Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

CA NO: CE A&N Z/PB/ OF 2018 - 2019 SERIAL PAGE NO: 134 PARTICULAR SPECIFICATIONS (Contd.,) Contd., 1. GENERAL 1.1 Work under this contract shall be carried out in accordance with Schedule ‘A’, Particular Specifications, Drawings and general specifications and other provisions in MES Standard Schedule of Rates (here-in-after called MES Schedule) 2009 Part-I (Specifications) & 2010 Part-II (Rates) read in conjunction with each other including amendments and errata. 1.2 Term “General Specifications” referred to herein before as well as referred to in IAFW- 2249 (General Conditions of Contracts) shall mean the specifications contained in the MES Schedule 2009 Part-I (Specifications). 1.3 General Rules, Specifications, Special Conditions and all preambles in the MES Schedule shall be deemed to be applicable to the work under this contract, unless specifically stated otherwise in these documents in which case the provisions in these documents shall take precedence over the aforesaid provisions in the MES Schedule. The term ‘as specified’ wherever appears in tender documents and drawings, relates to relevant particular specifications and in its absence general specifications. All references to MES Schedule (Standard Schedule of Rates) in these specifications relate to 2009 Part-I (Specifications) of MES Schedule unless otherwise mentioned. References to only some paragraphs of MES Schedule have been made in these particular specifications but other paragraphs and provisions as applicable are also to be followed for all sections/parts of Schedule ‘A’ even though not particularly mentioned hereinafter. 1.4 Where specifications for any item of work are not given in MES Schedule or in these particular specifications, specifications as given in relevant Indian Standard or Code of Practice or specification given by MoRTH’s as applicable shall be followed. 1.5 Any drawing, which is mentioned on the drawings forming part of the tender but not specifically mentioned in the list of drawings, shall be deemed to be forming part of the tender. The tenderer shall see such drawings/details in the office of Accepting Officer/GE. 1.6 Rate quoted for a particular item and/or Lumpsum quoted by the tenderer shall be deemed to include for any minor details/items of work and/or constructions which are obviously and fairly intended and which may not have been included in these documents but which are essential for the execution and entire completion of the work. Decision of the Accepting Officer as to whether any minor details of work and/or construction is obviously and fairly intended to be included in the contract or not shall be final, conclusive and binding. However, some of the minor details/items, which shall be deemed to be essential for execution and entire completion of work are detailed as under for guidance: - (i) Reinforcement for any RCC member not indicated in the drawings. The reinforcement details for such items shall be as directed by GE. (ii) Dwarf wall in situations like verandah, passage etc. not indicated in drawings. (iii) Lintels over doors, windows and openings not shown in drawings. (iv) Bolts, nuts and washer, thickness and size of gusset plates etc., though not indicated on drawings but essential for usage. 1.6.1 In all the above and other similar cases, the details indicated elsewhere in the drawings, which are similar, or near similar to the missed out items of work shall be followed. In the absence of any other similar or near similar details, minimum essential requirement for completion of the work from structural and utility point of view shall be deemed to be included in the lumpsum quoted. In the event of any dispute, decision of the Accepting Officer shall be final & binding. 1.7 RESPONSIBILITY FOR CARRYING OUT / SETTING OUT THE WORKS 1.7.1 The responsibility for carrying out the works and the methods to be adopted under this contract shall solely rest with the contractor, subjected always to the approval of contractor’s

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.