhere in Andhra Pradesh excluding taxes
35
-
12049
... More
Construction of New Office Building;Supplying Fixing CP Long body bib cock fancy type deluxe heavy duty 12.7 mm dia Indian make
11
-
6836
... More
Construction of New Office Building;Supply fixing bib cock cum health faucet with 1 m long flexible tube and wall hook ofJaquar make queen series with 7 years warranty Chrome plated
5
-
21348
... More
Construction of New Office Building;Supply and Fixing of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 3 regid FRLS PVC pipe on surface of wall with PVC junction boxes fixing on chromium plated metallic base saddles including all required materials and labour charges etc., complete for run of mains.(Data No. ) - Makes : Precision/Universal Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/Orbit/ AKG
350
-
24773
... More
Construction of New Office Building;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated 1100V grade as per IS : 694 / 1990 specification for Copper cable in existing surface pipe including supply and fixing of Ceiling rose and 6A ISI mark Flush type switch on suitable size decolam board including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B. copper cable Makes: Finolex / RR kabel / Havells /KEI Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
30
-
19124
... More
Construction of New Office Building;Wiring with run of 3 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated 1100V grade as per IS:694/1990 specification copper cable in existing surface pipe including supply and fixing of Ceiling rose and 6A ISI mark Flush type switch on suitable size decolam board including cost and conveyance of all material and all labour charges etc., complete for for fan and Exhaust fan points in N.R.B. copper cable Makes: Finolex / RR kabel / Havells /KEI .Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
14
-
11975
... More
Construction of New Office Building;Supply and fixing of 6A ISI mark Flush type switch with 6A 3/2 pin wall plug socket on a common switch board with earth connections in surface wiring including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor
30
-
4498
... More
Construction of New Office Building;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin 1 way Modular combi socket, 16 Amps Modular switch, 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B.Accessories Makes: Legrand Myrius / Crabtree verona / LT/ HPL/ Schneider Livia/ GM- Zicono/ CS/Goldmedal(Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series/Precision/Koncept(Samrat/Qura)/Ploycab(Levana)/ Anchor-Roma/ Amron/IndoAsian/Pointer
5
-
3075
... More
Construction of New Office Building;Supply and fixing of ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W-60W Lamp (for new installation) Accssories Makes: GM G Home / Gold Medal Olive / Million Zoom / Great white Omega/Koncept/Vimal opel/Anchor. Lamp Makes: Phillips / Crompton / Bajaj / Surya / Havells / Style Lamp / Capart
12
-
1096
... More
Construction of New Office Building;Supply of 1 Module Modular type Electronic step type Fan Regulator. Makes: Legrand Arteor / Schneider Zen celo/ Crabtree Murano or Amare/LT-englaze/ GM-Zenova/Goldmedal(i-Push)
14
-
7158
... More
Construction of New Office Building;Supply and Run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., completecopper cable Makes: Finolex / RR kabel / Havells /KEI
140
-
12454
... More
Construction of New Office Building;Supply and Run of 1 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for earth continuity inlcuding all labour charges etc., complete. copper cable Makes: Finolex / RR kabel / Havells /KEI
40
-
890
... More
Construction of New Office Building;Supply and Run of 2 of 56/0.3mm (4.00 Sq.mm) with Run 1 of 36/0.3mm (2.5Sqmm) FRLS / HFFR / ZHFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. copper cable Makes: Finolex / RR kabel / Havells /KEI
40
-
5977
... More
Construction of New Office Building;Providing independent earthling by excavating a pit to a depth of 2.25Mt in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 G.I. double earth wire and accessories with 18" dia 2" thick hume pipe ring duly providing staggered holes including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder in layers and all labour charges etc., complete.
1
-
4063
... More
Construction of New Office Building;Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings, power input not more than 50W , air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton / Bajaj Kassels 50 / Usha atom
14
-
31812
... More
Construction of New Office Building;Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700 K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GE-Venture / Crompton / Bajaj / VIN /Haloni x/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.
20
-
18178
... More
Construction of New Office Building;Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA SP MCB including internal connection and labour charges for Surface Mounting etc., complete. Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/LT-Newrange . MCB Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens-5SX4/ Crabtree-Xpro/L T-AU
1
-
1907
... More
Construction of New Office Building;Supply and Run of 2 of 6.0 Sq.mm W P T C Aluminium cable of ISI mark along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete.
100
-
9394
... More
Construction of New Office Building;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., but excluding seigniorage charges complete for finished item of work or as directed by Engineer-in-Charge. (APSS No. 901 903).
115.42
-
55101
... More
Construction of New Office Building;Plain cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD - For Height upto 5m - P.C.C grade M 20 - Nominal mix (1:2:4) using CC Mixer (MORD)
0.73
-
3654
... More
Construction of New Office Building;Providing Mild Steel, Structural Steel, I.e., Angles, Channels and I sections.of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings to be supplied at the time of execution of work, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, weleded joints, etc., and all operational, incidental, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of labour charges for fixing Iron Doors, Iron Windows and Window Grills in position etc. complete for finished item of work or as directed by the Engineer-in-Charge.
1
-
112252
... More
Construction of New Office Building;Painting with Synthetic Enamel paints - Two Coats - For New Iron Work using ready mixed Synthetic Enamel paint in all shades Grade-I including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 1212 or as directed by the Engineer-In-Charge
31.25
-
3588
... More
Construction of New Office Building;Supplying Fixing HYSD (Welding) - Providing High Yield Strength Deformed (HYSD) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and welding using electrodes, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, welding, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, welding excluding sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
13
-
1042256
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for COLUMNS
2.98
-
36670
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc., but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for LINTELS
3.58
-
40109
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for BEAMS
6.93
-
78493
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 125mm thick
152.35
-
208470
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Steel Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for SLAB 150mm thick
11.76
-
17852
... More
Construction of New Office Building;VRCC M20 Nominal Mix (Cement:Fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine cru shed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including all operational, incidental and all labour charges such as machine mixing, laying concrete, curing etc.,but excluding cost of steel and its fabrication charges, seigniorage charges, sales other taxes on all materials etc., complete as per drawing, Technical specification for finished item of work or as directed by Engineer-in- Charge, but including Wooden Centering Scaffolding, Shuttering-Unsupported height upto 3.66mts for Sun Shade/Chajja of Slab Average thickness of 62.50mm
10.43
-
8870
... More
Construction of New Office Building;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class: Brick Masonry 230 mm thick with Cement Mortar (1:6) prop. (Cement:Sand) using Common Burnt Clay Bricks Non-Modular of traditional size 23 x 11 x 7 cm 2nd Class from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., but excluding seigniorage charges, complete as per drawing and Technical specifications cluase APSS 504 for finished item of work or as directed by Engineer-in Charge for panel walls in Super-Structure, parapet walls.
27.92
-
185918
... More
Construction of New Office Building;Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
263.71
-
99596
... More
Construction of New Office Building;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting Grooves etc., but excluding seigniorage charges, sales other taxes on all materials, complete as per the drawing, technical specification clauses APSS 901, 903 904 for finished item of work or as directed by the Engineer-in-Charge for Brick Wall and RCC exposed faces.
171.43
-
67374
... More
Construction of New Office Building;SF HYSD bars (Lap splicing) - Providing High Yield Strength Deformed (HYSD) (Fe 415 grade as per IS 1786-1979) of different d iameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for rein forcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
3
-
228041
... More
Construction of New Office Building;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911, SS 912 or as directed by Engineer-In-Charge for internal walls
363.13
-
43452
... More
Construction of New Office Building;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911, SS 912 or as directed by Engineer-In-Charge for external walls
343.94
-
84118
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements