Integrated Defence Staff Tender

To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Integrated Defence Staff - IDS Tender

Works
Civil And Construction
Eprocure
Opening Date5 Jul 2022
Closing Date25 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1 GENERAL SERVICES (AT ACTUALS) DRY DOCK FOR THE ENTIRE DURATION UNDERWATER PACKAGE FOR DOCKING.(VERSION I & II)

60

-

-

... More
2 GENERAL SERVICES (AT ACTUALS) OFFICE SPACE WITH ALL OFFICE AMENITIES INCLUDING TELEPHONE, POWER SUPPLY.

60

-

-

... More
3 GENERAL SERVICES (AT ACTUALS) TOILET FACILITY NEAR DOCK FOR CREW.

60

-

-

... More
4 GENERAL SERVICES (AT ACTUALS) REST ROOM FOR DUTY PERSONNEL (05 PERSONNEL APPROX).

90

-

-

... More
5 GENERAL SERVICES (AT ACTUALS) JETTY CRANE, MOBILE CRANE, FORK LIFT FACILITY WHEREVER REQUIRED

15

-

-

... More
6 GENERAL SERVICES (AT ACTUALS) TRANSPORT FOR TRANSFER OF PERSONNEL AND MATERIAL (01 LMV).

150

-

-

... More
7 UNDER WATER HULL ENTIRE UNDER WATER HULL INCLUDING BOOT TOP AREA TO BE CLEANED USING HIGH PRESSURE HYDRO JET TO REMOVE MARINE GROWTH FOR FACILITATING HULL INSPECTION. ENTIRE U/W AREA, BOOT TOP AREA TO BE HYDRO JET/GRIT BLASTED.(AREA :U/W -320 SQMTR INCLUDING BOOT TOP)

320

-

-

... More
8 UNDERWATER HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/DEFECTIVE UNDERWATER HULL INCLUDING BOOT TOP AREA AS PER ST3 STANDARD. (AREA :U/W -320 SQMTR INCLUDING BOOT TOP)

320

-

-

... More
9 UNDERWATER HULL SURVEY ENTIRE UNDERWATER HULL INCLUDING BOOT TOP AREA TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :U/W -320 SQMTR INCLUDING BOOT TOP AREA)

320

-

-

... More
10 UNDERWATER HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT UNDERWATER HULL INCLUDING BOOT TOP AREA AS PER HULL SURVEY REPORT. (PAYMENT ON ACTUALS)

6

-

-

... More
11 PAINT SCHEME FULL U/W PAINT SCHEME ARE TO BE RENEWED. FULL PAINT SCHEME AS PER NO 53/16 TO BE APPLIED.(AREA :U/W 320 SQMTR INCLUDING BOOT TOP AREA) (I) FOLLOWING PAINT SCHEME USED IN UNDER WATER AREAS:- INTERGARD 269 INTERSHIELD 300 INTERSHIELD 300 INTERGARD 263 INTERSWIFT 655(BROWN) INTERSWIFT 655(RED) INTERSWIFT 655(BROWN) (II) FOLLOWING PAINT SCHEME USED IN BOOT TOP AREA:- INTERGARD 269 INTERSHIELD 300 INTERSHIELD 300 INTERGARD 263 INTERSWIFT 655(BLACK) INTERSWIFT 655(BLACK) INTERSWIFT 655(BLACK) (III) 01 COAT OF ANTIFOULING COAT IS TO BE CARRIED OUT

320

-

-

... More
12 HULL SURVEY ENTIRE ABOVE WATER LINE ARE TO BE HYDRO JET/GRIT BLASTED FOR REMOVAL OF OLD PAINT/ ST3 PREPERATION. (AREA : 50 SQMTR )

50

-

-

... More
13 HULL SURVEY USG SURVEY TO BE CARRIED OUT OF ABOVE WATER LINE AREA.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA : 50 SQMTR)

50

-

-

... More
14 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT OF ABOVE WATER LINE AREA AS PER HULL SURVEY REPORT. MAX OF 1 T STEEL (PAYMENT ON ACTUALS)

2

-

-

... More
15 PAINT SCHEME ENTIRE ABOVE WATER LINE AREA PAINT SCHEME ARE TO BE RENEWED.FULL PAINT SCHEME AS PER NO 53/16 TO BE APPLIED. (AREA : 50 SQMTR).FOLLOWING PAINT SCHEME USED ON ABOVE WATER AREAS: INTERGARD 269 RED INTERGARD 269 RED INTERLAC 846 INTERLAC 846

50

-

-

... More
16 UNDERWATER HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE SUPER STRUCATURE AREA AS PER ST3 STANDARD. (AREA :200 SQMTR )

200

-

-

... More
17 UNDERWATER HULL SURVEY ENTIRE SUPER STRUCATURE AREA TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA : -200 SQMTR)

200

-

-

... More
18 UNDERWATER HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT SUPER STRUCATURE AREA AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
19 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE SUPER STRUCATURE AREA AS PER NO 53/16.(AREA : 250 SQMTR) FOLLOWING PAINT SCHEME USED ON SUPER STRUCTURE:- INTERGARD 269 INTERGARD 5600 GREY INTERGARD 5600 RED (I) FULL TOP COAT IS TO BE APPLIED ON SUPER STRUCTURE INCLUDING ALL FITTINGS. TOPCOAT - INTHERTHANE 990 WHITE

250

-

-

... More
20 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE WEATHER DECK AREA AS PER ST3 STANDARD. (AREA :-300 SQMTR )

300

-

-

... More
21 HULL SURVEY ENTIRE SUPER STRUCATURE AREA TO BE USG SURVEYED AS PER IRS STANDARD (AREA : -300 SQMTR )

300

-

-

... More
22 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT WEATHER DECK AREA AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
23 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE WEATHER DECK AREA AS PER NO 53/16.(AREA : 300 SQMTR) FOLLOWING PAINT SCHEME USED ON WEATHER DECK:- (TOTAL AREA 300 SQ MTR) INTERGARD 269 INTERSHIELD 300 ALUMINUM INTERSHIELD 852 NON-SKID GREY (FULL TOP COAT IS TO BE APPLIED ON WEATHER DECK AREA)

300

-

-

... More
24 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE BULWARK AREA (FWD & AFT) AS PER ST3 STANDARD. (AREA : -60 SQMTR )

60

-

-

... More
25 HULL SURVEY ENTIRE BULWARK AREA (FWD & AFT) TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY.(AREA :60 SQMTR )

60

-

-

... More
26 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT BULWARK AREA (FWD & AFT) AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
27 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE BULWARK AREA (FWD & AFT) AS PER NO 53/16.(AREA : 60 SQMTR) FOLLOWING PAINT SCHEME USED ON BULWARK :- INTERGARD 269 INTERTUF 262 INTERGARD 263 INTHERTHANE 990 (FULL TOP COAT IS TO BE APPLIED ON BULWARK AREA)

60

-

-

... More
28 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE ENGINE ROOM,MACHINERY AND BILGES AS PER ST3 STANDARD. (AREA : -350 SQMTR )

350

-

-

... More
29 HULL SURVEY ENTIRE ENGINE ROOM, MACHINERY AND BILGES TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :350 SQMTR )

350

-

-

... More
30 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT ENGINE ROOM, MACHINERY AND BILGES AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
31 PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE ENGINE ROOM, MACHINERY AND BILGES AS PER NO 53/16.(AREA : 350 SQMTR) FOLLOWING PAINT SCHEME USED ON MACHINERY AND BILGES :- 1. INTERGARD 269 (RED) 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON MACHINERY AND BILGES)

350

-

-

... More
32 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE FUEL OIL TANKS AS PER ST3 STANDARD. (AREA : 100 SQMTR )

100

-

-

... More
33 HULL SURVEY FUEL OIL TANKS TO BE USG SURVEYED AS PER IRS STANDARD (AREA :100 SQMTR )

100

-

-

... More
34 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE FUEL OIL TANKS AS PER NO 53/16.(AREA : 100 SQMTR) FOLLOWING PAINT SCHEME USED ON FUEL OIL TANKS 1. INTERLINE 850 2. INTERLINE 850 (FULL TOP COAT IS TO BE APPLIED ON FUEL OIL TANKS)

100

-

-

... More
35 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE FRESH WATER TANK (P&S) AS PER ST3 STANDARD. (AREA : 90 SQMTR )

90

-

-

... More
36 HULL SURVEY FRESH WATER TANKS (P&S) TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :90 SQMTR )

90

-

-

... More
37 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE FRESH WATER TANK (P&S) AS PER NO 53/16.(AREA : 90 SQMTR) FOLLOWING PAINT SCHEME USED ON FRESHWATER TANK (P&S) 1. INTERLINE 850 2. INTERLINE 850 (FULL TOP COAT IS TO BE APPLIED ON FRESH WATER TANKS)

90

-

-

... More
38 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE STEERING GEAR COMPARTMENT AS PER ST3 STANDARD. (AREA : 80 SQMTR )

80

-

-

... More
39 HULL SURVEY STEERING GEAR COMPARTMENT TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :80 SQMTR )

80

-

-

... More
40 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT STEERING GEAR COMPARTMENT AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
41 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE STEERING GEAR COMPARTMENT AS PER NO 53/16.(AREA : 80 SQMTR) FOLLOWING PAINT SCHEME USED ON STEERING GEAR COMPARTMENT 1. INTERLINE 850 2. INTERLINE 850 (FULL TOP COAT IS TO BE APPLIED ON STEERING GEAR COMPARTMENT)

80

-

-

... More
42 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE VOID SPACE FWD (P & S) AND AFT (P & S) AS PER ST3 STANDARD. (AREA : 150 SQMTR )

150

-

-

... More
43 HULL SURVEY VOID SPACE FWD(P & S) AND AFT (P & S) TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :150 SQMTR )

150

-

-

... More
44 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT VOID SPACE FWD(P & S) AND AFT (P & S) AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
45 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE VOID SPACE FWD(P & S) AND AFT (P & S) AS PER NO 53/16.(AREA : 150 SQMTR) FOLLOWING PAINT SCHEME USED ON VOID SPACE FWD(P & S) AND AFT (P & S) 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON VOID SPACE)

150

-

-

... More
46 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE STP COMPARTMENT AS PER ST3 STANDARD. (AREA : 40 SQMTR )

40

-

-

... More
47 HULL SURVEY STP COMPARTMENT TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY.(AREA :40 SQMTR )

40

-

-

... More
48 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT STP COMPARTMENT AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
49 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE STP COMPARTMENT AS PER NO 53/16 (AREA : 40 SQMTR) FOLLOWING PAINT SCHEME USED ON STP COMPARTMENT 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON STP COMPARTMENT)

40

-

-

... More
50 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE FORE PEAK TANK AS PER ST3 STANDARD. (AREA : 85 SQMTR )

85

-

-

... More
51 HULL SURVEY FORE PEAK TANK TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY.(AREA :85 SQMTR )

85

-

-

... More
52 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT FORE PEAK TANK AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
53 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE FORE PEAK TANK AS PER NO 53/16.(AREA : 85 SQMTR) FOLLOWING PAINT SCHEME USED ON FORE PEAK TANK 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON FORE PEAK TANK)

85

-

-

... More
54 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE CHAIN LOCKER (P & S) AS PER ST3 STANDARD. (AREA : 80 SQMTR )

80

-

-

... More
55 HULL SURVEY CHAIN LOCKER (P & S) TO BE USG SURVEYED AS PER IRS STANDARD (AREA :80 SQMTR )

80

-

-

... More
56 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT CHAIN LOCKER (P & S) AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
57 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE CHAIN LOCKER (P & S) AS PER NO 53/16.(AREA : 80 SQMTR) FOLLOWING PAINT SCHEME USED ON CHAIN LOCKER (P & S) 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON CHAIN LOCKER (P & S))

80

-

-

... More
58 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA AS PER ST3 STANDARD. (AREA : 150 SQMTR )

150

-

-

... More
59 HULL SURVEY INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA TO BE USG SURVEYED AS PER IRS STANDARD (AREA :150 SQMTR )

150

-

-

... More
60 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREAAS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01TON

1

-

-

... More
61 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA AS PER NO 53/16.(AREA : 150 SQMTR) FOLLOWING PAINT SCHEME USED INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA INTHERTHANE 990 WHITE (FULL TOP COAT IS TO BE APPLIED)

150

-

-

... More
62 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE TRANSOM KEEL AS PER ST3 STANDARD. (AREA : -10 SQMTR )

10

-

-

... More
63 HULL SURVEY ENTIRE TRANSOM KEELTO BE USG SURVEYED AS PER IRS STANDARD (AREA :10 SQMTR )

10

-

-

... More
64 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT TRANSOM KEEL AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
65 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE TRANSOM KEEL AS PER NO 53/16.(AREA : 10 SQMTR) FOLLOWING PAINT SCHEME USED ON TRANSOM KEEL :- INTERGARD 269 INTERTUF 262 INTERGARD 263 INTHERTHANE 990 (FULL TOP COAT IS TO BE APPLIED ON TRANSOM KEEL)

10

-

-

... More
66 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE MAIN MAST AND FITTINGS AS PER ST3 STANDARD. (AREA : -15 SQMTR )

15

-

-

... More
67 HULL SURVEY ENTIRE MAIN MAST AND FITTINGSTO BE USG SURVEYED AS PER IRS STANDARD (AREA :15 SQMTR )

15

-

-

... More
68 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT MAIN MAST AND FITTINGSAS PER HULL SURVEY REPORT.MAX OF 0.5 T STEEL (PAYMENT ON ACTUALS) QTY- 0.5 TON

0.5

-

-

... More
69 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE MAIN MAST AND FITTINGSL AS PER NO 53/16.(AREA : 15 SQMTR)

15

-

-

... More
70 MISCELLANEOUS U/W STRUCTURE EXAMINE REMOVE, CLEAN, PAINT AND REFIT THE EDDY PLATE AND ROPE GUARD.

1

-

-

... More
71 RUDDER EXAMINE UNDERWATER STRUCTURE IN ACCORDANCE WITH NO 19/06, PAYING PARTICULAR ATTENTION TO HULL PLATING IN THE VICINITY OF RUDDER(S), FITTING UPTO THE RUDDER HEAD, FOR SIGNS OF CORROSION, DEFECTS AND DAMAGE. EXAMINE RUDDER PINTLE BEARINGS TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING.

1

-

-

... More
72 U/W INLETS CARRY OUT THE VISUAL SURVEY OF INLETS AND DISCHARGES. CLEAN AND EXAMINE GRATINGS OF INLETS AND DISCHARGES. EXAMINE PLATING AND COATING OF INLETS AND DISCHARGES AND AREAS ADJACENT TO THEM.

1

-

-

... More
73 SEA TUBES CARRY OUT 100 % VISUAL SURVEY AND USG SURVEY OF 02 IN NO. SEA TUBES. CLEAN AND EXAMINE. REPAIR / RENEW AS NECESSARY. AIR PRESSURE TEST OF REPAIRED SEA TUBES TO BE CARRIED OUT.

2

-

-

... More
74 SACRIFICIAL ANODES INSPECT SACRIFICIAL ANODES FITTED TO UNDERWATER HULL, RUDDERS,ROPE GAURD, SHAFT TUNNEL, STERN TUBES, INLETS AND OUTLETS, SEA TUBES, BILGES AND COFFER DAMS. RENEW THOSE CONSUMED 50% OR MORE. (ENSURE SACRIFICIAL ANODES ARE NOT PAINTED. ANY PAINT OR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFORE UNDOCKING.) DETAILS OF FITTED SACRIFICIAL ANODE IS AS FOLLOWS:- 1) HULL – 14 NOS (MK I, DS CAT NO. 9530000524) 2) STERN – 12 NOS (MK VI – 3 ON EACH SIDE, DS CAT NO. 9530000528) 3) RUDDER – 04 NOS (MK VI – 01 ON EACH SIDE, DS CAT NO. 9530000528) 4) SEACHEST – 08 NOS (MK V – 02 NOS. PER SEACHEST, DS CAT NO. 9530000528) ANODES ARE TO BE SUPPLIED BY THE FIRM

38

-

-

... More
75 TESTING OF WATER TIGHT COMPARTMENT ALL TANKS, COFFERDAMS AND SEA TUBES WHICH ARE REPAIRED BY BUILD UP/RENEWAL OR ARE SUBJECTED TO HOT WORK FOR WELDING OF PAD PIECE/ FOUNDATION ON ANY OF THEIR BOUNDARIES ARE TO BE AIR PRESSURE TESTED. THE PRESSURE APPLIED SHOULD NEVER EXCEED THAT WHICH CORRESPONDS TO A PRESSURE OF 0.2 KG/SQ CM (2 METERS OF WATER OR 0.20 BARS OR 2.1/2 IBF/ SQ IN).

1

-

-

... More
76 HULL SURVEY STEEL SHIP CARRY OUT CHIPPING, SURVEY, INSPECTION AND RENEWAL OF BOLLARDS,FAIRLEADS , DECK FITTING, MACHINERY FOUNDATIONS, TANKS FOUNDATION ,DECK EYE , MISC FITTINGS AND THE HULL STRUCTURE INCLUDING STIFFENING MEMBERS IN THE VICINITY WITH NON-DESTRUCTIVE TECHNIQUES, IF REQUIRED AND INCLUDE IN THE SURVEY REPORT. RENEW FITTINGS AS PER SURVEY REPORT. MAT-M.S .MAX OF 3 T STEEL (PAYMENT ON ACTUALS)

3

-

-

... More
77 ANCHOR CHAIN CABLE (I) A QULIFIED BLACK SMITH TO BE EMPLOYED FOR REMOVAL AND DISMANTLING OFANCHOR AND CHAIN CABLE IN ACCORDANCE WITH NO 07/2011. PROPER SIZE TOP SWAGE TO BE USED FOR DISMANTLING OF ALL SHACKLE PINS (II) ENTIRE CHAIN CABLE TO BE RANGED GRIT BLASTING / MECHANICAL WIRE BRUSHING/HYDOJET BLASTING OF ENTIRE CHAIN CABLE AND ANCHOR WITH ACCESSORIES TO BE CARRYOUT. (III) ANCHOR AND ASSOCIATED ANCHOR CHAIN CABLE TO BE SURVEYED. (IV) POST SURVEY ANCHOR AND CHAIN CABLE WITH ACCESSORIES ARE TO BE PAINTED WITH BLACK BITUMENUS ANTI CORROSION PAINT IAW NCD 3909 (V). POST SURVEY MENTIONED BELOW ALL ACCESSORISE TO BE ASSEMBLED TOGETHER AND FITTED BACK. (VI) ANCHORING AND WEIGH ANCHORING TRIALS TO BE COMPLETED AND SYSTEM TO BE PROVED. ANCHOR CHAIN CABLE DETAILS AS FOLLOWS: 1) CHAIN DIA- 14 MM 2) CHAIN LENGTH - 225 RMTR ANCHOR SHACKLE - 02, FULL SHACKLE - 08 KENTER SHACKLE - 10 D. SHACKLE - 02 SWIVEL PIECE - 04 02 IN BLAKE SLIPS 02 IN NO ANCHOR STROPS 02 IN NO BOTTLE SCREW SLIPS ANCHOR - 02

1

-

-

... More
78 ANCHOR WINDLASS OVERHAULING OF ANCHOR WINDLASS (P&S)-QTY-02 FOLLOWING DEFECTS OF ANCHOR WINDLASS TO BE RECTIFIED. (A) CHIPPING/SURVEY AND RENEWAL OF ANCHOR WINLASS FOUNDATION & FITTINGS TO BE CARRIED OUT AS PER SURVEY REPORT. (B) BRAKE LINER TO BE RENEWED (PORT / STBD). (C) ANCHOR WINDLASS GULLETINE ARRANGEMENT PORT/ STBD JAMMED. OVERHAULING / SERVICING TO BE CARRIED OUT. (D) 10 NOS GREASE NIPPLES OF WINDLASS DECK MACHINERY TO BE RENEWED. HIGH PRESSURE GREASE FILLING ON ALL GREASE NIPPLES TO BE CARRIED OUT POST. (E) GEAR BOX OIL TO BE CHANGED. TOTAL QTY- 50 LTR (F) OVERHAULING OF WINDLASS GEAR BOX & FITTINGS -QTY 02

1

-

-

... More
79 SEWAGE TREATMENT PLANT SEWAGE TREATMENT PLANT (EVAC SEWAGE TREATMENT PLANT, MODEL-ORCA II A 36):- OVERHAULING OF ENTIRE SYSTEM TO BE CARRIED OUT. PROVE FOR SATISFACTORY OPERATION.

1

-

-

... More
80 SINGLE ARM BOAT DAVIT OVERHAULING OF SINGLE ARM BOAT DAVIT- QTY-01 ,FOLLOWING DEFECTS OBSERVED IN BOAT DAVIT. (A) CHIPPING/SURVEY AND RENEWAL OF BOAT DAVIT FOUNDATION & FITTINGS TO BE CARRIED OUT AS PER SURVEY REPORT. (B) ABNORMAL SOUND OBSERVED, HARD TO OPERATE. ENGAGE CLUTCH LEVER JAMMED.OVERHAULING CARRIED OUT AND PROVE FOR SATIFACTORY OPERATIONS. (C) SURVEY OF WIRE ROPE TO BE CARRIED OUT IT FOUND UNSERVICABLE TO BE REPLACED. (D) CHANGE THE GEAR BOX LUB OIL. QTY – 10 LTR, VISCOSITY RANGE – REDWOOD NO. 1 AT 140 F 300-400 (E) LOAD TEST OF DAVIT TO BE CARRIED OUT.LOAD TEST CERTIFIACTE ISSUED. SAFE WORKING LOAD 01 TON. (F) 02 IN NO POLYSTER SLING FOR LIFTING OF GEMINI TO BE PROVIDED FOR PORT THE DAVIT. (G) 02 HANDLE FOR MANUAL OPERATION FOR DAVIT CORRODED/BROKEN, TO BE MANUFACTURED AS PER SAMPLE. .

1

-

-

... More
81 WT HATCH OVERHAULING OF 04 IN NOS WT HATCH: FOLLOWING DEFECTS OBERVED IN WT HATCH: - (A) CHIPPING/SURVEY AND RENEWAL OF WT HATCH COVER ,COAMING ,DOOR HANDLES, AND STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT. (B) 04 IN NO WT HATCH ON WEATHER DECK RUBBER BEADING CRACKED. RUBBER BEADING IS TO BE REPLACED AND CHALK TEST IS TO BE CARRIED OUT. (C) HANDLES ARE HARD TO OPERATE. TO BE MADE EASED.

4

-

-

... More
82 WT DOOR FOLLOWING DEFECTS OBSERVED IN WT DOOR: -QTY-22 (A) CHIPPING/SURVEY AND RENEWAL OF WT DOOR ,COAMING ,DOOR HANDLES,RUBBER BEADING AND STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT (B) WT DOOR CLIPS HARD TO OPERATE,TO BE MADE EASED. (C) RUBBER BEADING CRACKED. RUBBER BEADING TO BE RENEWED. CHALK TEST IS TO BE CARRIED OUT.

22

-

-

... More
83 NWT DOOR REPAIR/RENEWAL OF DAMAGED NWT WOODEN DOOR IS TO BE CARRIED OUT. ALL THE DAMAGE ACCESSORIES TO BE RENEWED (HINGE UPROOTED- 50, DOOR CLOUSER HYDRALIC- 08 ,MORTARISE LOCK /DOOR LOCK- 08, DOOR BEADING- 60 RMT.MAT-AL/ WOOD

14

-

-

... More
84 FOOT STEP REPAIR/RENEWAL OF C/T/H ENTRANCE DOOR FOOT STEP TO BE CARRIED OUT. QTY-44. MAT-MS

44

-

-

... More
85 BREATHER PIPE/ AIR BREATHER REPAIR/RENEWAL OF C/T/H BREATHER PIPE/VENTILATION PIPE ON WEATHER DECK (FOXLE) TO BE CARRIED OUT. JOB INVOLVE BREATHER TO BE MANUFACTURED AS PER SAMPLE,RENEW FLANGES AND WIRE MESH . QTY-06, MAT-MS

6

-

-

... More
86 TYRE FENDER RENEWAL OF DAMGED/BROKEN TYRE FENDER ON SHIP SIDE TO BE CARRIED OUT. QTY TYRE FENDER-40. MAT-RUBBER

40

-

-

... More
87 TYRE FENDER CHAIN REPAIR/RENEWAL OF DAMGED/BROKEN TYRE FENDER CHAIN ON SHIP SIDE TO BE CARRIED OUT. LENGTH- CHAIN-80 RMT. MAT-GI CHAIN

80

-

-

... More
88 TYRE FENDER EYE RENEWAL OF DAMGED/BROKEN TYRE FENDER EYE AND COLLAR ON SHIP SIDE TO BE CARRIED OUT. EYE-80 NOS. MAT-MS EYE/ COLLAR

80

-

-

... More
89 FIRE HOSE BOX REPAIR/RENEWAL OF BROKEN FIRE HOSE BOX TO BE CARRIED OUT. QTY-4 NOS

4

-

-

... More
90 CLEATS MANUFACTURING OF 8 IN NOS CLEATS (04 EACH SIDE) FOR ROPE HANDLING ARE TO BE WELDED ON BULWARK FOR ROPE HANDLING. MAT MS

8

-

-

... More
91 GUARDRAIL RENEWAL OF DAMAGE GUARDRAIL ON WEATHER DECK TO BE CARRIED OUT. LENGTH-150 RMT, MAT-GI.

150

-

-

... More
92 GUARDRAIL REAPIR/RENEWAL OF DAMAGE GUARDRAIL SUPPORTING FRAME ON WEATHER DECK TO BE CARRIED OUT.QTY-30

30

-

-

... More
93 WINDLASS CONTROL PANEL POST CHIPPING, SURVEY AND RENEWAL OF WINDLASS CONTROL PANEL POST/ STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT.MAT-MS , QTY-2

2

-

-

... More
94 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF HAND OPERTED PUMP STRUCTURE AND FITTINGS ON FOXLE TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS , QTY-2

2

-

-

... More
95 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF TWIN BOLLARD (SMALL) ON WEATHER TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS/MS PIPE , QTY-6

6

-

-

... More
96 METALLIC SWITCH BOX RENEWAL OF METALLIC SWITCH BOX ON WEATHER DECK (FOXLE) TO BE CARRIED OUT. MAT-MS, QTY-01

1

-

-

... More
97 SHIP SIDE FIXED FENDER RENEWAL OF SHIP SIDE RUBBER FENDER INCLUDING MS FRAME TO BE CARRIED OUT. LENGTH- 80 RMT, MAT-RUBBER (AS PER SAMPLE)

80

-

-

... More
98 SHIP SIDE FIXED FENDER SECURING BRACKET RENEWAL OF SHIP SIDE RUBBER FENDER SECURING BRACKET/FRAME TO BE CARRIED OUT. LENGTH- 160 RMT, MAT-MS, SIZE-6 MM

160

-

-

... More
99 VENTILATION FLAPS CHIPPING, SURVEY AND RENEWAL OF VETNILATION FLAPS ON WEATHER DECK (PORT) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE FLAP COVER, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-02, MAT-MS/ RUBBER BEADING

2

-

-

... More
100 VENTILATION/ BREATHER PIPE REPAIR/RENEWAL OF C/T/H VENTILATION PIPE/ BREATHER PIPE ON WEATHER DECK (P&S) TO BE CARRIED OUT. JOB INVOLVE MISSING BREATHER TO BE MANUFACTURE AS PER SAMPLE,RENEW FLANGES AND WIRE MESH . QTY-14, MAT-MS

14

-

-

... More
101 MANHOLE COVER CHIPPING,SURVEY AND RENEWAL OF C/T/H MANHOLE COVER,RUBBER PACKING & HANDLES TO BE CARRIED OUT OF ALL MISC TANKS.(QTY.16). ALL NUT & BOLTS TO BE REPLACED.

16

-

-

... More
102 GANGWAY CHAIN RENEWAL OF THINNED/CORRODED GI CHAIN (GANGWAY) (P&S) ON WEATHER DECK TO BE CARRIED OUT. MAT-GI, LENGTH- 12 RMT.

12

-

-

... More
103 VENTILATION FLAPS (SMALL) CHIPPING, SURVEY AND RENEWAL OF VETNILATION FLAPS ON WEATHER DECK (P) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-12, MAT-MS/ RUBBER BEADING

12

-

-

... More
104 PVC PIPE RENEWAL OF DAMAGE/BROKEN SHIP SIDE PVC DRAIN PIPE WITH FITTINGS ACCESSIORIES TO BE CARRIED OUT. QTY-02 (P&S) LENGTH- 12 RMT

12

-

-

... More
105 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF BULLRING, STRUCTURE AND FITTINGS ON AFT TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS, QTY-2

2

-

-

... More
106 SHORE SUPPLY BOX METALLIC RENEWAL OF CORRODED/THINNED SHORE SUPPLY METALLIC BOX ON AFT (WEATHER DECK) TO BE CARRIED OUT. MAT-MS, QTY-02.

2

-

-

... More
107 DRAINAGE PIPE RENEWAL OF CORRODED/THINNED DRINE LINE ON WEATHER DECK (GALLEY TO SEA) TO BE CARRIED OUT. MAT-GI. PIPE, RMT- 05

5

-

-

... More
108 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF BOLLARDS (SMALL) ON WEATEHR DECK AFT TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS/MS PIPE , QTY-2

2

-

-

... More
109 FIRE HOSE BOX RENEWAL OF BROKEN FIRE HOSE BOX TO BE CARRIED OUT. MAT. MS / FIBER ,QTY-2 NOS

2

-

-

... More
110 CABLE TRAY RENEWAL OF C/T/H CABLE TRAY TO BE CARRIED OUT. LENGTH- 50 RMT

50

-

-

... More
111 U TYPE VENTILATION SYSTEM CHIPPING, SURVEY AND RENEWAL OF VETNILATION STRUCTURE ON SHIP SIDE (P&S) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF WIRE MESH AND CLEANING OF VENTILATION DUCT.QTY- 02, MAT-MS.

2

-

-

... More
112 SECURING BRACKET REPAIR/RENEWAL OF C/T/H FIRE MAIN LINE/FRESH WATER/SEA WATER PIPE LINE U CLAMPS/ SECURING BRACKET TO BE CARRIED OUT. MAT-MS, QTY- 40 NOS.

40

-

-

... More
113 VENTILATION FLAPS CHIPPING, SURVEY AND RENEWAL OF VETNILATION FLAPS ON WHEEL HOUSE DECK (FUNNEL) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-1, MAT-MS/ RUBBER BEADING

1

-

-

... More
114 VENTILATION SYSTEM (BIG) CHIPPING, SURVEY AND RENEWAL OF VETNILATION SYSTEM ON WHEEL HOUSE DECK TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE VENTILATION, FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-3, MAT-MS/ RUBBER BEADING

1

-

-

... More
115 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF A/C FOUNDATION ON WHEEL HOUSE DECK TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS, QTY-2

2

-

-

... More
116 U TYPE VENTILATION PIPE CHIPPING, SURVEY AND RENEWAL OF VETNILATION PIPE ON WHEEL HOUSE DECK (P&S) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS,RUBBER BEADING AND CLEANING OF VENTILATION DUCT.QTY- 02, MAT-MS.

2

-

-

... More
117 PVC COATED STEEL WIRE ROPE GUARDRAIL (I) RENEWAL OF DAMAGED/BROKEN PVC COATED WIRE ROPE GUARD RAIL. TOATL NO 04, EACH LENGTH OF 02 MTR. SS BOTTLE SCREW SLIP- 04, SS U LIPS- 08, SS D-SHACKLE- 08 (II) RENEWAL OF DAMAGED PVC COATED WIRE ROPE GUARD RAIL. TOATL NO 06, EACH LENGTH OF 02 MTR. BOTTLE SCREW SLIP- 06, U LIPS- 12, D-SHACKLE- 12, MAT- SS.

1

-

-

... More
118 G.I CHAIN RENEWAL OF THINNED/CORRODED GI CHAIN (GANGWAY) (P&S) ON WHELL HOUSEK TO BE CARRIED OUT. MAT-GI, LENGTH- 20 RMT.

20

-

-

... More
119 WHEEL HOUSE WINDOW GLASS CLEANING,SURVEY OF 16 IN NOS WINDOW GLASS TO BE CARRIED OUT.JOB INVOLVE RENEWAL OF RUBBER BEADING, 04 NOS GLASS TO BE RENEWED AS PER EXISTING FITMENT

16

-

-

... More
120 NAME BOARD FC URVASHI NAME BOARD ON WHEEL HOUSE BROKEN/PERISHED TO BE REPAIRED/RENEWED. QTY- 02. MAT- MS.

2

-

-

... More
121 GUARDRAIL RENEWAL OF DAMAGE GUARDRAIL ON WHEEL HOUSE DECK TO BE CARRIED OUT. LENGTH-30 RMT, MAT-GI.

30

-

-

... More
122 GANGWAY/BROW REPAIR/RENEWAL OF BROKEN/DAMAGED GANGWAY/BROW TO BE CARRIED OUT. LOAD TEST TO BE CARRIED OUT. LOAD TEST CERTIFICATE TO BE ISSUED. -QTY01, LENGTH- 4 MTRS MAT-AL

1

-

-

... More
123 FRESH WATER AND SEA WATER SYSTEM RENEWAL OF CORRODED/THINNED PIPE LINE (FW & SEA WATER) THROUGH OUT THE CRAFT TO BE CARRIED OUT. MAT- CU-NI, LENGTH- 30 RMT. DIA OF FW LINE- 35 MM , DIA OF SEA WATERV LINE - 65 MM

30

-

-

... More
124 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF LIFERAFT FOUNDATION AND STRUCTURE ON WHELL HOUSE DECK TO BE CARRIED OUT AS PER SURVEY REPORT.MAT-MS , QTY-6

6

-

-

... More
125 HYDROSTATIC RELEASE GEAR HRG ( LIFERAFT) RENEWAL AND FITMENT OF HRG FOR LIFE RAFT TO BE CARRIED OUT. QTY-06. CERTIFICATE TO BE PROVIDED.

6

-

-

... More
126 LADDERS CHIPPING, SURVEY AND RENEWAL OF ON WEATHER DECK TO 01 DECK AND 01 DECK TO WHEEL HOUSE TOP SLOPPING LADDES TO BE CARRIED OUT INCLUDING FOOT STEPS,HANDRAILS AND SIDE PLATE.MS.

1

-

-

... More
127 LIFEBOUY BASE CHIPPING, SURVEY AND RENEWAL OF LIFEBOUY BASE/ SECURING ARRANGEMENT ON WHEEL HOUSE BRIDGE TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-02

2

-

-

... More
128 A/C FOUNDATION CHIPPING, SURVEY AND RENEWAL OF A/C FOUNDATION BASE & FITTINGS ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-03

3

-

-

... More
129 SEARCH LIGHT STRUCTURE CHIPPING, SURVEY AND RENEWAL OF SEARCH LIGHT STRUCTURE ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-02

2

-

-

... More
130 SINTEX (OVERHEAD TANKS) RENEWAL OF DAMAGE SINTEX ON WHEEL HOUSE TOP TO BE CARRIED OUT. CAPACITY- 500 LTRS, QTY-02

2

-

-

... More
131 TANKS FOUNDATION AND STRUCTURE CHIPPING, SURVEY AND RENEWAL OF TANKS FOUNDATION AND STRUCTURE ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-02

2

-

-

... More
132 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF ANTENNA BASE AND STRUCTURE FOUNDATIONS OF ANTENNA , LIGHTS, AC , WATER TANKS ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-03

3

-

-

... More
133 GUARDRAIL RENEWAL OF DAMAGED GUARDRAIL ON WHEEL HOUSE TOP TO BE CARRIED OUT. LENGTH-30 RMT, MAT-GI.

30

-

-

... More
134 STEEL WIRE ROPE RENEWAL OF CORRODED/THINNED RIGGING WIRE ROPE ON MAST TO BE CARRIED OUT. LENGTH- 07 MTRS, QTY-03 THICKNESS- 04 MM

3

-

-

... More
135 NAME BOARD NAME BOARD OF FC URVASHI TO BE RENEWED AND FITTED ON MAST.QTY-01

1

-

-

... More
136 MODULAR SHED ON WHEEL HOUSE DECK RENEWAL OF MODULAR SHED AS PER EXISTING FITTINGS. MAT-AL/ SS SHEET & RAINFORCE SHEET

1

-

-

... More
137 PASSANGER CHAIR STITCHING OF CHAIR COVERS TO BE CARRIED OUT AS PER SAMPLE AND CLOTHES .

50

-

-

... More
138 GALLEY TRUNKING CHEMICAL CLEANING OF GALLEY TRUNKING LINE, END WIRE MESH AND FILTER TO BE CARRIED OUT. LENGTH - 15 RMT.

15

-

-

... More
139 WT HATCH OVERHAULING OF 03 IN NOS WT HATCH ON INTERNAL COMPARTMENT: FOLLOWING DEFECTS OBERVED IN WT HATCH: - (A) CHIPPING/SURVEY AND RENEWAL OF WT HATCH COVER ,COAMING ,DOOR HANDLES, AND STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT. (B) 03 IN NO WT HATCH ON INTERNAL COMPARTMENT RUBBER BEADING CRACKED. RUBBER BEADING IS TO BE REPLACED AND CHALK TEST IS TO BE CARRIED OUT. (C) HANDLES ARE HARD TO OPERATE. TO BE MADE EASED.

3

-

-

... More
140 ENGINE ROOM MISC FOUNDATION SURVEY AND RENEWAL OF C/T/H MAIN ENGINE ROOM MISC FOUNDATION TO BE CARRIED OUT AS PER SURVEY REPORT.QTY-08, MAT-MS

8

-

-

... More
141 ENGINE ROOM MISC FITTINGS SURVEY AND RENEWAL OF C/T/H MAIN ENGINE ROOM MISC FRAMES/BRACKET/STIFFENERS TO BE CARRIED OUT AS PER SURVEY REPORT.QTY-30, MAT-MS

30

-

-

... More
142 LOCKER RENEWAL OF DAMAGED WOODEN LOCKER WITH LOCKING ARRAGEMENT ON CABINS & WHEEL HOUSE.QTY-10 NOS

10

-

-

... More
143 SANITARY SYSTEM SANITARY SYSTEM: (DINNING ROOM,CREW MESS ROOM & CREW WC) RENEWAL OF WASH BASIN FLEXIBLE HOSE AND FITTINGS. LENGTH- 01 MTRS-QTY-05

5

-

-

... More
144 SANITARY SYSTEM SANITARY SYSTEM: (|DINNING ROOM-02,GALLEY-02 , CREW MESS -02 & CREW WC-6) RENEWAL OF NON OPS COMMERCAIL WATER TAP. MAT-SS, QTY-12

12

-

-

... More
145 SANITARY SYSTEM SANITARY SYSTEM (DINNING ROOM & CREW MESS ROOM ) DRAIN LINE OF WASH BASIN TO BE CLEARED AND CHEMICAL CLEANED. LENGTH- 10 RMT

10

-

-

... More
146 SANITARY SYSTEM SANITARY SYSTEM (CREW MESS ROOM): RENEWAL OF DAMAGE/BROKEN DINNING TABLE TO BE CARRIED OUT AS PER SAMPLE-QTY-01, MAT- WOOD/SUNMICA

1

-

-

... More
147 SANITARY SYSTEM SANITARY SYSTEM (CREW MESS ROOM -01 & CREW WC-04) : RENEWAL OF DECK DRAIN STAINER. QTY-05, MAT-SS

5

-

-

... More
148 SANITARY SYSTEM GALLEY: RENEWAL OF SS SINK (WASH BASIN) FLEXIBLE HOSE AND FITTINGSTO BE CARRIED OUT . LENGTH- 02 MTRS-QTY-01

1

-

-

... More
149 SANITARY SYSTEM GALLEY: RENEWAL OF DRAIN LINE OF WASH BASIN TO BE CARRIED OUT. LENGTH- 06 RMT

6

-

-

... More
150 SANITARY SYSTEM CREW WC: RENEWAL OF DAMAGE/BROKEN FIBER DOUBLE DOOR (WATER PROOF)& FITTINGS AS PER SAMPE. QTY-04 (EACH 2)

4

-

-

... More
151 SANITARY SYSTEM CREW WC: RENEWAL OF DAMAGE/BROKEN WESTERN COMMODE & FLUSHING BOX .QTY-02

2

-

-

... More
152 SANITARY SYSTEM CREW WC:REPAIR/RENEWAL OF C/T/H DRAIN LINE OF WC. LENGTH-10 RMT. MAT-GI

10

-

-

... More
153 SANITARY SYSTEM CREW WC: 02 SHOWER FITTING PIPELINE IN CREW TOILET CORRODED/ DAMAGED TO BE RENEWED.LENGTH- 10 RMT MAT- CU(PIPELINE),

10

-

-

... More
154 SANITARY SYSTEM CREW WC: RENEWAL OF NON OPS COMMERCIAL SHOWER AS PER EXISTING FITTNGS,QTY-02. MAT-SS.

2

-

-

... More
155 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF DAMAGE/BROKEN FIBER DOUBLE DOOR (WATER PROOF) & FITTINGS AS PER SAMPE. QTY-04 (EACH 2)

4

-

-

... More
156 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF DAMAGE/BROKEN WESTERN COMMODE & FLUSHING BOX .QTY-04

4

-

-

... More
157 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: REPAIR/RENEWAL OF C/T/H DRAIN LINE OF WC. LENGTH-30 RMT. MAT-GI

30

-

-

... More
158 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF WASH BASIN FLEXIBLE HOSE AND FITTINGS. LENGTH- 03 MTRS-QTY-03

3

-

-

... More
159 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF NON OPS COMMERCAIL WATER TAP. MAT-SS, QTY-12

12

-

-

... More
160 SANITARY SYSTEM 02 IN NOS SHOWER FITTINGS PIPELINE IN ED& MASTER TOILET CORRODED/ DAMAGED TO BE RENEWED.LENGTH- 20 RMT MAT- CU(PIPELINE)

20

-

-

... More
161 SANITARY SYSTEM RENEWAL OF NON OPS COMMERCIAL SHOWER IN ED& MASTER TOILET AS PER EXISTING FITTNGS,QTY-02. MAT-SS.

2

-

-

... More
162 SANITARY SYSTEM DECK DRAIN STAINER OF ED & MASTER CABIN WC'S CORRODED/ BROKEN TO BE RENEWED. MAT- BRASS

4

-

-

... More
163 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF WET COMPARTMENT FOUNDATION AND FITTINGS TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY- 20

20

-

-

... More
164 METALLIC LOCKER RENEWAL/ REPAIR OF DAMAGED MESS METALLIC LOCKER WITH LOCKING ARRAGEMENT IN CREW CABIN TO BE CARRIED OUT.QTY-8 NOS

8

-

-

... More
165 DRAINAGE SYSTEM 02 IN NO DECK DRAINS ON 01 & 02 DECKS CORRODED/ THINED. MANUFACTURING AND FITMENT OF NEW DRAIN PIPES AS PER EXISTING FIT AND FITMENT OF THE SAME INSITU.QTY-02 ,MAT-GI, LENGTH- 4 MTS (EACH)

2

-

-

... More
166 STENCILING STENCILING TO BE DONE ON ALL THE AIR VENTS, HATCHWAYS, MANHOLE COVERS,WT DOORS,EXHAUST , ENTRY, EXIT, DECK FITTINGS ETC.

60

-

-

... More
167 HULL SURVEY SERVICEABILITY CHECKS, SURVEY AND RENEWAL OF PORT HOLES TO BE CARRIED OUT AS PER SURVEY REPORT.PORT HOLE-GLASS THK- 10 MM, DIA- 250 MM, QTY-12 NOS.

12

-

-

... More
168 CHEQUER PLATE & NUTS REPAIR/RENEWAL OF C/T/H CHEQUER PLATE WITH SS NUT FOR SECURING OF ENGINE ROOM & MACHINERY COMPARTMENT TO BE CARRIED OUT. CHEQUER PLATE AREA- 15 SQ MTRS & QTY- 150 SS NUTS

15

-

-

... More
169 LOAD TESTING LOAD TESTING TO BE CARRIED OUT OF ALL DECK FITTINGS ON UPPERDECK(INCLUDING BOLLARDS,FAIRLEAD,EYE,LIFTING APPLIANCES) CERTIFCATES TO BE ISSUED.

12

-

-

... More
170 PANNELING DEGUTTING AND REGUTTING OF PANNELING TO BE CARRIED OUT AT DIFFECTIVE AREA. (AREA-50SQM)

50

-

-

... More
171 LAGGING LAGGING TO BE CARRIED OUT AT DIFFECTIVE AREA THROUGH OUT THE CRAFT. (AREA-50 SQM)

50

-

-

... More
172 GAS FREE OF TANKS FOLLOWING TANKS & COMPARTMENT ARE TO BE VENTILATED. GAS FREE/ MAN ENTRY/ SAFE TO WELD CERTIFICATE TO BE OBTAINED BY THE FIRM. CLEANING OF THE TANKS TANKS & COMPARTMEN ARE TO CARRIED OUT THOROUGHLY FOR SURVEY BY IRS. A) FRESH WATER TANK (P&S) B) FUEL OIL TANK (P&S) C) FO READY USE TANK (P&S) D) FOREPEAK TANK E) VOID SPACE (FWD & AFT) F) STEERING COMPARTMENT (P&S) G) STP COMPARTMENT H) CHAIN LOCKER (P &S)

14

-

-

... More
173 DECK COVERING FULL SCHEME DECK COVERING TO BE CARRIED OUT IN WHEEL HOUSE, LOBBY, CABINS ,GALLEY ,MESS,LIVING SPACE,WET COMPARTEMENT AND PASSENGER HALL. AREA – 200 MTR2

200

-

-

... More
174 AQUAGUARD PURIFIER INSTALATION OF 01 IN NO AQUAGUARD PURIFIER & LINE FITTNGS TO BE CARRIED OUT IN DINNING ROOM.QTY-01

1

-

-

... More
175 WATER COOLER 01 IN NO WATER COOLER (BULE STAR) NON OPS TO BE RENEWED

1

-

-

... More
176 BUNK MATTRESS BUNK MATTRESS DAMAGED/TORN TO BE RENEWED. MAKE - SLEEPWELL. SIZE - 3X6 FEET

13

-

-

... More
177 FIRST AID BOX REPLACEMENT OF FIRST AID BOX ON WHEEL HOUSE TO BE CARRIED OUT. QTY-01

1

-

-

... More
178 CHAIR REPLACEMENT/RENEWAL OF 15 IN NOS CHAIR FOR WHEEL HOUSE & GALLEY TO BE CARRIED OUT AS PER SAMPLE . QTY-15 NOS

15

-

-

... More
179 HULL SURVEY SURVEY/RENEWAL OF C/T/H DADO AREA OF LOBBY,DINNING ROOM, GALLEY ,CREW ACCOMODATION AND WC TO BE CARRIED OUT.AREA-30 SQ MTRS MAT- MS

30

-

-

... More
180 PANNELING RENEWAL OF PANNELING ON WHEEL HOUSE WITH WOODEN FINISHING IS TO BE CARRIED OUT. MAT-PLY WOOD 6MM AND TOP SUNMICA.AREA-50 SQ MTRS

50

-

-

... More
181 MISCELLANEOUS FIRE EXTINGUISHER (FOAM, WATER, DCP,AFFF) BRACKET OF FOLLOWING PLACES DAMAGED / BROKEN TO BE RENEWED AND WELDED INSITU AS PER SAMPLE.QTY-08 MAT- MS. (A) BRIDGE (B) GALLEY (C) LOBBY (D) ACCOMMODATION SPACE ,ETC.

8

-

-

... More
182 LIFE RAFT RENEWAL OF SECURING STRAPS OF LIFE RAFT TO BE CARRIED OUT. MAT- POLYSTER

12

-

-

... More
183 MAN OVERBOARD MARKER RENEWAL OF MAN OVERBOARD MARKER ON WHEELHOUSE DECK.QTY-02

2

-

-

... More
184 ANCHOR HOUSE PIPE BOTH THE ANCHORS STUCK IN HOUSE PIPE WHILE CARRYING OUT OPERATION AND TRAILS, SLOPE OF BOTH HOUSE PIPE TO BE INCREASE FOR SMOTH OPERATION OF BOTH THE ANCHORS DURING ANCHORING. FOLLOWING WORKS INVOLVES:- (A) DUGETTING OF EXISTING HOUSE PIPE BRACKETS.(B) SLOPE OF HOUSE PIPES TO BE INCREASED. (C) NECESSORY STRENGTHNING AND SUPPORTING BRACKETS AND STRUCTURE OF BOTH HOUSE PIPE TO BE CARRIED OUT.(E) POST COMPLETION OF WORK TRAILS TO BE UNDERTAKEN FOR SMOTH OPERATION OF ANCHORS.

2

-

-

... More
185 EMERGENCY DA FOUNDATIN RENEWAL OF EMERGENCY DA FOUNDATION AND DECK PLATE TO BE CARRIED OUT AS PER SAMPLE DOMENSION

1

-

-

... More
ENGINEERING

-

-

-

... More
1 02 IN NOS MAIN ENGINES MAKE- CUMMINS INDIA MODEL KTA-38-M1 (OEM CERTIFICATION REQUIRED) 12000 HRLY CHANGE AIR CLEANER ELEMENT (06NOS). CHANGE ENGINE OIL (400 LTRS). CHANGE ENGINE FUEL FLOW FILTER (06 NOS). FUEL HOSES OF BOTH MAIN ENGINE TO BE RENEWED (10 NOS). CHANGE BY PASS FILTER (08 NOS) CHANGE MARINE GEAR OIL (50 NOS). RECTEFIED THROTTLE LINKAGE, ADJUST AS REQUIRED (02 NOS) CHANGE MARINE GEAR OILRECTEFIED THROTTLE LINKAGE, ADJUST AS REQUIRED (50 NOS) CHANGE FUEL FILTER (02 NOS). RENEW AIR PIPING (06 NOS). CHANGE CRANKCASE BREATHER (05 NOS) REPLACE HEAT EXCHANGER ZINC PLUGS (10 NOS). REPLACE BELTS. CARRY OUT INSPECTION OF ENGINE VALVE ROTATORS (01 NOS). CLEAN FUEL TANK FROM INSIDE (04 NOS). CHECK IDLER AND WATER PUMP IDLER (04 NOS) CLEAN AND CALIBRATE INJECTORS AND ADJUST VALVES. (48 NOS). REPLACE 10 NOS INJECTORS (10 NOS). REPLACE ROCKER COVER GASKET (48 NOS). CARRY OUT FUEL PUMP CALIBRATION (02 NOS). CLEAN TURBOCHARGER COMPRESSOR WHEEL AND DIFFUSER. (04). RENEW TURBOCHARGER BEARING . REPLACE MANIFOLD NUTS OR CAPSCREWS. CHANGE COOLANT. CARRY OUT CHEMICAL CLEANING OF COOLING SYSTEM. CHECK VIBRATION DAMPER CHANGE OIL BATH FILTER OF STARTING AIR SYSTEM. CHECK SAFETY CONTROL/SAFETY DEVICES, REPAIR/RENEW AS NECESSARY. CARRY OUT RANDOM INSPECTION OF TWO REPRESENTATIVE LINERS AND BEARINGS OF THE ENGINE. INSPECT OTHER LINERS/BEARINGS INCASE DETERIORATED. FOLLOWINGS INSPCTION AND EXAMINATION OF CYLINDERS TO BE CARRIED OUT. (a) GAUGING AND INSPECTION OF ONE LINER FROM EACH BANK FOR CORROSION/PITTING POST EXTRACTION. (b) GAUGING OF CONNECTING ROD BIG END BEARING CLEARANCES AND EXAMINATION OF BIG END SHELL FOR THE CYLINDER OPENED. (c) EXAMINE CRANK PIN SURFACE AND CHECK FOR OVALITY AND WEAR. (d) CHECK CONDITION OF VALVE GEAR BRACKET, TRANSFER SLEEVE SEALING RING AND INJECTOR TUBE . INSPECTION OF VALVE GEAR PARTS AND VALVE SEAT INSERTS OF THE CYLINDER HEAD OPENED. (e) EXAMINE PISTONS FOR WEAR AND GAUGE PISTON RING CLEARANCES. RENEW RINGS IF DEFECTIVE. UNDERTAKE ALIGNMENT CHECKS BETWEEN THE GEAR BOX AND THE ENGINE AND RESTORE RADIAL/AXIAL INITIAL ALIGNMENT TO 25% OF THE MAX LIMIT. RENEW RUBBER VIBRATION DAMPERS WHERE FITTED. OVERHAUL THE STARTING AIR MOTOR. ALL FAULTY/DAMAGED COMPONENTS TO BE REPLACED.

2

-

-

... More
2 MAIN ENGINE CONTROLS PART OF MAIN ENGINE CONTROLS CHECK SAFETY CONTROL/SAFETY DEVICES, RENEW FAULTY COMPONENTS

20

-

-

... More
3 GEAR BOX MAKE - ZF MARINE TYPE- ZF3050 (OEM CERTIFICATION REQUIRED) NR ROUTINES CHANGE GEARBOX OIL. FLUSH THROUGH THE SYSTEM (200 LTRS) CHECKS FOR ANY LEAKAGES, RECTIFY THE LEAKAGES (01 NOS) INSPECT THE MOUNTING BOLTS FOR LOOSEN, TIGHTEN IT IF REQUIRED. (20 NOS) CHECK THE PRESSURE AND TEMPERATURE GAUGE/SWITCHES ASSEMBLY FOR PROPER (30 NOS)FUNCTIONING, CALIBRATE THE GAUGES. RENEW FAULTY COMPONENTS. QTY - 08 PR GAUGE, QTY - 04 PR SWITCH (08 NOS) REPLACE OIL FILTER WITH GASKET (02 NOS) CLEAN THE OIL STRAINER BY FLUSHING IN CLEAN DIESEL (02 NOS) GREASE ALL BULKHEAD GLANDS/ PLUMBER BLOCKS, GP GREASE (05 KG) CHECK AHEAD AND STERN FUNCTIONAL TEST AND PROVE FOR SATISFACTORY PERFORMANCE. (02 NOS) CHECK/ADJUST ALIGNMNET WITH RESPECT TO ENGINE AND SHAFTING. (02 NOS) INSPECTION OF THRUST BEARING. RENEW IF REQUIRED. (02 NOS) CHEMICAL CLEANING AND PRESSURE TESTING OF COOLER/HEAT EXCHANGER BOTH SIDE(02 N OS) CARRY OUT FUNCTIONAL TEST OF GEARBOX CONTROL SYSTEM AND REPAIR/REPLACE( FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL GAUGES.(04 NOS)

2

-

-

... More
4 RUDDER ASSEMBLY QTY - 02 NOS NR ROUTINES CHECK RUDDER CLEARANCE.

2

-

-

... More
5 RUDDER NR ROUTINES TIGHT ALL BOLTS AND THEIR LOCKING ARRANGEMENT AND CHANGE DAMAGE BOLT

10

-

-

... More
6 RUDDER SPECIFIC DEFECT RENEW THE GLAND TIGHTNING BOLTS OF RUDDER.

6

-

-

... More
7 RUDDER SPECIFIC DEFECT RENEW GLAND PACKING AND PROVE FOR NO ANY LEAKAGES

2

-

-

... More
8 STEERING GEAR MAKE - GEETA ENGG (OEM CERTIFICATION REQUIRED) NR ROUTINES CHANGE HYDAULIC OIL (100 LTRS) CLEAN STORAGE AND SERVICE TANKCHANGE OIL FILTERS (04 NOS) RECTIFY ALL THE SYSTEM PIPELINE LEAKAGES. (06 NOS) CHECK ALIGNMENT OF RUDDER ANGLE INDICATOR, RENEW FAULTY INDICATOR MISC RENEW SOLENOID VALVES (02 NOS) CHECK FUNCTIONAL TEST OF STEERING GEAR FOR SATISFACTORY PERFORMANCE 02 NOS)

2

-

-

... More
9 SHAFTING NR ROUTINES CHECK SHAFT ALIGNMENT

2

-

-

... More
10 SHAFTING NR ROUTINES CHECK CLEARANCE OF PLUMBER BLOCKS.

6

-

-

... More
11 SHAFTING NR ROUTINES CLEANING OF SHAFT AND APPLY PROTECTIVE COATING.

2

-

-

... More
12 SHAFTING NR ROUTINES FUNCTIONALCHECKS AND REPAIR OF LOCKING ARRANGEMENT/SHAFT BRAKE.

2

-

-

... More
13 SHAFTING NR ROUTINES CHECK COUPLING BOLTS FOR TIGHTNESS

30

-

-

... More
14 INBOARD SEAL NR ROUTINES CHECK ALIGNMENT OF INBOUND SEAL

2

-

-

... More
15 INBOARD SEAL NR ROUTINES CHECK INFLATION CHECKS OF EMERGENCY SEAL WITH AIR PRESSURE.

2

-

-

... More
16 INBOARD SEAL NR ROUTINES CHECK COOLING WATER FLOW OF INBOARD SEAL

2

-

-

... More
17 PROPELLER QTY - 02 NR ROUTINES CLEANIG AND GREASING OF PROPELLER TO BE CARRIED OUT. CHECK FOR ANY DAMAGE/ PITTING. REPAIR AS REQUIRED.

2

-

-

... More
18 02 IN NOS DIESEL ALTERNATOR MAKE-KIRLOSKAR MODEL- 6R- 1080 TA (OEM CERTIFICATION REQUIRED) 9000 HRLY CHANGE ENGINE OIL AND LUB OIL FILTER CARTRIDGES.(200 LTRS) REPLACE FUEL FILTER CARTRIDGE (08 NOS) CARRY OUT CLEANING OF FUEL STRAINER OF FUEL FEED PUMP (02 NOS) CHANGE DRIVE BELTS AND ADJUST TENSION (10 NOS) CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF HEAT EXCHANGER (02 NOS) CARRY OUT CLEANING OF CENTRIFUGE CLEANER (02 NOS) CHECK THE VALVE CLEARANCE AND ADJUST IF REQUIRED (02 NOS) CALIBRATE FUEL INJECTORS (24 NOS) REPLACE 05 NOS INJECTORS (12 NOS) INSPECT/CLEAN TURBOCHARGER (05 NOS) OVERHAUL/REPLACE THE STARTER (04 NOS) REPLACE ALL THE FLEXIBLE HOSES AND DURETTES. (02 NOS) REPLACE THE ANTI VIBRATION MOUNTS. (20 NOS) CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF CHARGE AIR COOLER CARRY OUT VISUAL EXAMINATION OF ENGINE FOR CLEANLINESS AND LEAKAGES, IF ANY. RECTIFY THEM. (02 NOS) CHANGE THE COOLANT (100 LTRS) FUNCTIONING OF THERMOSTAT. REPLACE IF FOUND DEFECTIVE. (04 NOS) CARRY OUT REPLACEMENT OF DRY TYPE AIR CLEANERINSPECT/REPLACE THE CONNECTING ROD BEARING(02 NOS) REPLACE THE PISTON RINGS (02 NOS) CARRY OUT OVERHAULING OF FRESH WATER PUMPCARRY OUT OVERHAULING OF SEA WATER PUMP (04 NOS) RENEW HOT LAGGING.LENGTH 10 MTRS (10 MTRS) CHECK AND CALIBRATE ENGINE SENSORS,SWITCHES AND PRESSURE GAUGES REPLACE THE FAULTY COMPONENTS. UNDERTAKE SAFETY DEVICES CHECKS (02 NOS) CLEAN EXHAUST SILENCER 04 NOS) CARRY OUT FUNCTIONAL TEST OF BOTH DA CONTROL SYSTEM AND REPAIR/REPLACE FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL GAUGES AND CARRYOUT SAFETY DEVICES CHECKS.CARRY OUT FUNCTIONAL TEST OF BOTH DA CONTROL SYSTEM AND REPAIR/REPLACE FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL GAUGES AND CARRYOUT SAFETY DEVICES CHECKS. STBD DA - OIL LEAKAGE OBSERVED FROM FLYWHEEL INBOARD SEAL AND DEFECT TO BE RECTIFIED .

2

-

-

... More
19 EMERGENCY DIESEL ALTERNATOR MAKE- KIRLOSKAR CAPACITY 6.5 KV (OEM CERTIFICATION REQUIRED) NR ROUTINES CHANGE FUEL AND LUB OIL FILTER. (10 NOS) CHANGE LUB OIL. (100 LTRS) CALIBRATE/REPLACE INJECTORS. ADJUST VALVE SETTINGS. (04 NOS) CHANGE FAN BELT AND ADJUST TENSION. (04 NOS) CONTROL SYSTEM IS MALFUCTIONING, TO BE RECTIFIED AND PROVED. 01 NOS) OVERHAULING OF STARTER TO BE CARRIED OUT. (01 NOS)

10

-

-

... More
20 01 IN NO FUEL CENTRIFUGE MAKE- ALFA LAVAL TYPE- MAB 103B-24 NR ROUTINES INSPECT WORM WHEEL SHAFT AND GEAR HOUSING (10 NOS) CHECK WORM WHEEL AND WORM (100 LTR) RENEW OIL LEVEL IN GEAR HOUSING (04 NOS) CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE .(04 NOS) RENEW O RING AND SEALIN (04 NOS) GCARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS DEFECTIVE RENEW O RING AND SEALING MISC CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS DEFECTIVE (01 NOS)

1

-

-

... More
21 20 TPH SUBMERSIBLE PUMP MODEL-M120N(M) QTY - 04 NR ROUTINES EXAMINE INTERNAL WEAR (04 NOS) CHECK RUNNING CLERANCE (04 NOS) CHANGE MECHANICAL SEAL (04 NOS) CHECK DIFFUSER FOR WEAR AND CLERANCE (04 NOS)

4

-

-

... More
22 37 TPH DIESEL DRIVEN PUMP MODEL- SH65-16N1-DG S2-316 QTY - 02 NR ROUTINES CALIBRATE INJECTION NOZZLE OVERHAUL INJECTION PUMP ADJUST VALVE CLERANCE OF INTAKE AND EXHAUST VALVE CHECK THE SURFACE OF BRUSH AND SLIP RING REPLACE FUEL PIPING

2

-

-

... More
27 CO2 SYSTEM NR ROUTINES CARRY OUT WEIGHING OF CO2 BOTTLES. REFILL BOTTLES IF NET LOSS OF MORE THAN 10%, BOTTLES TO BE REFILLED IT SHALL BE REFILLED AFTER PRESSURE TESTING UPTO 1.5 TIMES OF WORKING PRESSURE.QTY- 02 IN NOS. CALIBRATE ALL PRESSURE SWITCHES AND GAUGES. CLEAN ALL NOZZLES. CARRYOUT FUNCTIONAL TEST WITH LP AIR.

2

-

-

... More
28 OILY BILGE SEPERATOR, MAKE - VICTOR (OEM CERTIFICATION REQUIRED) YEARLY CARRY OUT FUNCTIONAL CHECKS OF EQUIPMENT, REPAIR/ RENEW COMPONENT AS NECESSARY. PROVE THE EQUIPMENT FOR SATICFACTORY PERFORMANCE. (01 NOS) CALIBTARE ALL SENSOR AND GAUGES. RENEW AS REQUIRED. (10 NOS)

1

-

-

... More
29 AIR COMPRESSOR MAKE - INGERSOLL TYPE- RECIPROCATING MODEL- 7T4 NR ROUTINES DISMANTLE THE COMPRESSOR FROM FOUNDATION AND SHIFT IT TO THE SHOP FLOOR. CARRY OUT DECARBONISING AND DEGREASING WHILE COMPLETELY DISMANTLING THE COMPRESSOR TO COMPONENT LEVEL. UNDERTAKE GAUGING OF EACH COMPONENT TO CONFIRM THE DIMENSIONS . CARRYOUT NDT CRACK DETECTION TEST ON PISTON, CONNECTING ROD, CONROD , LINER,VALVE PLATES AND CRANKSHAFT BEFORE REUSING THE SAME. IN CASE OF ANY DEFECT , RENEW THE COMPONENT RENEW ALL GASKETS/JOINTS/O RINGS WHILE REASSEMBLING THE COMMPRESSOR AND THE ASSOCIATED COMPRESSOR PIPE LINE. CARRY OUT TEST BED TRIALS TO CONFIRM DESIGN SPECIFICATIONS. OVERHAUL/REPLACE AND RECALIBRATE ALL INSTRUMENTION,SAFETY CUTOUTS AND ASSOCIATED CONTROLS/ PANELS. RENEW SV MOUNTS, FOUNDATION BOLTS. CARRY OUT ALIGNMENT OF THE MOTOR AND THE COMPRESSOR. UNDERTAKE CAPACITY TRIALS OF THE COMPRESSOR UNDER GIVEN LOAD CONDITIONS. CALIBRATE/REPLACE ALL INJECTORS, RENEW NOZZLES CALIBRATE FIP. CHANGE LUB OIL AND LUB OIL FILTER CHANGE FUEL FILTER CALIBRATE/REPLACE ALL INJECTORS, RENEW NOZZLES

2

-

-

... More
30 DD ENGINE NR ROUTINES CALIBRATE FIP. CHANGE LUB OIL AND LUB OIL FILTER CHANGE FUEL FILTER REPLACE BELT. ADJUST BELT TENSION.

2

-

-

... More
31 AIR BOTTLES NR ROUTINES PRESSURE TESTING OF AIR BOTTLES TO BE CARRIED OUT UPTO 45 KG/CM2.QTY- 02 IN NOS, CAPACITY- 300 LTRS

2

-

-

... More
32 HP AIR SYSTEM VALVES NR ROUTINES 08 IN NO. AIR BOTTLE VALVES NOT HOLDING. TO BE REPLACED. TYPE- NEEDLE VALVE

8

-

-

... More
33 HP AIR SYSTEM VALVES NR ROUTINES HP AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 30 MM ,QTY- 10,TEST PRESSURE-60 PSI.

10

-

-

... More
34 HP AIR SYSTEM VALVES NR ROUTINES HP AIR SYSTEM PIPE LINES THINNED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED. WORK INVOLVES REMOVAL/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS AND FLANGE GASKETS TO BE RENEWED(MS).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING MAT- SS , SIZE- 50 MM ,LENGTH-20 MTR,TEST PRESSURE-500 PSI.

20

-

-

... More
35 STARTING AIR SYSTEM NR ROUTINES MAIN ENGINE STARTING AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 50 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
36 ADVANCED FIRE DETECTION SYSTEM NR ROUTINES FUNCTIONAL CHECKS OF ADVANCED FIRE DETECTION SYSTEM TO BE CARRIED OUT AND PROVED FOR SATISFACTORY PERFORMANCE. REPAIR/ RENEWAL OF COMPONENTS IF NECESSARY. DEFECTIVE SMOKE SENSOR TO BE REPLACED.

1

-

-

... More
37 FIRE MAIN SYSTEM VALVES NR ROUTINES FOLOWING FIRE MAIN SYSTEM DISCHARGE VALVES NOT HOLDING. TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/ OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING. TYPE-ANGLE VALVE, SIZE- 90MM, QTY-04, NOS TYPE- FLAP VALVE DIA- 15 MM,QTY- 06 NOS TYPE- GATE VALVE DIA- 25MM, QTY- 06 IN NOS, LOCATION- SCATTERED

16

-

-

... More
38 FIRE MAIN SYSTEM VALVES NR ROUTINES FOLOWING FIRE MAIN SYSTEM DISCHARGE VALVES NOT HOLDING. TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/ OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING. TYPE-ANGLE VALVE, SIZE- 90MM, QTY-04, NOS TYPE- FLAP VALVE DIA- 15 MM,QTY- 06 NOS TYPE- GATE VALVE DIA- 25MM, QTY- 06 IN NOS, LOCATION- SCATTERED

16

-

-

... More
39 FIRE MAIN SYSTEM ISOLATING VALVES SPECIFIC DEFECT 04 IN NOS FIREMAIN ISOLATING VALVE HOT HOLDING. TO BE REPLACED

4

-

-

... More
40 INSTRUMENTATION GAUGES NR ROUTINES 20 IN NOS SUCTION PRESSURE GAUGES, RANGE -0 TO 1 KG/CM2 AND 20 IN NOS DISCHARGE PRESSURE GAUGE, RANGE - 0 TO 10 KG/CM2 NOT SHOWING PRESSURE, GAUGE TO BE RENEWED.

25

-

-

... More
41 INSTRUMENTATION GAUGE PIPE LINES NR ROUTINES INSTRUMENTATION PIPE LINES OF VARIOUS MACHINERIES HOLED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED INCLUDING END FITTINGS. LENGTH- 25 MTR, SIZE-8 / 10 MM.

25

-

-

... More
42 HAND PUMPS NR ROUTINES 07 IN NOS HAND PUMPS NOT OPERATING. PUMPS TO BE OVERHAULED. LOCATION- SCATTERED, TYPE- SEMI ROTARY, CAP- 90 LTRS/ MIN.

7

-

-

... More
43 BILGE WATER SYSTEM SPECIFIC DEFECT BILGE PP NOT TAKING SUCTION FROM 4 MEN CREW MESS BOTH SIDE. SYSTEM TO BE PROVED

1

-

-

... More
44 BILGE WATER SYSTEM SPECIFIC DEFECT BILGE PP NOT TAKING SUCTION FROM STEERING GEAR COMPT BOTH SIDE. SYSTEM TO BE PROVED

1

-

-

... More
45 BILGE WATER SYSTEM SPECIFIC DEFECT 13 IN NOS VALVES OF BILGE PUMPING OUT TO BE OVERHAULED/REPLACED. LOCATION SCATTERED, DIA - 65 MM

13

-

-

... More
46 SEA WATER SYSTEM NR ROUTINES CLEAN/INSPECT SEA CHEST VALVES AND STRAINERS OF MAIN ENGINES AND DIESEL ALTERNATORS, REPAIR AS NECESSARY, BUTTER FLY VALVE QTY- 02, SIZE- 65 MM, ANGLE VALVE QTY- 02 IN NOS, SIZE- 65 MM

4

-

-

... More
47 SEA WATER SYSTEM NR ROUTINES INSPECT/REPLACE ZINC RODS/ CORROSION PLUGS ON SEA WATER SYSTEM

30

-

-

... More
48 SEA WATER SYSTEM SPECIFIC DEFECT MAIN SEA CHEST STRAINER ELEMENTS GOT PERISHED. TO BE RENEWED QTY 02 ,MAT SS

2

-

-

... More
49 SEA WATER SYSTEM SPECIFIC DEFECT SEA CHEST AIR VENT LINE OF BOTH SEA CHEST CORRODED AND PERISHED. PIPE LINE TO BE RENEWED.

2

-

-

... More
50 MAIN ENGINE SEA WATER PUMP NR ROUTINES BOTH MAIN ENGINE SEA WATER PUMP TO BE OVERHAULED WITH SPARES AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
51 MAIN ENGINE SEA WATER PUMP SPECIFIC DEFECT BOTH MAIN ENGINE SEA WATER PUMP TO BE SECURED WITH SECURING BRAKETS ALONGWITH SUCTION AND DISCHARGE PIPES.

2

-

-

... More
52 MAIN ENGINE SEA WATER SYSTEM NR ROUTINES BOTH MAIN ENGINE SEA WATER OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
53 MAIN ENGINE SEA WATER SYSTEM PIPE LINE NR ROUTINES BOTH MAIN ENGINE SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 80 MM , LENGTH - 20 MTRS, MAT - CUNI

20

-

-

... More
54 DIESEL ALTERNATOR SEA WATER PUMP NR ROUTINES BOTH DA SEA WATER PUMP TO BE OVERHAULED WITH SPARES AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
55 DIESEL ALTERNATOR SEA WATER SYSTEM NR ROUTINES BOTH DA SEA WATER SYSTEM OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
56 DIESEL ALTERNATOR SEA WATER SYSTEM PIPE LINE NR ROUTINES BOTH DA SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - CUNI

20

-

-

... More
57 MAIN ENGINE FUEL SYSTEM VALVES NR ROUTINES BOTH MAIN ENGINE FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 60 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
58 DA FUEL SYSTEM VALVES NR ROUTINES BOTH D/A FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 60 MM ,QTY- 02,TEST PRESSURE-60 PSI.

2

-

-

... More
59 GS PUMP NR ROUTINES PUMP DEVELOPING LOW PRESSURE. PUMP TO BE OVERHAULED. CHANGE ALL DEFECTIVE (01 nos) COMPONENTS. COUPLING PADS AND BOLTS TO BE CHANGED. ALIGNMENT TO BE DONE AFTER OVERHAULING. QTY - 01 REPLACE THE PUMP IF DECLARED BER. SUCTION AND DISCHARGE PRESSURE GAUGE TO BE CALIBRATED, REPLACE IF FOUND NOT REPAIRABLE. PUMP FOUNDATION CORRODED. TO BE RENEWED. QTY - 01

1

-

-

... More
60 FUEL TRANSFER PUMP NR ROUTINES 02 FUEL TRANSFER PUMP TO BE OVERHAULED WITH SPARES INCLUDING REMOVAL , FITTMENT AND TRIAL

2

-

-

... More
61 FUEL SYSTEM VALVES NR ROUTINES FOLLOWING VALVES NOT HOLDING, TO BE OVERHAULED. (A) PORT RU TANK SUCTION VALVE , (B) FUEL CENTRIFUGE BY PASS VALVE, (C) STBD STORAGE TANK MAIN SUCTION QUICK CLOSING VALVE, QTY- 02, SIZE- 50 MM (D) SDNR VALVE, QTY- 06 IN NOS , SIZE- 32 MM (E) NON RETURN VALVE, QTY- 04 IN NOS, SIZE- 20 MM (F) BALL VALVE, QTY - 06 NOS, SIZE 20 MM (G) FUEL TRANSFER PUMP SUCTION AND DISCHARGE VALVE - QTY 04 , DIA - 40 MM

24

-

-

... More
62 QUICK SHUT OFF VALVES NR ROUTINES 04 QUICK TO BE OVERHAUL AND CABLE WIRE OF ALL QUICK SHUT OFF VALVE TO BE REPAIRED/RENEWD INCLUDING RENEWAL/ REPAIR OF ALL MOVABLE COMPONETS AND APPLICATION OF LUBRICANT.

4

-

-

... More
63 FUEL STORAGE TANK NR ROUTINES 02 IN NO. FUEL STORAGE TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES: (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
64 FUEL RU TANK NR ROUTINES 02 IN NOS. MAIN ENGINE FUEL RU TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
65 FUEL RU TANK SPECIFIC DEFECT DRAIN VALVE OF BOTH FUEL TANK NOT HOLDING. VALVE TO BE RENEWD.

2

-

-

... More
66 FRESH WATER STORAGE TANK NR ROUTINES 02 IN NOS. FRESH WATER STORAGE TANK TO BE CLEANED, SURFACE PREPARED AND PAINTED. (01 COAT EROP, 02 COATS OF COLD BITUMINOUS.WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

2

-

-

... More
67 DOMESTIC FRESH WATER PUMP NR ROUTINES BOTH DOMESTIC FRESH WATER PUMP TO BE OVERHAULED WITH SPARES AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
68 DOMESTIC FRESH WATER SYSTEM PIPE LINE NR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST FRESH WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - MS

20

-

-

... More
69 DOMESTIC SEA WATER SYSTEM PIPE LINE NR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST DOMESTIC SEA WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - CU NI

20

-

-

... More
70 FUEL FILLING SYSTEM VALVES NR ROUTINES 02 IN NOS FUEL FILLING VALVE TO BE OVERHAULED. LOCATION - SCATTERED.

2

-

-

... More
71 FRESH WATER FILLING HYDRENT NR ROUTINES FRESH WATER FILLING HYDRENT PIPE LINE AND HYDRENT TO BE REPAIRED/ RENEWED.

2

-

-

... More
72 DURETTES NR ROUTINES DURETTES OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND PERISHED, TO BE RENEWED . ALL SECURING JUBILEE CLIPS/ CLAMPS TO BE RENEWED. Dia (mm) Length (mtr) 25 6 50 8 76 12 100 8 130 6

1

-

-

... More
73 BILGE NR ROUTINES BILGES OF MAIN ENGINE ,DA COMPARTMENT, STEERING GEAR COMPT AND 4 MEN MESS COMPARTMENT (BOTH SIIDES) TO BE CLEANED THROUGHLY AND TO BE PAINTED AS PER PAINT SCHEME.

2

-

-

... More
74 BILGE PLATES SPECIFIC DEFECT ALL BILGE PLATES TO BE SECURED WITH RUBBER COMMING,

1

-

-

... More
75 PAINTING SR ROUTINES ALL PIPE LINES, VALVES REPAIRED/RENEWED TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
76 GAUGE GLASS SPECIFIC DEFECT 02 IN NOS GAUGE GLASSES OF FUEL TANK AND FRESH WATER TANK TO BE RENEWED.

2

-

-

... More
77 MISCELLANEOUS MISC NUTS/ ADAPTORS OF VARIOUS SYSTEMS TO BE MANUFACTURED AS PER SAMPLE. MAT- BRASS, QTY - 40 NOS

40

-

-

... More
78 LAGGING LAGGING HOT LAGGING IS TO BE CARRIED OUT AT VARIOUS LOCATIONS. LENGTH- 07 MTRS

7

-

-

... More
79 TANK MANHOLES SPECIFIC DEFECT ALL TANK DOOR MANHOLES TO BE TIGHTENED WITH NEW NUTS AND BOLTS AND JOINT TO BE CHANGED.

1

-

-

... More
80 MISCELLANEOUS T HANDLES AND VALVE WHEELS MANUFACTURING OF T HANDLES AND VALVE WHEELS AS PER SAMPLES. QTY 10 EACH.

10

-

-

... More
81 MISCELLANEOUS SOUNDING CAP SOUNDING CAP NOT OPENING.SOUNDING CAP OF FUEL AND FW TANK TO BE REPAIRED.

4

-

-

... More
82 MISCELLANEOUS MISC MANUFACTURING OF PIPE LINES - (A) HYDRAULIC LINE OF STEERING GEAR. LENGTH 20 MTRS, DIA 15 MM, MAT MS (B)FUEL LINE FROM RU TANK TO BOTH MAIN ENGINE AND DA. LENGTH 25 MTRS, DIA 15 MM, MAT SS (C) FUEL TANK FILLING LINE. LENGTH 15 MTRS, DIA 100 MM , MAT MS

70

-

-

... More
ELECTRICAL

-

-

-

... More
1 ALTERNATORS MAKE - KIRLOSKAR QTY -02 & EMERGENCY DA ALTERNATOR, (8.8 KW) (1), QTY -03 OVERHAULING OF ALTERNATOR TO BE CARRIED OUT. BOTH INTERIOR & EXTERIOR PARTS OF THE MACHINE TO BE CLEAN WITH WHITE SPIRIT AND BLOWN WITH HOT AIR. REMOVE OIL AND DUST FROM INTERNAL PARTS OF ALTERNATOR. RENEWED BEARING CLEANING / VARNISHING OF STATOR WINDING. ALIGNMENT OF ALTERNATOR TO BE CARRIED OUT POST FITMENT OF ALTERNATOR. POST OVERHAULING AND FITMENT CHECK FOR INSULATION. INSULATION TO BE CHECKED BY MEGGER TERMINAL WITH RESPECT TO EARTH/BODY (MINIMUM INSULATION ACCEPTABLE IS 2 MEGA OHM).

3

-

-

... More
2 ALTERNATORS MAKE - KIRLOSKAR QTY -02 BOTH DIESEL ALTERNATORS ENGINE CONTROL PANELS AND ALARM PANELS MALFUNCTIONING TO BE OVERHAULED (I) INDICATION LAMPS DEFECTIVE. TO BE RENEWED.

6

-

-

... More
3 ALTERNATORS MAKE - KIRLOSKAR QTY -03 (II) PUSH BUTTONS DEFECTIVE. TO BE RENEWED.

6

-

-

... More
4 ALTERNATORS MAKE - KIRLOSKAR QTY -04 (III)ROTARY SWITCH DEFECTIVE TO BE RENEWED.

4

-

-

... More
5 ALTERNATORS MAKE - KIRLOSKAR QTY -02 OVER SPEED PROTECTION OF DIGITAL COUNTER NOT WORKING TO BE RENEWED.(QTY - 02).

2

-

-

... More
6 ALTERNATORS MAKE - KIRLOSKAR QTY -03 AVR DEFECTIVE. TO BE REPLACED AS PER SAMPLE.

3

-

-

... More
7 DYNAMO (24 V DC) QTY-03 MAKE - KIRLOSKAR (OEM CERTIFICATION REQUIRED) PORT DA DYNAMO DEFECTIVE. TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

3

-

-

... More
8 SELF STARTER (24V DC) QTY -03 MAKE - KIRLOSKAR (OEM CERTIFICATION REQUIRED) STBD DA SELF STARTER (24V DC) DEFECTIVE TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

3

-

-

... More
9 MAIN SWITCH BOARD MAKE - MARINA ELECTRICALS CALIBRATION OF FOLLOWING METERS TO BE CARRIED OUT (I) VOLT METERS -04 (II) FREQ. METERS -03 (III) AMMETERS - 05 (IV) KW METERS -02 (V) INSULATION METER- 02(01M OHM,01 K OHM) (VI) POWER FACTOR METER - 02 (VII) DOUBLE VOLT METER -01 (VIII) DOUBLE FREQUENCY METER - 01 (IX) SYNCHRONISE METER - 01 (X)BOTH DA SUPPLY BREAKER TO BE CALIBRATED - 02 (XI)CALIBRATE SHORE SUPPLY BREAKER IN SWITCH BOARD - 01 (XII) PORT DA SUPPLY BREAKER DEFECTIVE. TO BE REPLACED- 01

1

-

-

... More
10 SHORE SUPPLY BOX MAKE - L & t (I) SHORE SUPPLY BREAKER IN SHORE SUPPLY BOX DEFECTIVE, TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

1

-

-

... More
11 SHORE SUPPLY BOX MAKE - L & t (II) SHORE SUPPLY BOX CORRODED/ DEFECTIVE TO BE RENEWED AS PER SAMPLE.

1

-

-

... More
12 SHORE SUPPLY BOX MAKE - L & t (III) INDICATION LAMPS TO BE RENEWED AS PER SAMPLE.

4

-

-

... More
13 SHORE SUPPLY BOX MAKE - L & t (IV) PUSH BUTTONS TO BE RENEWED AS PER SAMPLE.

5

-

-

... More
14 SHORE SUPPLY BOX MAKE - L & t (V) VOLTAGE METER DEFECTIVE. TO BE REPLACED AS PER SAMPLE.

1

-

-

... More
15 SHORE SUPPLY BOX MAKE - L & t (VI) PHASE SEQUENCE METER DEFECTIVE TO BE REPLACED AS PER SAMPLE.

1

-

-

... More
16 SHORE SUPPLY BOX MAKE - L & t (VII) ROTARY SWITCH TO BE REPLACED AS PER SAMPLE.

1

-

-

... More
17 SHORE SUPPLY CABLE SHORE SUPPLY CABLE DEFECTIVE. TO BE REPLACED WITH NEW ONE AS PER SAMPLE. LENGTH-100MTR. CABLE SPECS-( 3 CORE X 35 SQ MM)

100

-

-

... More
18 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) CONTROL PANELS OF COMPLETE STEERING GEAR SYSTEM TO BE OVERHAULED.SYSTEM TO BE PROVED FOR SATISFACTORY FUNCTIONING. (I)PUSH BUTTONS DEFECTIVE. TO BE REPLACED.

6

-

-

... More
19 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (II) INDICATIONS DEFECTIVE. TO BE REPLACED.

6

-

-

... More
20 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (III) ALL RELAYS TO BE CHANGED.

12

-

-

... More
21 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (IV) ROTARY SWITCH TO BE CHANGED AS PER SAMPLE.

4

-

-

... More
22 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (V) RUDDER ANGLE INDICATOR DISPLAY UNIT DEFECTIVE, TO BE REPLACED WITH NEW ONE AS PER SAMPLE. QTY- 04

4

-

-

... More
23 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE FOLLOWING MOTORS TO BE OVERHAULED. BEARING TO BE RENEWED AND PROVE FOR SATISFACTORY PERFORMANCE. (I)BILGE PUMP (QTY-2)

2

-

-

... More
24 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (II)FIRE PUMP (QTY-2)

2

-

-

... More
25 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (III)AIR COMPRESSOR(QTY-1)

1

-

-

... More
26 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (IV)STEERING GEAR (QTY-4)

4

-

-

... More
27 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (V)FUEL TRANSFER PUMP (QTY-2)

2

-

-

... More
28 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (VI)FRESH WATER MOTOR (QTY-2)

2

-

-

... More
29 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (VII)BOAT DAVIT MOTOR (QTY-1)

1

-

-

... More
30 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (VIII) ANCHOR WINDLASS MOTOR (QTY-02)

2

-

-

... More
31 VENTILATION MOTORS MAKE - BHARAT BHIJLEE FOLLOWING VENTILATION MOTORS TO BE OVERHAULED . BEARING TO BE RENEWED AND PROVE FOR SATISFACTORY PERFORMANCE. (I)E/R EXHAUST FAN (QTY - 02)

2

-

-

... More
32 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (II)E/R SUPPLY FAN (QTY - 02)

2

-

-

... More
33 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (III)GALLEY EXHAUST FAN (QTY - 01)

1

-

-

... More
34 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (IV)GALLEY SUPPLY FAN (QTY - 01)

1

-

-

... More
35 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (V)CREW MESS SUPPLY FAN (QTY-1)

1

-

-

... More
36 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) FOLLOWING STARTERS AND CONTROL PANELS TO BE REPAIRED AND SAFETY PROTECTION TO BE CALIBRATED AS PER MOTOR RATED CURRENT.ELECTRICAL CONNECTIONS AND FASTENERS ARE TO BE TIGHTENED ON COMPLETION OF OVERHAULING, THE INSULATION OF ENTIRE SYSTEM TO BE CHECKED - BY A MEGGER - WITH RESPECT TO EARTH / BODY, MINIMUM INSULATION ACCEPTABLE IS 2 MEGA OHM. OVERHAULING OF A STARTER PANEL WOULD INVOLVE THE FOLLOWING:- (I). DEFECTIVE INTERNAL WIRING AND ALONG WITH ASSOCIATED TERMINALS, LUGS, ETC.TO BE REPLACED

50

-

-

... More
37 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (II) OVERLOAD RELAYS (OLR) , CONTACTORS & RELAYS ARE TO BE RENEWED WITH NEW ONE AS PER SAMPLE.

10

-

-

... More
38 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (III) INDICATION LAMPS DEFECTIVE TO BE REPLACED WITH NEW LED INDICATION LAMPS.

10

-

-

... More
39 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (IV). ROTARY SWITCHES DEFECTIVE OF STARTER PANEL TO BE REPLACED.

7

-

-

... More
40 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (V)PUSH BUTTONS DEFECTIVE TO BE CHANGED AS PER SAMPLE.

7

-

-

... More
41 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (VI).AIR COMPRESSOR STARTER - 01

1

-

-

... More
42 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (VII)FUEL TRANSFER PUMP STARTER - 02

2

-

-

... More
43 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (VIII)FRESH WATER PUMP STARTER - 02

2

-

-

... More
44 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (IX)SEA WATER PUMP STARTER - 02

2

-

-

... More
45 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (X)BILGE PUMP STARTER - 02

2

-

-

... More
46 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XI)ENGINE ROOM SUPPLY FAN STARTER - 02

2

-

-

... More
47 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) ENGINE ROOM EXHAUST FAN STARTER - 02

2

-

-

... More
48 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XII)STEERING GEAR STARTER (QTY-4)

4

-

-

... More
49 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XIII)BOAT DAVIT STARTER (QTY-1)

1

-

-

... More
50 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XIV)ENGINE CONTROL PANEL (QTY-2)

2

-

-

... More
51 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XV)ANCHOR WINDLASS STARTER (QTY-2)

2

-

-

... More
52 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XVI) EMERGENCY DA STARTER PANEL(QTY-01)

1

-

-

... More
53 FIRE ALARM SYSTEM MAKE - SHM SHIP CARE SERVICIABILITY CHECKS OF AFDS SYSTEM TO BE CARRIED OUT. SYSTEM TO BE PROVED POST OVERHAULING. (I)DEFECTIVE SENSORS TO BE REPLACED WITH NEW ONE. ALL SENSORS TO BE PROVED FOR SATISFACTORY FUNCTIONING.

5

-

-

... More
54 FIRE ALARM SYSTEM MAKE - SHM SHIP CARE (II) WIRING BETWEEN SENSOR AND CONTROL PANEL DEFECTIVE. TO BE REPLACED.

40

-

-

... More
55 FIRE ALARM SYSTEM MAKE - SHM SHIP CARE (III) PCB / RELAYS DEFECTIVE TO BE CHANGED AS PER SAMPLE.

1

-

-

... More
56 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS 01 IN NO TRANSFORMER BATTERY CHARGING RECTIFIER TO BE OVERHAULED 415V/24 V DC. CLEAN THE EQUIPMWNT WITH HOT BLOWER, ALCOHOL. PROVE THE BACK UP SUPPLY/EMERGENCY SUPPLY PROVE THE SYSTEM AFTER COMPLETION. (I) CHANGE ALL FUSES AND FUSE CARRIERS. .

1

-

-

... More
57 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (III) CONTACTOR AND MCCB DEFECTIVE REPLACE WITH NEW ONE.

2

-

-

... More
58 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (IV) REPLACE ROTARY SWITCH AS PER SAMPLE

2

-

-

... More
59 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (V) REPLACE PCB/RELAY WITH NEW ONE.

1

-

-

... More
60 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS CALIBRATION TO BE CARRIED OUT FOR THE FOLLOWING METERS. (I) VOLTMETER - 01

1

-

-

... More
61 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (II) AMMETER - 01

1

-

-

... More
62 WEATHER DECK LIGHT(CONICAL LIGHTS) MAKE - AJMERA ALL WEATHER DECK CONICAL LIGHT TO BE REPLACED WITH NEW LED FITTINGS. QTY-25

25

-

-

... More
63 BUNK LIGHT FITTING MAKE - AJMERA 20 IN NO BUNK LIGHTS NOT WORKING. (I) CHANGE ALL BUNK LIGHT WITH LED BUNK LIGHT.

20

-

-

... More
64 BUNK LIGHT FITTING MAKE - AJMERA (II) DEFECTIVE WIRING TO BE CHANGED AS PER REQUIREMENT.

30

-

-

... More
65 GENERAL LIGHTING(CUBICAL LIGHTS) MAKE - AJMERA ALL CUBICAL LIGHTS TO BE REPLACED WITH NEW LED FITTINGS. QTY-40

40

-

-

... More
66 GENERAL LIGHTING(20W TUBELIGHTS) MAKE - HAVELLS TUBE LIGHT FITTINGS(20W) DEFECTIVE TO BE REPLACED WITH NEW LED FITTINGS.QTY-20

20

-

-

... More
67 TALK BACK SYSTEM MAKE - AHUJA SERVICEABILITY CHECK OF TALK BACK SYSTEM FROM ENGINE ROOM TO WHEEL HOUSE NOT WORKING VIEW CABLE SHOWING OPEN CIRCUIT,CABLE TO BE REPLACED. SYSTEM TO BE PROVED POST OVERHAULING. (I) SPEAKERS DEFECTIVE REPLACE WITH NEW ONE. .

1

-

-

... More
68 TALK BACK SYSTEM MAKE - AHUJA (II) AMPLIFIER NOT GIVING OUTPUT TO BE RECTIFIED AND OUTPUT TO BE PROVED

1

-

-

... More
69 TALK BACK SYSTEM MAKE - AHUJA (III) WIRELESS RECEIVING UNIT IS DEFECTIVE. TO BE REPLACED WITH NEW ONE ALONG WITH WIRELESS MIKE.

1

-

-

... More
70 TALK BACK SYSTEM MAKE - AHUJA (IV) CABLES DEFECTIVE. NEW CABLE TO BE LAID.LENGTH APPROX- 600 MTR.

600

-

-

... More
71 TRANSFORMER 6KVA(415V/230V) MAKE - RADIANT ELECTRONICS 02 IN NO. LIGHTING TRANSFORMERS TO BE OVERHAULED. REWINDING OF BOTH TRANSFORMERS TO BE CARRIED OUT AND OUTPUT TO BE PROVED POST OVERHAULING.

2

-

-

... More
72 BATTERY BOX MAKE - SWL BATTERY BOX DEFECTIVE TO BE REPLACED WITH NEW BATTERY BOX.

4

-

-

... More
73 BATTERIES 12V 180 AH MAKE - EXIDE 10 IN NO 12V,180AH BATTERIES DEFECTIVE TO BE REPLACED WITH NEW BATTERIES. .

10

-

-

... More
74 NAVIGATION LIGHTS MAKE - HAVELLS (I) ALL NAVIGATION LIGHT FITTINGS TO BE REPLACED WITH NEW FITTINGS.QTY-10

10

-

-

... More
75 NAVIGATION LIGHTS MAKE - HAVELLS (II) WIRING OF NAVIGATION LIGHT IS DEFECTIVE, WIRING TO BE CHANGED FROM CONTROL PANNEL IN BRIDGE TO PARTICULAR LIGHT.(CABLE SPEC:- 02 CORE x 2 SQMM) .

70

-

-

... More
76 NAVIGATION LIGHTS MAKE - HAVELLS (III) CORRODED BASE OF NAVIGATION LIGHT FITTINGS TO REPLACED.

10

-

-

... More
77 NAVIGATION LIGHT CONTROL PANEL MAKE - RADIANT ELECTRONICS NAVIGATION LIGHTING PANEL TO BE COMPLETELY OVERHAULED INCLUDING REPLACEMENT OF ALL FUSES, RELAYS, CONTACTORS, INDICATIONS, ON/OFF SWITCHES FOR NAVIGATION LIGHTS AND PANEL TO BE CHECKED.REPLACE DEFECTIVE LIGHTS & SWITCHES.

12

-

-

... More
78 VHF SET(MAKE- SAILOR) 01 IN NO VHF SET NOT WORKING. TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

1

-

-

... More
79 CALL UP BELL MAKE - M/S LITESHINE (I) CALL UP BELL SYSTEM DEFECTIVE TO BE REPLACED WITH NEW ONE..

4

-

-

... More
80 CALL UP BELL MAKE - M/S LITESHINE (II) ELECTRIC BELL DEFECTIVE TO BE REPLACED.

4

-

-

... More
81 CALL UP BELL MAKE - M/S LITESHINE (III) PUSH BUTTONS AND INDICATIONS DEFECTIVE TO BE CHANGED.

4

-

-

... More
82 FLOOD LIGHTS MAKE - PHILIPS (I) 04 IN NO FLOOD LIGHT NOT WORKING, REPLACE WITH NEW LED LIGHT (200 W).

6

-

-

... More
83 FLOOD LIGHTS MAKE - PHILIPS (II) FLOOD LIGHT BASE DEFECTIVE, TO BE WELDED WITH NEW BASE.

6

-

-

... More
84 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD OVERHAULING OF GALLEY RANGE AND OVEN CONTROL PANEL TO BE CARRIED OUT. (I) HOT PLATE ASSEMBLY WITH ELEMENTS TO BE REPLACED WITH NEW ONE AS PER SAMPLE. (415V) QTY - HOT PLATE - 02 IN NOS,

2

-

-

... More
85 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (II)ELEMENTS - 08 IN NOS

8

-

-

... More
86 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (III) COMPLETE REWIRING OF GALLEY RANGE PANNEL AND OVEN TO BE CARRIED OUT WITH HEAT PROOF CABLE OF GOOD QUALITY.

50

-

-

... More
87 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (IV) ROTARY SWITCHES, INDICATIONS , MCBs, THERMOSTAT DEFECTIVE TO BE REPLACED.

5

-

-

... More
88 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (V) 415V SUPPLY SOCKET FOR GALLEY RANGE AND OVEN TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

2

-

-

... More
89 RADAR MAKE - KODEN SERVICEABILITY CHECKS OF RADAR. RADAR NOT SHOWING HEADING, DEFECT TO BE RECTIFIED. PROVE IT SATISFACTORY.

1

-

-

... More
90 WINDOW WIPER MAKE - MEGHA ROTOTECH (P) LTD 02 IN NO. WINDOW WIPER NOT WORKING. COMPLETE WINDOW WIPER ASSEMBLY WITH MOTOR TO BE REPLACED WITH NEW ONE

2

-

-

... More
91 ECHO SOUNDER MAKE- JAPAN MARINA & CO LTD SERVICEABILITY CHECKS OF ECHO SOUNDER SYSTEM, PROVE IT SATISFACTORY.

1

-

-

... More
92 SEARCH LIGHT MAKE - HAVELLS 02 IN NO. SEARCH LIGHT NOT WORKING. (I) COMPLETE SEARCH LIGHT ASSEMBLY TO BE REPLACED WITH NEW ASSEMBLY .

2

-

-

... More
93 SEARCH LIGHT MAKE - HAVELLS (II) CORRODED BASE OF SEARCH LIGHT TO BE COMPLETELY CHANGED.

2

-

-

... More
94 SEARCH LIGHT MAKE - HAVELLS (III) CABLE FROM BRIDGE TO EACH SEARCH LIGHT TO BE CHANGED AS PER SAMPLE.

40

-

-

... More
95 32 AMPS SOCKET MAKE - HAVELLS 55 IN NO. 32 AMPS SOCKET DEFECTIVE IN PASSANGER HALL, MASTER CABIN, CREW CABIN, DINING HALL, GALLEY, ENGINEER CABIN,BRIDGE AND STORE ROOMS. THE SAME TO BE REPLACED WITH NEW SOCKETS.

55

-

-

... More
96 32 AMPS SWITCH MAKE - HAVELLS 55 IN NO. 32 AMPS SWITCH DEFECTIVE IN PASSENGER HALL, MASTER CABIN, CREW CABIN, DINING HALL, GALLEY, ENGINEER CABIN,BRIDGE AND STORE ROOMS. THE SAME TO BE REPLACED WITH NEW SWITCHES.

55

-

-

... More
97 SPLIT AC/ROOF AC MAKE - CARRIER 05 IN NO SPILT AC/ ROOF ACs NOT WORKING. OUTDOOR UNIT IS DEFECTIVE. SPLIT AC/ ROOF ACs TO BE REPLACED WITH NEW ONE.

