Agricultural Marketing Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Agricultural Marketing Department - AMD Tender
Civil Works Others
Opening Date19 Jul 2019
Closing Date3 Aug 2019
Tender Amount₹ 7,63,000 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
285140Bid Award Id
ViewTender No
SE(AM)/AP/GNT/EP/04/07/2019-20, Dt:18.07.2019Tender Authority
Agricultural Marketing Department ViewPurchaser Address
-Website
http://http://agricoop.nic.in/divisiontype/agricultural-marketing
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Plain Cement Concrete equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed. BLD CSTN 2.7
5
-
3258.55
Vibrated Cement Concrete Nominal mix equivalent to (1:2:4) proportion (cement: fine aggregate: Coarse aggregate) using 66.67% of 40mm HBG metal and 33.33% of 20mm HBG (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work BLD CSTN 2.11
7.5
-
4357.55
Brick Masonry in superstructure with CM (1:6) prop: using traditional second class bricks of sixe 23x11x7cms from approved source having minimum crushing strength of 35 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (BLD CSTN 3.1.iv)
3
-
5472.95
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. BLD CSTN 6.3
30
-
243.6
Painting to New Iron work with two coats of Ready Mixed Synthetic Enamel Paint first quality all shades over base coat of Red Oxide making 3 caots including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. In All Floors (BLD CSTN 10.7 & 10.12 - v)
50
-
151.75
Whiting to new walls and ceiling in two coats with White Cement or equavalent quality to give an even shade after thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all materials and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the surface, painting, curing etc., complete for finished item of work for internal walls. in All Floors (BLD CSTN 9.5)
375
-
34.15
Colour Washing Two coats with best quality Gopi Colour including cost and converyance of all materials such as lime, gum, brushes and all labour charges etc., complete for finished item of work as per SS and as directed by the Engineer-in-Charge.
485
-
51.25
Whiting to old walls and ceiling in two coats with White Cement or equavalent quality to givean even shade after thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all materials and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the surface, painting, curing etc., complete for finished item of work for internal walls. in All Floors (BLD CSTN 9.5
400
-
34.15
Reparis to Rolling shutters by applying grease to guides, bearings and springs etc and tensioning the springs and making movement freely and all labour cahrges and scaffoling chrges etc., complete as per standard specifition and as directed by the Engineer-in-charge for finished item of work
2
-
1000
Supply & Fixing of 15’-3” c/c (4.65M) long roof purlins made of 50X50 3.60mm square Pipe including at eves and ridges with 6 mm thick cleats for fixing to trusses including red oxide coating etc., complete and as per the drawing enclosed and as per standard specification for finished item of work.
19
-
514.61
Roofing With 0.5mm thick galvanized /pre painted G.I profiled sheets fixed to the purlins With 14 size self drilling with neoprene washer Side laps are stiched with self tapping drilling screws .End laps are to be sealed with 25x3 mm Butyl tape .the sheets are provided with anti capillary groove.including cost and labour charges etc., complete as per standard specification for finished item of work. BMS-W.45
75
-
760
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. BLD CSTN 6.3
6
-
243.6
Painting to New Iron work with two coats of Ready Mixed Synthetic Enamel Paint first quality all shades over base coat of Red Oxide making 3 caots including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. In All Floors (BLD CSTN 10.7 & 10.12 - v)
4
-
151.75
Colour Washing Two coats with best quality Gopi Colour including cost and converyance of all materials such as lime, gum, brushes and all labour charges etc., complete for finished item of work as per SS and as directed by the Engineer-in-Charge.
17
-
51.25
Reparis to Rolling shutters by applying grease to guides, bearings and springs etc and tensioning the springs and making movement freely and all labour cahrges and scaffoling chrges etc., complete as per standard specifition and as directed by the Engineer-in-charge for finished item of work
6
-
1000
Grove cutting for existing Brick work for capping of varandah Galvalume sheet and filling with cement motor in the groove including cost and conveyance of all materials and conveyance of all materials labour charges for finished item of work as per standard specification.
25
-
55
Supply & Fixing of 15’-3” c/c (4.65M) long roof purlins made of 50X50 3.60mm square Pipe including at eves and ridges with 6 mm thick cleats for fixing to trusses including red oxide coating etc., complete and as per the drawing enclosed and as per standard specification for finished item of work.
50
-
514.61
Roofing With 0.5mm thick galvanized /pre painted G.I profiled sheets fixed to the purlins With 14 size self drilling with neoprene washer Side laps are stiched with self tapping drilling screws .End laps are to be sealed with 25x3 mm Butyl tape .the sheets are provided with anti capillary groove.including cost and labour charges etc., complete as per standard specification for finished item of work. BMS-W.45
100
-
760
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. BLD CSTN 6.3
50
-
243.57
Painting to New Iron work with two coats of Ready Mixed Synthetic Enamel Paint first quality all shades over base coat of Red Oxide making 3 caots including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. In All Floors (BLD CSTN 10.7 & 10.12 - v)
95
-
151.75
Whiting to new walls and ceiling in two coats with White Cement or equavalent quality to give an even shade after thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all materials and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the surface, painting, curing etc., complete for finished item of work for internal walls. in All Floors (BLD CSTN 9.5)
515
-
34.15
Colour Washing Two coats with best quality Gopi Colour including cost and converyance of all materials such as lime, gum, brushes and all labour charges etc., complete for finished item of work as per SS and as directed by the Engineer-in-Charge.including cost and converyance of all materials such as lime, gum, brushes and all labour charges etc., complete for finished item of work as per SS and as directed by the Engineer-in-Charge.
455
-
51.25
Reparis to Rolling shutters by applying grease to guides, bearings and springs etc and tensioning the springs and making movement freely and all labour cahrges and scaffoling chrges etc., complete as per standard specifition and as directed by the Engineer-in-charge for finished item of work
4
-
1000
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Foundation of Building.
45
-
289.5
Filling with Sand under footings with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational & incidental charges, labour charges, hire and opertaional charges of T & P etc., complete for finished item of work.
5
-
496.65
Plain Cement Concrete equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed. BLD CSTN 2.7
5
-
3258.55
Vibrated Reinforced Cement Concrete M25 Design mix equivalent to (1:2:4) using 20mm size (SS5) hard blasted granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for Foundations, Plinth, Pedastals Below Plinth BLD CSTN 2.13 A For Columns Footings
8
-
7899.3
Vibrated Reinforced Cement Concrete M25 Design mix equivalent to (1:2:4) using 20mm size (SS5) hard blasted granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for Foundations, Plinth, Pedastals Below Plinth BLD CSTN 2.13 A For Columns and Pedestals Upto Ground level
2.5
-
8368.55
Vibrated Reinforced Cement Concrete M25 Design mix equivalent to (1:2:4) using 20mm size (SS5) hard blasted granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for Foundations, Plinth, Pedastals Below Plinth BLD CSTN 2.13 A For Ground Level Beam
3.6
-
10162.5
Vibrated Reinforced Cement Concrete M25 Design mix equivalent to (1:2:4) using 20mm size (SS5) hard blasted granite machine crushed graded metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for Foundations, Plinth, Pedastals Below Plinth BLD CSTN 2.13 A For Above ground level columns
2.5
-
10260.75
Brick Masonry in superstructure with CM (1:6) prop: using traditional second class bricks of sixe 23x11x7cms from approved source having minimum crushing strength of 35 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (BLD CSTN 3.1.iv)
15
-
5472.95
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. BLD CSTN 6.3
90
-
243.6
Plastering with CM(1:5) Prop: 20mm thick including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. BLD CSTN 6.8
100
-
255.3
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
28
-
23.65
Colour Washing Two coats with best quality Gopi Colour including cost and converyance of all materials such as lime, gum, brushes and all labour charges etc., complete for finished item of work as per SS and as directed by the Engineer-in-Charge. (BLD CSTN 9.8)
315
-
51.25
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 18SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of Steel bars from approved sources to site of work, binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastages like Overlaps, couplings, chairs, spacer bars etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes on all materials complete for finished item of work (APSS No. 126) BLD CSTN 2.18 Or (2011-12 SSR AMENDMENT TO BUILDINGS STANDARD DATA No. 5)
1585
-
56.24
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements