Acharya NG Ranga Agricultural University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Acharya NG Ranga Agricultural University - ANGRAU Tender

Opening Date16 Sep 2020
Closing Date30 Sep 2020
Tender Amount₹ 2,74,309 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renovation of ANUCET Office;Brick work in CM(1:6) using approved quality traditional size bricks i/c cost, conveyance of all meterials, taxes, all leads, lifts,curing, centring, sccfolding, labour charges etc., comlpete.

1

-

5972

... More
Renovation of ANUCET Office;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707) in All Floors

24.67

-

20106

... More
Renovation of ANUCET Office;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

25

-

31770

... More
Renovation of ANUCET Office;Plastering with CM in 2 coats, 12 mm thick, base coat in CM (1:5), 8 mm thick and top coat in CM (1:3), 4mm thick with Dubara sponze finish including cost and conveyance of all materials such as cement, sand, seigniorage charges, all operational, incidental and labour charges such as mixing mortar, application, curing, etc. complete for finished item of work

10

-

3577

... More
Renovation of ANUCET Office;Flooring in ground floor with 20 mm thick granolithic concrete (1:1:2) floor toping , laid over existing c.c. base / RCC and finished to even and smooth surface i/c cost, conveyance of all materials , all leads, lifts, curing, labour charges etc., complete.

10

-

2848



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.