Acharya NG Ranga Agricultural University Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Metal Fabrication
Opening Date15 Dec 2020
Closing Date30 Dec 2020
Tender Amount₹ 17,41,582 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
362656Bid Award Id
ViewTender No
52/AU/EO/TPA/2020-21Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.angrau.ac.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;High polished Granite 16to 18 mm thick upto 2.43 m black including cost and conveyance of all materials and labour charges etc. Complete as directed by the department.
55.47
-
125473
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Full rounding the edges of Marble/Granite stone slabes of all thickness including polishing the same including cost and conveyance of all materials labour charges etc.complete as directed by the department.
315.2
-
147514
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Ornamental ceiling plastering 12mm thick single coat in CM(1:3) prop. Using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc,, complete for finished item of work.
200.2
-
73674
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;First Floor: Plastering 12mm thick in single coat with CM (1:5) prop. including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for internal & even faces of Brick Wall and RCC exposed surfaces for finished item of work
1680.64
-
569737
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Second Floor : Plastering 12mm thick in single coat with CM (1:5) prop. including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for internal & even faces of Brick Wall and RCC exposed surfaces for finished item of work
304.2
-
112554
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour chargesand overheads & contractors profit etc., complete
2484.84
-
462180
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;75 mm dia :Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges and overheads & contractors profit etc., complete for finished item of work at all floor levels.
60
-
11100
... More
Construction of first floor New Boys Hostel superstructure work at Dr. NTR College of Agricultural E;110 mm dia :Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges and overheads & contractors profit etc., complete for finished item of work at all floor levels.
100
-
25900
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements