Integrated Defence Staff Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Integrated Defence Staff - IDS Tender
Eprocure
Opening Date21 Jan 2021
Closing Date8 Feb 2021
Tender AmountRefer Documents
Costs
EMD
₹ 11,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nsry/com/2213/offloading Defect Rectification On Port Boat Crane Of Ins Saryu
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IDS_611167_1Bid Award Id
ViewTender No
NSRY/COM/ 112 (C) 2 (b)/CID-2213Tender Authority
Integrated Defence Staff ViewPurchaser Address
-Website
http://https://www.ids.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Removal of various hydraulic hoses
10
-
-
Removal of Pressure adjustment unit
1
-
-
Removal of Locking pin assembly
4
-
-
Removal of Hydraulic cyclinder pin
2
-
-
Removal of Telescopic boom load pin
2
-
-
Telescopic boom pin adjustment stud removing
1
-
-
Staging for working platform
1
-
-
Telescopic crane boom supporting structure manufacture
1
-
-
Repair
-
-
-
Telescopic boom dismanteling
1
-
-
Hydraulic cyclinder big end piston pin, bolts removing
2
-
-
Telescopic boom rope handling drum/ rotor removing
1
-
-
Boom adjustment sliding bush bolt removing
12
-
-
Telescopic Boom Dismanting with : 1. Primary Unit
2. Secondary Unit
3. Third Unit
1
-
-
Dismantaling of telescopic secondary boom unit
2
-
-
Hydraulic cyclinder unit shift jetty to yard
1
-
-
Removal of Hydraulic cylinder and clean the accessaries part
1
-
-
Re-fitment of assemble the hydraulic cylinder
1
-
-
Hydraulic cylinder area fill the hydraulic oil using hydraulic pump
2
-
-
Shifting to yard to jetty. And clean the boom sliding, pin cylinder base area.
1
-
-
cylinder fitted into secondary boom
1
-
-
Telescopic second boom fitment into first boom.
1
-
-
Rope handling unit re-fitment
1
-
-
Telescopic crane boom shifting jetty to ship, on crane housing bush area supporting with external frame structure
1
-
-
Boom adjustment both end bush, pin fitment
2
-
-
The locking pin, adjust with fittings
2
-
-
Boom locking pin, adjust with fittings
2
-
-
Boom lifting both cylinder pin fitment
2
-
-
Connecting big end hydraulic piston fluid flow hose pressure adjust block fitting
4
-
-
Various hose Fitting.
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements