Public Works Department Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date29 Sep 2022
Closing Date19 Oct 2022
Tender Amount₹ 5,74,290
Costs
EMD
₹ 11,485Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_APWD_7488_1Bid Award Id
ViewTender No
NIT No.56/EE/RCD/APWD/WG/2022-23Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://apwd.and.nic.in/APWD/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete :
-
-
-
... More
1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
0.4
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.
302
-
-
... More
Non Schedule
-
-
-
... More
Taking out the old filter materials including stacking of serviceable materials seperately and disposal of unserviceable material lead upto 50 m disposed material to be neatly dressed.
35
-
-
... More
Extra for every additional lift of 1.50 Mtr or part therof in.
-
-
-
... More
Sand, soil, silt and vegitation (if any)
35.2
-
-
... More
Stone aggregate.
35.2
-
-
... More
Perforated slab and cc cube.
6.7
-
-
... More
Removing the existing hollow perforated slabs/CC blocks and cleaning the surface by scrapping and wire brushing and washing with fresh water and placing the same with proper position/gaps as per the direction of Engineer in charge.
6.2
-
-
... More
Removing and disposing of existing silt from filter unit and cleaning the surface and outlet pipes/chambers etc as per the direction of Engineer in charge.
15
-
-
... More
Removing algae and other deposited foreign materials from the surface by scraping and sand papering and prepreparing the surface smooth i/c necessary repairto scrateches etc complete.
23.1
-
-
... More
Supplying, filling, spreading and levelling stone metal/chips and sand of required sizes in filter bed in required thickness for all leads and lift, all complete as per direction of Engineer in charge.
-
-
-
... More
Stone aggregate 63 to 20 mm size
18
-
-
... More
Stone aggregate 20 to 12.5 mm size
18
-
-
... More
River Sand
35.2
-
-
... More
Providing, hoisting and fixing upto floor five level precast reinforced cement concrete slab setting in position, cost of required centering, shuttering but excluding the cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate ).
3.3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements