Acharya NG Ranga Agricultural University Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Opening Date8 Jan 2020
Closing Date22 Jan 2020
Tender Amount₹ 5,70,998 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
307652Bid Award Id
ViewTender No
ANU/Engg. Sec./Various Civil works/ 2019-20Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.nagarjunauniversity.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of Napaslabs.
712
-
3655
... More
Plastering with CM in two coats 20 mm thick, base coat (1:6) 16mm thick and top coat (1:4) 4mm thick with Dubara sponge finish CM in 2 coats 20 mm thick i/c cost, conveyance of all meterials, taxes, all leads, lifts, curing, centring,sccfolding,labour charges etc., complete.
40
-
3644
... More
V.R.C.C(1:11/2:3) (M20 concrete mix) in ground floor using 20 mm HBG metal obtained by plastering, hand crushed i/c cost, conveyance of all materials, taxes, all leads, lifts, scaffolding, cantering with steel cantering, curing, labour charges etc., complete. But excluding cost and fabrication of steel reinforcement For RCC precast cover slabs of 40 mm thick including placing in position etc. complete.
15
-
750
... More
Pointing to existing 40 mm thick Rough Cuddapah/Shabad stones, with cement mortar 1:3 duly filling joints nearly, including cost of all materials like cement, sand, and water etc., complete, including seigniorage charges, labour charges for finished item of work, but excluding the cost of Napaslabs and base coat .
210
-
1150
... More
Flooring with Pavers of 40 to 50 mm thick 1st. quality of any shade as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707) in All Floors
30
-
815
... More
Flooring in ground floor with 20 mm thick granolithic concrete (1:1:2) floor toping , laid over existing c.c. base / rcc and finished to even and smooth surface i/c cost, conveyance of all materials , all leads, lifts, curing, labour charges etc., complete.
20
-
2848
... More
Supplying, fabrication, fixing of MS Grills and approved design with M.S Flats/Square Bars i/c. cost of conveyance of all materials, taxes, labour charges etc. complete.
700
-
115
... More
Supply and fixing of Roofing sheets with 0.50 mm thickness Pre - painted Galvanized G.I Profiled sheets fixed to the purlines with 14 size self drilling screws with neoprene washer side laps are stitched with self tapping/drilling screws. End laps are to be sealed with 25 X 3 m BUtyl tape. The sheets are provided with anti capillary grove.
40
-
760
... More
Painting with best quality synthetic enamel paint of approved brand and shade for new Iron work two coats over priming coat (Total Three coats) inculding cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, etc. complete for finished item of work Ground Floor
35
-
1486
... More
Painting two coats with plastic emulsion of first quality of approved brand and colour over a primary coat (Three coats in total) including cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, etc. complete for finished item of work as directed by the Engineer-in-charge for external walls FOR GROUND FLOOR
200
-
174
... More
Supplying and fixing of Following PVC items i/c cost, conveyance of all meterials,taxes,labour charges etc., compete.
-
-
-
... More
110 mm Dia.pipes.
26
-
283
... More
110 mm elbows
4
-
91
... More
Engaging of workers for different works such as removing of napa slabs, Grass cutting lifting of mud soil etc and any other works as and when required complete. i/c cost, conveyance of all meterials,taxes,labour charges etc., complete.
-
-
-
... More
Manmazdoors
20
-
500
... More
Masons
20
-
594
... More
Dismantling of the PCC and removing derbies away from the site i/c cost conveyance of all materials, taxes, labour charges, etc., complete.
1
-
451
... More
Supplying and fixing of Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick i/c.cost, conveyance of all meterials,taxes, labour charges etc., compete.
15
-
839
... More
Providing specialized polysulphide sealant treatment to the expansion joints (Size : 25mm x 12mm) duly a]. Chipping and removing of existing covering on expansion joints b]. Cleaning of the surface from dirt, dust and other contaminations c]Application of one coat of - High performance specially designed SBR latex polymer based bonding agent d]. Providing and application of Acrylic Polymer modified reinstatement concrete /mortar to the damaged edges of joint and making the groove. e]. Providing and fixing of masking tape on top of the joint both sides f]. Providing and fixing of Back up support material of Backer rod to leave the depth of 12mm on the joint g]. Providing and application of one coat of polysulphide primer
on inner edges of Joint. h]. Providing and application of Two part Polysulphide sealant to a width of 25mm and 12mm depth with putty knife and neat finish i]. Removing of masking tape and providing and application of two coats of Acrylic elastomeric cementitious coating I/c cost conveyance of all materials taxes, labour charges etc complete
35
-
567
... More
Supplying and applying of NITHO - BOND Chemical after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.
100
-
159
... More
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
100
-
4046
... More
Flooring with Edge cut Ceramic Tiles of 7.3mm thick 1st. quality of any shade as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed and pointed with neat epoxy water resistant pigment paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707) for Second Floor
20
-
885
... More
Supplying and fixing of 3 mm thick Aluminum sheet of ISI quality i/c.cost, conveyance of all meterials,taxes, labour charges etc., compete.
10
-
1700
... More
Providing Tar Felting roof repair with approved brand Tar Felt duly applying one coat of appropriate grade of bitumen in hot condition @ 0.2 Kg/1 Sqm of roof area, fixing tar felt (Conforming to IS 1322-1972 specification), applying second coat of appropriate grade of hot bitumen at 1.20 Kg / 1 Sqm of roof area and spreading course aggregate (sand) at 0.063 Cum per 1 Sqm of roof area i/c.cost, conveyance of all meterials,taxes, labour charges etc., compete for finished item (BMT-H.59).
11
-
252
... More
Supplying and fixing of railway sun glass sheet 6 mm thick inculding cost of fixing inculding cost and conveyance of all materials to site, labour charges etc. complete
70
-
1200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements