To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Civil And Construction
Road Construction
Opening Date21 Dec 2022
Closing Date28 Dec 2022
Tender Amount₹ 24,29,484
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 3,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
576878Bid Award Id
ViewTender No
34/AU/EO/TPA/2022-23Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.angrau.ac.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Forming sub grade with embankment barrowed useful selected Gravel having MDD of not less than 1.75 Gms/CC from out side road boundary by mechanical means with all leads and lifts including prewatering of soil at barrow area, removal of top soil, excavation of soils at barrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, beaking clods, sectioning and consoilidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 ( 4th revision)
258.75
-
76849
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Construction of Granular sub-base by providing HBG material confirming to Grading - I of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (with 53mm - 26.5mm @ 35%, 26.5 to 4.75mm @ 45% & 2.36mm below @ 20% ) material.
92
-
140668
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing Poly sheet 125 microns laying below cement concrete road including cost and conveyance of all materials etc., Complete for finished item of work.
862.5
-
13153
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Construction of un-reinforced, plain cement concrete M20 grade pavement over a Prepared sub base with 43grade cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25mm, and conforming to clause 602.2.6.4 mixed in batching and mixing plant with weight batcher as per approved mix design, laid with a fixed form paver, spread, compacted and finished in a continuous operation including provision of contraction expansion, construction and longitudinal joints, joint filler, sealant primer, joint sealant, , finishing to lines and grades etc., as per MoRT & H specifiction1500, 1700 & 602 (5th revision) and as directed by the Engineer-in-charge.
129.38
-
433682
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing Vibrated Cement Concrete (1:3:6) using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (5th Revision) and as directed by the Engineer-in-Charge for Body walls. b)wall 150 mm thick
207
-
219834
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing thermo mechanically treated bars bars (Fe-500) of different diameters wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the direction of the Engineer-in-charge ans as per MoRT&H specification 1600 & 2100 (5th revision) and as per I.S.1786 or 1985 for Pavement. for RCC wall 150mm thick.
1150
-
90091
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
414
-
43884
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers by approved means, on prepared surface and compacting with vibratory roller to achieve the desired density at OMC ete, complete for finished item of work as per MoRT&H Specification 401 408 (5th revision) and as directed by the Engineer-in-charge.
248.4
-
73775
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Manual Means-Upto 3M depth
30
-
12030
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Filling with stone dust in trenches for sides of foundations and basements from approved quarry consolidating deposited in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
3
-
1566
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
2
-
7076
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental, vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. a) Footing.
4
-
31804
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental, vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. b) Pedestals.
2.6
-
22022
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental, vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. c) columns
2
-
21528
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental, vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. d) Roof beams.
0.65
-
6494
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental, vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. e) Plinth beam (connection beam)
1.9
-
19458
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supplying, fitting and placing HYSD (Fe- 500/ TMT grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work
1300
-
112879
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
2
-
13548
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Refilling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
24
-
792
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
33
-
10725
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. plastering 12mm quality.
33
-
7689
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for external walls. plastering 12mm quality.
33
-
6369
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Manual Means-Upto 3M depth
35
-
14035
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Filling with stone dust in trenches for sides of foundations and basements from approved quarry consolidating deposited in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
3
-
1566
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
3
-
10614
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work a) Footing.
3.5
-
27829
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work b) columns.
1.5
-
16146
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work c) Plinth beam.
0.6
-
6145
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work d) Roof beam.
0.6
-
5995
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work e) Lintel.
0.1
-
1079
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work e) Lintel.
5.5
-
8954
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supplying, fitting and placing HYSD (Fe- 500/ TMT grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work
800
-
69464
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Granolithic Concrete flooring 75 mm thick with (1:1.5:3), using 20mm mm size graded hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, with 38mm thick PCC M20 concrete and 12mm thick plastering in CM(1:3) prop on top and thread lining at regular intervals of 0.45m x 0.45m and finishing the top surface to required smoothness and slopes including cost of all materials like cement, metal sand and water and overheads & contractors profit complete for finished item of work. (APSS No.701 & 710)
0.5
-
691
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Refilling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
28
-
924
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
3.5
-
23709
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)
25
-
8425
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
30
-
9750
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Ornamental ceiling plastering 12mm thick single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
5
-
1745
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
60
-
13980
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for external walls
66.17
-
12771
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM .The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member. BMT-N.83.C
5.1
-
4692
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame BMT-N.92
1.89
-
6415
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing and fixing factory made uPVC white colour fixed glazedwindows comprising of uPVC multi-chambered frame andmullion (where ever required) extruded profiles duly reinforced with 1.60± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile),uPVC extruded glazing beads of appropriate dimension, EPDM gasket,G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plasticpackers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (ifrequired) shall be also fusion welded including drilling of holes for fixinghardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof siliconsealant over backer rod of required size and of approved quality, allcomplete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes and silicon sealant. Note: For uPVC frame, sash and mullion extruded profiles minus 5%tolerance in dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be acceptedbut no extra payment on this account shall be made.Fixed windows made of (small series) frame 47 x 50mm & mullion 47 x 68 mm both having wall thickness of 1.9 ±0.2 mm and single glazing bead of appropriate dimension
2.28
-
14223
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Manual Means-Upto 3M depth
35
-
14035
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Filling with stone dust in trenches for sides of foundations and basements from approved quarry consolidating deposited in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
9
-
4698
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
2.5
-
8845
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. a) Footing.
4.5
-
35780
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental ,vibrating charges and labour charges such as machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. b) columns.
1.3
-
13993
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;VRCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDINGcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental, vibrating charges and labour charges such as machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work. c) Top beam for shoulder wall.
0.65
-
6494
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supplying, fitting and placing HYSD (Fe- 500/ TMT grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work
700
-
60781
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
1.2
-
7530
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supply and Fixing MS pipes of approved design including cost of cutting, bending, grinding, welding, labour charges, fabrication charges etc, complete for finished item of work.
2500
-
290500
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supplying and fixing aluminium composite cladding with skin material 0.5mm thick aluminium sheet cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame (50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on structural steel work including necessary accessories complete in all respects including all scaffolding and labour charges etc., complete for finished item of work but excluding cost of structural steel fabrication, if any, ACP Cladding - 4 mm thk
85
-
250410
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
48.5
-
8294
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
35
-
10990
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
35
-
8155
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for external walls
35
-
6755
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Supply and fixing of 150mm dia, 600mm length, 6mm thick Stainless steel pipes 304 grade with dummies including cost and conveyance of all materials to site, labour charges etc complete for finished item of work.
78
-
32292
... More
Laying of CC Roads 3.75 mts wide road in field between C,D Blocks at Dr.K L Rao KVK, Garikapadu, NTR;Hire charges for JCB providing for removing of bushes, trunks, trees and jungle providing for cleaning along compound wall existing RCC poles and received barbed wire removing cost and conveyance of all materials and labour charges etc., complete as directed by the department.
5
-
5750
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements