Acharya NG Ranga Agricultural University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Acharya NG Ranga Agricultural University - ANGRAU Tender

Civil And Construction
Civil Works Others
Opening Date23 Dec 2022
Closing Date30 Dec 2022
Tender Amount₹ 15,09,266 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
To carry out Civil works for providing Lift facilities;Supply and spreading of Granular sub-base Material 2.36 mm & below from approved quarry including cost and conveyance all materials to work site and spreading in uniform layers including taxes, sienorage, labour charges etc. complete for finished item of work

1

-

909.66

... More
To carry out Civil works for providing Lift facilities;P.C.C (1:4:8) machine basis for foundation / base concrete using 40mm HBG metal of approved quantity by blasticral hard broken i.e. of all materials taxes, high order less octrai, all leads, lifts chip labour charges etc complete

2

-

8032.01

... More
To carry out Civil works for providing Lift facilities;V.R.C.C(1:11/2:3) in ground floor using 20mm HBG metal obtained by plastering, hand crushed i/c cost, conveyance of all materials, taxes, all leads, lifts, cantering, scaffolding, curing, labour charges etc., complete. But excluding cost and fabrication of steel reinforcement

-

-

-

... More
To carry out Civil works for providing Lift facilities;for footings

10

-

84458.88

... More
To carry out Civil works for providing Lift facilities;for plinth beams for ground floor

1.5

-

16177.5

... More
To carry out Civil works for providing Lift facilities;for beams for Ground floor

1.5

-

16215

... More
To carry out Civil works for providing Lift facilities;for beams for first floor

1

-

11030

... More
To carry out Civil works for providing Lift facilities;for beams for second floor

7

-

81781

... More
To carry out Civil works for providing Lift facilities;for columns at G.F.

6

-

71604

... More
To carry out Civil works for providing Lift facilities;For columns at F F

1

-

12524

... More
To carry out Civil works for providing Lift facilities;For columns at S F

1

-

13298

... More
To carry out Civil works for providing Lift facilities;for T beams & Slab beams

1

-

10810

... More
To carry out Civil works for providing Lift facilities;Supplying,cutting,fabrication of steel for reinforcement i/c.cost, conveyance of all meterials,taxes, labour charges etc., compete.

3.5

-

318528

... More
To carry out Civil works for providing Lift facilities;Dismantling of the Brick work and removing derbies away from the site i/c cost conveyance of all materials, taxes, labour charges, etc., complete.

2

-

5378.07

... More
To carry out Civil works for providing Lift facilities;Brick work in CM(1:8) ground floor using approved quality traditional size bricks i/c cost, conveyance of all materials, taxes, all leads, lifts, curing, centring, scaffolding, labour charges etc., compete

-

-

-

... More
To carry out Civil works for providing Lift facilities;Ground floor Pariksha Bhavan

11

-

80476

... More
To carry out Civil works for providing Lift facilities;First floor at Priksha Bhavan

10

-

77560

... More
To carry out Civil works for providing Lift facilities;Second Floor at pariksha Bhavan

10

-

80660

... More
To carry out Civil works for providing Lift facilities;Plastering with CM in two coats in 20 mm thick, base coat (1:6) 16mm thick and top coat (1:4) 4mm thick with Dubara sponge finish i/c.cost, conveyance of all meterials,taxes, labour charges etc., compete

-

-

-

... More
To carry out Civil works for providing Lift facilities;Ground floor

60

-

27408

... More
To carry out Civil works for providing Lift facilities;First floor

50

-

26430

... More
To carry out Civil works for providing Lift facilities;Second floor

75

-

44077.5

... More
To carry out Civil works for providing Lift facilities;Plastering with CM in two coats of 12 mm thick, base coat in c.m ( 1:5) 8mm thick and top coat in c.m (1: 3) 4mm thick with Dudara sponge finish i/c. cost, conveyance of all materials, taxes, labour charges etc., compete.

-

-

-

... More
To carry out Civil works for providing Lift facilities;Ground floor

60

-

26784

... More
To carry out Civil works for providing Lift facilities;First floor

50

-

25940

... More
To carry out Civil works for providing Lift facilities;Second floor

70

-

40474

... More
To carry out Civil works for providing Lift facilities;Painting two coats with plastic emulsion of first quality of approved brand and colour over a primary coat (Three coats in total) including cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, etc. complete for finished item of work as directed by the Engineer-in-charge for External walls

185

-

26085

... More
To carry out Civil works for providing Lift facilities;Painting two coats with plastic emulsion of first quality of approved brand and colour over a primary coat (Three coats in total) including cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, etc. complete for finished item of work as directed by the Engineer-in-charge for internal walls

180

-

19440

... More
To carry out Civil works for providing Lift facilities;Painting Two coats with synthetic enamel paint of grade-I approved brand, and shade to old wood/ iron work including preparing the surface to give an even finish including the cost, of scaffolding, brushes etc., complete

50

-

6350

... More
To carry out Civil works for providing Lift facilities;Providing and applying synthetic plaster putty or equilant putty such as Birla wall care putty or Texture paint or equivalent such as NCL/ Saicoat texture paint of average 2 to 3 mm thickness over plastered surface to prepare sthe surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials applying emergy paper, Sand the surface, clean & wipe off loose dust, applying putty/texture paint5 filleer by putty knife/muslin pad, air dry for 2-3 hours, sand papers of 180 to 320nos, emergy paper for the surface preparation including cost and conveyance of all materials to site, and all operational, incidental and labour charges etc., complete for finished item of work

185

-

37370

... More
To carry out Civil works for providing Lift facilities;Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre, Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., complete for finished item of work as per special spn 1105 i/c cost, conveyance of all materials , taxes, labour charges etc., complete.

15

-

52620

... More
To carry out Civil works for providing Lift facilities;Supplying, fabricating & providing MS. guard bars of approved design with MS flats / square bars i/c welding , cutting, hoisting, fixing in position, painting primary coat with red oxide i/c cost, conveyance of all materials , taxes, labour charges etc., complete.

600

-

87600

... More
To carry out Civil works for providing Lift facilities;Dismantling of the VRCC and removing derbies away from the site i/c cost conveyance of all materials, taxes, labour charges, etc., complete.

1.2

-

2718.2

... More
To carry out Civil works for providing Lift facilities;Anchoring of steel HYSD steel rods to existing broken columns rods for jointing the RCC structures without any cracks as specified i/c cost conveyance of all materials, taxes, labour charges, etc., complete.

60

-

18000

... More
To carry out Civil works for providing Lift facilities;Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of work, but excluding the cost of conveyance of all materials

-

-

-

... More
To carry out Civil works for providing Lift facilities;Ground Floor

16

-

54763.44

... More
To carry out Civil works for providing Lift facilities;Frist Floor

16

-

56174.48

... More
To carry out Civil works for providing Lift facilities;Second Floor

16

-

57505.44



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.