Acharya NG Ranga Agricultural University Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Civil And Construction
Civil Works Others
Opening Date4 Sep 2020
Closing Date21 Sep 2020
Tender Amount₹ 11,56,811 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
348793Bid Award Id
ViewTender No
32/AU/EO/TPA/2020-21Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.angrau.ac.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Plain cement concrete (1:5:10) prop. (cement, fine aggregate, coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size Hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand coarse aggregate, water etc., to site, excluding sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete as directed by the department.
9.75
-
32224
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Footings: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
19.5
-
147576
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Columns: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
10.25
-
102449
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Plinth beams: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
12.42
-
122101
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Providing Thermo Mechanically Treated (FE-500 /TMT grade as per IS 1786-2008) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawing, including cost and conveyance of steel bars including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending placing in position, tying excluding sales and other taxes on all materials etc., and overheads & contractors profit complete for finished item of work.
4328.44
-
249924.13
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Fly-ash brick masonary in CM (1:6) prop. (cement : sand) in super structure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50Kg/sq.cm, including cost and conveyance of all materials like cement, sand, bricks, water etc. to site, cost of excluding sales & other taxes on all materials like and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonary, lift charges, curing overheads and contractor profit etc., complete for finished item of work.
62.37
-
332931
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Plain cement concrete M-20 grade mix(using 400 kg cement) using 20mm (1:1.5:3) prop. (Cement:fine aggregate: coarse aggregate) using 6mm to 20mm machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., and labour charges formachine mixing, laying concrete, finishing, curing etc., complete for finished item of work.
1.36
-
7525
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Filling with useful available excavated earth with a lead of 50m in trenches, sides of foundations and basement, sides of foundation layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T&P etc., and overheads & contractors profit complete for finished item of work.
69.96
-
18120
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Plastering 12 mm thick single coat in CM(1:5) prop. using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. Excluding Seigniorage charges
392.4
-
103201
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Plastering 20mm thick single coat in CM(1:5) prop. using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. Excluding Seigniorage charges
351
-
97227
... More
Construction of compound wall behind the building at KVK, Kalikiri, Chittoor Dist.;Painting to new wall with 2 coats of acrylic emulsion paint of approved brand and shade over a cement primer of Exterior grade-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, with neat finishing including cost and conveyance of all materials to site and all operational, incidental, labour charges etc., complete for finished item of work. External colouring
743.4
-
140503
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements