Acharya NG Ranga Agricultural University Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Acharya NG Ranga Agricultural University - ANGRAU Tender

Metal Fabrication
Opening Date15 Dec 2020
Closing Date30 Dec 2020
Tender Amount₹ 17,41,582 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;High polished Granite 16to 18 mm thick upto 2.43 m black including cost and conveyance of all materials and labour charges etc. Complete as directed by the department.

55.47

-

125473

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Full rounding the edges of Marble/Granite stone slabes of all thickness including polishing the same including cost and conveyance of all materials labour charges etc.complete as directed by the department.

315.2

-

147514

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Ornamental ceiling plastering 12mm thick single coat in CM(1:3) prop. Using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc,, complete for finished item of work.

200.2

-

73674

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;First Floor: Plastering 12mm thick in single coat with CM (1:5) prop. including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for internal & even faces of Brick Wall and RCC exposed surfaces for finished item of work

1680.64

-

569737

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Second Floor : Plastering 12mm thick in single coat with CM (1:5) prop. including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for internal & even faces of Brick Wall and RCC exposed surfaces for finished item of work

304.2

-

112554

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour chargesand overheads & contractors profit etc., complete

2484.84

-

462180

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;75 mm dia :Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges and overheads & contractors profit etc., complete for finished item of work at all floor levels.

60

-

11100

... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;110 mm dia :Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges and overheads & contractors profit etc., complete for finished item of work at all floor levels.

100

-

25900



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.