To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Civil Works Others
Building Construction
Opening Date4 Sep 2020
Closing Date21 Sep 2020
Tender Amount₹ 9,86,642 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
348878Bid Award Id
ViewTender No
8/AU/EO/TPA/2020-21Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.angrau.ac.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Plain cement concrete (1:4:8) prop. (cement, fine aggregate, coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size Hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand coarse aggregate, water etc., to site, excluding sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete as directed by the department.
4.37
-
17017
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Footings: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
7.92
-
67486
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Pedestals: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
3.97
-
36111
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Plinth beams: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
3.63
-
40064
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Columns: GF: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
8.01
-
92411
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Lintels: GF: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
0.73
-
8429
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Roof beam:GF: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
0.95
-
10437
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;125mm thick GF slab: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,and overheads & contractors profit complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
11.7
-
15362
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Refilling with useful available excavated earth (excluding rock) in trenches sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P, including over heads and contractor profit etc.,complete for finished item of work.
43.25
-
14056
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Providing High Yield Strength Deformed (FE-500 / TMT grade as per IS 1786-2008) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawing, including cost and conveyance of steel bars including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending placing in position, tying excluding sales and other taxes on all materials etc., and overheads & contractors profit complete for finished item of work.
2514.65
-
152011
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Fly-ash cement block masonary in CM (1:6) prop. (cement : sand) in super structure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50Kg/sq.cm, including cost and conveyance of all materials like cement, sand, bricks, water etc. to site, cost of excluding sales & other taxes on all materials like and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonary, lift charges, curing overheads and contractor profit etc., complete for finished item of work.
16.12
-
103732
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Ornamental ceiling plastering 12mm thick single coat in CM(1:3) prop. Using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc,, and overheads & contractor profit complete for finished item of work.
9.36
-
3267
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Plastering 12mm thick in single coat with CM (1:5) prop. including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for internal & even faces of Brick Wall and RCC exposed surfaces for finished item of work
87.31
-
28027
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Plastering 20mm thick in single coat using screened sand in CM (1:5) prop. in including cost and conveyance of all materials like cement, sand, water etc., to site, excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractor profit complete for finished item of work.
99.91
-
33570
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Providing impervious coat to exposed RCC roof slab surface with CM(1:3)prop. 20mm thick mixing water proofing confirming to IS: 2645-2003 manufactured by reputed manufactures as approved by Engineer-in-charge at 100ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost anc conveyance of all materials like cement, sand water proofing compound, water etc., to site, operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work.
11.7
-
5277
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Supply and fixing in position sal wood single shutter door 0.90m x 2.10m using 100mm x 75mm of size sal wood scantlings of alround the frame and providing flush door shutters, solid bond wood block board type with commercial ply on both faces:30mm thick confirming to : 2202 with laminated sheet of 1mm thick and providing 6 Nos of 'Z' hold fast, 2 Nos of 12" Aluminium aldrop, 6 Nos Aluminium 4" hinges, 2 Nos of Aluminium tower bolt 6", 2 Nos of 6" aluminium handles, MS powder coated door stopper, rubber, stop bushes and all labour charges for sal wood wurught and put up, fevicol gum, nails, applying, bitumen primer for frame along mansonary side and overheads & contractors profit complete for finished item of work as directed by the department.
1.94
-
10311
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels)made of (small series) frame 92 x 44 mm & sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension (Area of window upto1.75 sqm).Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according touPVC profile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent
1.8
-
16479
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Flooring with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8 to 10mm 1st quality conforming to IS: 13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-in-charge, laying tiles using spacers of 2mm thick, set over a base coat of CM(1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement and overheads and contractor profit etc., to site (excluding cost of CC bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge etc., and overheads & contractor profit complete for finished item of work.
12.42
-
12159
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;External walls: Providing and applying synthetic plaster putty or plaster of paris putty or texture paint or lime punning of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges and overheads and contractor profit etc.,complete.
145.51
-
54857
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Internal walls: Providing and applying wall putty of white cement or polymer or cement based of averaged thickness of 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges and overheads and contractor profit etc., complete.
51.07
-
9703
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Internal walls:Supply & application of one coat water based exterior grade -I and 2 coats of acrylic exterior emulsion paint having VOC (Volatile organic compound) content less than 50 grams /litre for interior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges and overheads and contractor profit etc., and overheads & contractor profit complete for finished item of work.
51.07
-
6486
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;External walls: Supply & application of one coat water based exterior grade -II and 2 coats of acrylic exterior emulsion paint total 3 coats having VOC (Volatile organic compound) content less than 50 grams /litre for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges and overheads and contractor profit etc., and overheads & contractor profit complete for finished item of work.
145.51
-
32885
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Providing two coats with synthetic enamel paint Grade II VOC (Volatile Organic Compound) over primer coat of red oxide to New iron work conveyance of all materials to site, excluding sales & other taxes, and including incidental, operational content less than 50 grams/litre including cost and all labour charges and overheads and contractor profit etc., complete in all floors as directed by the department.
85
-
13430
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Providing mild steel flats and bars for fabricating steel works like window grills & entrance gates including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site work, all operational, incidental, incidental, and labour charges such as cutting, bending, placing in position and overheads and contractor profit etc., complete for finished item of work.
1400
-
121884
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Electrical items
-
-
-
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Supply, transportation and fixing of 90/100W LED Flood light Luminaire made of pressure diecast alluminium housing with powder coated,having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's System efficacy >100lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), IK05, Driver surge protection 4KV, external Surge protection = 10KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70, including giving wire connections, labour charges and suitable bolts and nuts complete etc., as directed by departmental Engineer. a) LUMINAIRE MAKE : Wipro / Philips/ GE-Venture / Crompton/ Bajaj /Greenlites/ Havells/ Capart(Premium) /Halonix/ Polycab/ Keselec/ HPL/ Jaquar/Eveready b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.
6
-
65730
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Supply,Transportation and fixing of 40/50 W Post Top lantern made with high Pressure die cast alluminium bodywith polycarbonate / high impact acrylic protector for optimal luminous flux ,IP66 suitable for vertical mounting of 60 mm dia.the luminaire shall have CCT 3000-4000K with internal surge protection of 4KV and External Surge Protection of 10 KV ,Pf>0.95 including giving wire connections, labour charges and suitable bolts and nuts complete etc., as directed by departmental Engineer.Make: Keselec SOFIA/Wipro LP 05 or equivalent in Philips
6
-
141000
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Supply and transportation of 4 core X 6 Sqmm XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I)./1554-I Makes: Torent / Universal / Unicab / Havells / KEI / Gloster / Polycab /RR Kabel
150
-
19500
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50sqmm on sand cushion covering the cable with bricks and back filling of Trench including cost and conveyance of materials and labour charges etc., complete.
45
-
7920
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official)
30
-
1080
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Supply and fixing of suitable size thermo plastic water tight PVC enclosure box with IP 66/67 weather proof for outdoor installation with konckouts for cable entry with 4 way SPN DB with IP-43 protection 4 No's 6-32 A SP MCB's including with suitable clampset, bolts and nuts with wire connections including labour charges as directed by Engineer in Charge etc. Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/L&T-Newrange/Indo Asian-Opti Pro.
1
-
4671
... More
Construction of main gate with security room at ANGRAU entrance, Lam, Guntur.;Supply and Fixing of ISI 25mm dia 2.2 mm thick Concealed Heavy grade with IS:9537 part 3 FRLS regid P.V.C. pipe with required all accessories including Masnory work all labour charges etc., complete .of Make: Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/ Orbit/AKG