To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date29 Feb 2024
Closing Date8 Mar 2024
Tender Amount₹ 32,23,557
Costs
EMD
₹ 64,471Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_APWD_13722_1Bid Award Id
ViewTender No
NIT No. 122/EE/CD/APWD/DP/2023-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://apwd.and.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
7.2
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for:
-
-
-
... More
Foundations, footings, bases for columns
234.4
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
-
-
-
... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
14.4
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.
1052.24
-
-
... More
12 mm cement plaster finished with a floating coat of neat cement of mix :
-
-
-
... More
1:4 (1 cement: 4 fine sand)
144
-
-
... More
Providing and applying tack coat using bitumen emulsion conformingto IS:8887, using emulsion pressure distributer including preparingthe surface & cleaning with mechanical broom.
-
-
-
... More
With rapid setting bitumen emulsion
On bituminous surface @ 0.25kg/sqm
2203.2
-
-
... More
Providing and laying Bitumen Penetration Macadam with hard stoneaggregate of quality, size and grading as specified, with bitumen ofsuitable penetration grade, including required key aggregate asspecified, spreading coarse aggregate with the help of self propelled/tipper tail mounted aggregate spreader and applying bitumen by apressure distributor and then spreading key aggregate with the helpof aggregate spreader complete, including consolidation with roadroller of minimum 8 to 10 tonne capacity to achieve specified valuesof compaction and surface accuracy :
-
-
-
... More
For 50mm compacted thickness using coarse aggregateof size 50-20 mm graded @ 0.60 cum per 10 sqm keyaggregate of size 12.5 mm graded @ 0.15 cum per 10sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10sqm.
1088.4
-
-
... More
For 75 mm compacted thickness in two layers using stoneaggregate of size 63-41 mm graded @ 0.90 cum per 10sqm key aggregate of size 20.0 mm graded @ 0.18 cumper 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/10 sqm.
227
-
-
... More
4 cm thick bitumastic sheet with hot bitumen of approved quality,using stone chippings (60% with 12.5 mm nominal size and 40%with 10 mm nominal size) @ 2.60 cum per 100 sqm and coarsesand @ 2.60 cum per 100 sqm of road surface and with bitumen @56 kg/cum of stone chippings and @ 128 kg/cum of sand over atack coat with hot straight run bitumen, including consolidationwith road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) :
-
-
-
... More
With paving Asphalt grade VG - 10 heated and then mixedwith solvent at the rate of 70 grams per kg of asphalt
1102
-
-
... More
Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic materialby fully/ semi automatic thermoplastic paint applicator machine fittedwith profile shoe, glass beads dispenser, propane tank heater andprofile shoe heater, driven by experienced operator on road surfaceincluding cost of material, labour, T&P, cleaning the road surface ofall dirt, seals, oil, grease and foreign material etc. complete as perdirection of Engineer-in-charge and accordance with applicablespecifications.
91.25
-
-
... More
Providing and mixing shredded plastic waste conforming to size passing 2.36mm sieve and retained on 600 micron sieve @ 6 to 8% proportion of bitumen to be used in premix carpet surfacing as per IRC:SP:98-2013. as per direction of Engineer-in-charge.
369.4
-
-
... More
Profile correction of the existing road surface by cutting to required depth the undulated raised portions and creating a proper geometrical shape and making good the surface for proper laying and binding of the WBM including disposal of the cut out waste materials within a lead of 50mtr all complete as per the direction of Engineer-in-charge.
232
-
-
... More
Total of A(Sum of total amount)
-
-
-
... More
Routine Maintenance after completion of construction works (Lump-Sum Amount for each year)
-
-
-
... More
1st Year 0.25% of
1
7496
7496.65
... More
2nd Year 1.00% of
1
29986
29986.58
... More
3rd Year 1.50% of
1
44979
44979.87
... More
4th Year 2.00% of
1
59973
59973.16
... More
5th Year 2.75% of
1
82463
82463.1
... More
Total of B(Sum of total maintanance amount from sheet1)
-
-
-
... More
Total A+B
-
-
-