5

-

-

... More
98 EMERGENCY LIGHTS MAKE - MANISH INDUSTRIES 24 V EMERGENCY LIGHT NOT OPERATIONAL.DEFECT TO BE RECTIFIED. DEFECTIVE BULBS TO BE CHANGED.BULB RATING(24V DC) ALL RELAYs DEFECTIVE REPLACE WITH NEW ONE. PROVE THE SYSTEM POST COMPLETION.

5

-

-

... More
99 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS OVERHAULING OF PORTABLE RECTIFIER CUM BATTERY CHARGER TO BE CARRIED OUT AND OUTPUT TO BE PROVED (RATING 230V/24V). CLEAN THE EQUIPMENT WITH HOT BLOWER AND ALCHOL.PROVE THE OUTPUT. (I) FUSES AND FUSE CARRIERS DEFECTIVE TO BE REPLACED.

8

-

-

... More
100 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (II) AMMETER DEFECTIVE TO BE RENEWED.

2

-

-

... More
101 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (III) VOLTMETER DEFECTIVE TO BE RENEWED.

2

-

-

... More
102 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (IV) REPLACEMENT OF ROTARY SWITCH AS PER SAMPLE.

4

-

-

... More
103 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (V) PCB / RELAY DEFECTIVE TO BE REPLACED.

2

-

-

... More
104 ELECRIC HORN MAKE - KHERAJ ELECTRIC HORN DEFECTIVE REPLACE WITH NEW ONE AS PER SAMPLE.

1

-

-

... More
105 AIR WHISTLE/ HORN CABLING OF AIR WHISTLE TO BE CARRIED OUT FROM WHEEL HOUSE PANEL TO BRIDGE TOP. (APPROX. LENGTH 50 MTR X 2 CORE)PROVE THE SYSTEM AFTER COMPLETION.

50

-

-

... More
106 AIR WHISTLE/ HORN SOLENOID VALVE DEFECTIVE.TO BE REPLACED.

1

-

-

... More
107 E.O.T (ENGINE ORDER TELEGRAPH) (I)E.O.T SYSTEM NOT WORKING PROPERLY. SYSTEM TO BE CHECKED AND DEFECT TO BE RECTIFIED. PROVE THE COMMUNICATION SYSTEM.

1

-

-

... More
108 E.O.T (ENGINE ORDER TELEGRAPH) (II) CHANGE THE DEFECTIVE DISPLAY IN ENGINE ROOM AND WHEEL HOUSE.

1

-

-

... More
109 WALL MOUNTED FAN MAKE - BAJAJ ALL WALL MOUNTED FAN TO BE REPLACED WITH NEW ONE.

17

-

-

... More
110 ROTARY SWITCH & SOCKET 415 V MAKE - HAVELLS ALL ROTARY SWITCH & SOCKET TO BE REPLACED WITH NEW AS PER SAMPLE. QTY - 03 IN NOS.

3

-

-

... More
111 PARTY DECK ROOF LIGHT MAKE - AJMER ALL PARTY DECK ROOF LIGHT TO BE REPLACED WITH NEW LED FITTINGS AS PER SAMPLE.

20

-

-

... More
112 GPS MAKE - JAPAN MARINA & CO LTD GPS NOT SHOWING PROPER LOCATION. TO BE REPLACED WITH NEW ONE.

1

-

-

... More
113 HF SET MAKE - THRANE & THRANE SERVICEABILITY CHECKS OF HF SET TO BE CARRIED OUT. PROVE THE OUTPUT POST OVERHAULING.

1

-

-

... More
114 REFRIGERATOR MAKE - LG - 200 LTR REFRIGERATOR NOT WORKING. TO BE REPLACED WITH NEW ONE.

2

-

-

... More
115 DEFREEZER MAKE - BLUE STAR 180 LTRS DEFREEZER NOT WORKING. TO BE REPLACED WITH NEW ONE.

1

-

-

... More
MATERIAL - HULL

-

-

-

... More
7 UNDER WATER HULL ENTIRE UNDER WATER HULL INCLUDING BOOT TOP AREA TO BE CLEANED USING HIGH PRESSURE HYDRO JET TO REMOVE MARINE GROWTH FOR FACILITATING HULL INSPECTION. ENTIRE U/W AREA, BOOT TOP AREA TO BE HYDRO JET/GRIT BLASTED.(AREA :U/W -320 SQMTR INCLUDING BOOT TOP)

320

-

-

... More
8 UNDERWATER HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/DEFECTIVE UNDERWATER HULL INCLUDING BOOT TOP AREA AS PER ST3 STANDARD. (AREA :U/W -320 SQMTR INCLUDING BOOT TOP)

320

-

-

... More
9 UNDERWATER HULL SURVEY ENTIRE UNDERWATER HULL INCLUDING BOOT TOP AREA TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :U/W -320 SQMTR INCLUDING BOOT TOP AREA)

320

-

-

... More
10 UNDERWATER HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT UNDERWATER HULL INCLUDING BOOT TOP AREA AS PER HULL SURVEY REPORT. (PAYMENT ON ACTUALS)

6

-

-

... More
11 PAINT SCHEME FULL U/W PAINT SCHEME ARE TO BE RENEWED. FULL PAINT SCHEME AS PER NO 53/16 TO BE APPLIED.(AREA :U/W 320 SQMTR INCLUDING BOOT TOP AREA) (I) FOLLOWING PAINT SCHEME USED IN UNDER WATER AREAS:- INTERGARD 269 INTERSHIELD 300 INTERSHIELD 300 INTERGARD 263 INTERSWIFT 655(BROWN) INTERSWIFT 655(RED) INTERSWIFT 655(BROWN) (II) FOLLOWING PAINT SCHEME USED IN BOOT TOP AREA:- INTERGARD 269 INTERSHIELD 300 INTERSHIELD 300 INTERGARD 263 INTERSWIFT 655(BLACK) INTERSWIFT 655(BLACK) INTERSWIFT 655(BLACK) (III) 01 COAT OF ANTIFOULING COAT IS TO BE CARRIED OUT

320

-

-

... More
12 HULL SURVEY ENTIRE ABOVE WATER LINE ARE TO BE HYDRO JET/GRIT BLASTED FOR REMOVAL OF OLD PAINT/ ST3 PREPERATION. (AREA : 50 SQMTR )

50

-

-

... More
13 HULL SURVEY USG SURVEY TO BE CARRIED OUT OF ABOVE WATER LINE AREA.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA : 50 SQMTR)

50

-

-

... More
14 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT OF ABOVE WATER LINE AREA AS PER HULL SURVEY REPORT. MAX OF 1 T STEEL (PAYMENT ON ACTUALS)

2

-

-

... More
15 PAINT SCHEME ENTIRE ABOVE WATER LINE AREA PAINT SCHEME ARE TO BE RENEWED.FULL PAINT SCHEME AS PER NO 53/16 TO BE APPLIED. (AREA : 50 SQMTR).FOLLOWING PAINT SCHEME USED ON ABOVE WATER AREAS: INTERGARD 269 RED INTERGARD 269 RED INTERLAC 846 INTERLAC 846

50

-

-

... More
16 UNDERWATER HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE SUPER STRUCATURE AREA AS PER ST3 STANDARD. (AREA :200 SQMTR )

200

-

-

... More
17 UNDERWATER HULL SURVEY ENTIRE SUPER STRUCATURE AREA TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA : -200 SQMTR)

200

-

-

... More
18 UNDERWATER HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT SUPER STRUCATURE AREA AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
19 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE SUPER STRUCATURE AREA AS PER NO 53/16.(AREA : 250 SQMTR) FOLLOWING PAINT SCHEME USED ON SUPER STRUCTURE:- INTERGARD 269 INTERGARD 5600 GREY INTERGARD 5600 RED (I) FULL TOP COAT IS TO BE APPLIED ON SUPER STRUCTURE INCLUDING ALL FITTINGS. TOPCOAT - INTHERTHANE 990 WHITE

250

-

-

... More
20 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE WEATHER DECK AREA AS PER ST3 STANDARD. (AREA :-300 SQMTR )

300

-

-

... More
21 HULL SURVEY ENTIRE SUPER STRUCATURE AREA TO BE USG SURVEYED AS PER IRS STANDARD (AREA : -300 SQMTR )

300

-

-

... More
22 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT WEATHER DECK AREA AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
23 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE WEATHER DECK AREA AS PER NO 53/16.(AREA : 300 SQMTR) FOLLOWING PAINT SCHEME USED ON WEATHER DECK:- (TOTAL AREA 300 SQ MTR) INTERGARD 269 INTERSHIELD 300 ALUMINUM INTERSHIELD 852 NON-SKID GREY (FULL TOP COAT IS TO BE APPLIED ON WEATHER DECK AREA)

300

-

-

... More
24 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE BULWARK AREA (FWD & AFT) AS PER ST3 STANDARD. (AREA : -60 SQMTR )

60

-

-

... More
25 HULL SURVEY ENTIRE BULWARK AREA (FWD & AFT) TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY.(AREA :60 SQMTR )

60

-

-

... More
26 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT BULWARK AREA (FWD & AFT) AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
27 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE BULWARK AREA (FWD & AFT) AS PER NO 53/16.(AREA : 60 SQMTR) FOLLOWING PAINT SCHEME USED ON BULWARK :- INTERGARD 269 INTERTUF 262 INTERGARD 263 INTHERTHANE 990 (FULL TOP COAT IS TO BE APPLIED ON BULWARK AREA)

60

-

-

... More
28 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE ENGINE ROOM,MACHINERY AND BILGES AS PER ST3 STANDARD. (AREA : -350 SQMTR )

350

-

-

... More
29 HULL SURVEY ENTIRE ENGINE ROOM, MACHINERY AND BILGES TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :350 SQMTR )

350

-

-

... More
30 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT ENGINE ROOM, MACHINERY AND BILGES AS PER HULL SURVEY REPORT.MAX OF 1 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
31 PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE ENGINE ROOM, MACHINERY AND BILGES AS PER NO 53/16.(AREA : 350 SQMTR) FOLLOWING PAINT SCHEME USED ON MACHINERY AND BILGES :- 1. INTERGARD 269 (RED) 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON MACHINERY AND BILGES)

350

-

-

... More
32 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE FUEL OIL TANKS AS PER ST3 STANDARD. (AREA : 100 SQMTR )

100

-

-

... More
33 HULL SURVEY FUEL OIL TANKS TO BE USG SURVEYED AS PER IRS STANDARD (AREA :100 SQMTR )

100

-

-

... More
34 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE FUEL OIL TANKS AS PER NO 53/16.(AREA : 100 SQMTR) FOLLOWING PAINT SCHEME USED ON FUEL OIL TANKS 1. INTERLINE 850 2. INTERLINE 850 (FULL TOP COAT IS TO BE APPLIED ON FUEL OIL TANKS)

100

-

-

... More
35 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE FRESH WATER TANK (P&S) AS PER ST3 STANDARD. (AREA : 90 SQMTR )

90

-

-

... More
36 HULL SURVEY FRESH WATER TANKS (P&S) TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :90 SQMTR )

90

-

-

... More
37 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE FRESH WATER TANK (P&S) AS PER NO 53/16.(AREA : 90 SQMTR) FOLLOWING PAINT SCHEME USED ON FRESHWATER TANK (P&S) 1. INTERLINE 850 2. INTERLINE 850 (FULL TOP COAT IS TO BE APPLIED ON FRESH WATER TANKS)

90

-

-

... More
38 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE STEERING GEAR COMPARTMENT AS PER ST3 STANDARD. (AREA : 80 SQMTR )

80

-

-

... More
39 HULL SURVEY STEERING GEAR COMPARTMENT TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :80 SQMTR )

80

-

-

... More
40 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT STEERING GEAR COMPARTMENT AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
41 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE STEERING GEAR COMPARTMENT AS PER NO 53/16.(AREA : 80 SQMTR) FOLLOWING PAINT SCHEME USED ON STEERING GEAR COMPARTMENT 1. INTERLINE 850 2. INTERLINE 850 (FULL TOP COAT IS TO BE APPLIED ON STEERING GEAR COMPARTMENT)

80

-

-

... More
42 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE VOID SPACE FWD (P & S) AND AFT (P & S) AS PER ST3 STANDARD. (AREA : 150 SQMTR )

150

-

-

... More
43 HULL SURVEY VOID SPACE FWD(P & S) AND AFT (P & S) TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY. (AREA :150 SQMTR )

150

-

-

... More
44 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT VOID SPACE FWD(P & S) AND AFT (P & S) AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
45 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE VOID SPACE FWD(P & S) AND AFT (P & S) AS PER NO 53/16.(AREA : 150 SQMTR) FOLLOWING PAINT SCHEME USED ON VOID SPACE FWD(P & S) AND AFT (P & S) 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON VOID SPACE)

150

-

-

... More
46 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE STP COMPARTMENT AS PER ST3 STANDARD. (AREA : 40 SQMTR )

40

-

-

... More
47 HULL SURVEY STP COMPARTMENT TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY.(AREA :40 SQMTR )

40

-

-

... More
48 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT STP COMPARTMENT AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
49 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE STP COMPARTMENT AS PER NO 53/16 (AREA : 40 SQMTR) FOLLOWING PAINT SCHEME USED ON STP COMPARTMENT 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON STP COMPARTMENT)

40

-

-

... More
50 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE FORE PEAK TANK AS PER ST3 STANDARD. (AREA : 85 SQMTR )

85

-

-

... More
51 HULL SURVEY FORE PEAK TANK TO BE USG SURVEYED.FIRM TO HIRE SUITABLE MARINE SURVEYORS WITH ADEQUATE QUALIFICATION AND EXPERIENCE / IRS / LRS FOR VISUAL SURVEY / USG SURVEY.(AREA :85 SQMTR )

85

-

-

... More
52 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT FORE PEAK TANK AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
53 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE FORE PEAK TANK AS PER NO 53/16.(AREA : 85 SQMTR) FOLLOWING PAINT SCHEME USED ON FORE PEAK TANK 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON FORE PEAK TANK)

85

-

-

... More
54 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE CHAIN LOCKER (P & S) AS PER ST3 STANDARD. (AREA : 80 SQMTR )

80

-

-

... More
55 HULL SURVEY CHAIN LOCKER (P & S) TO BE USG SURVEYED AS PER IRS STANDARD (AREA :80 SQMTR )

80

-

-

... More
56 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT CHAIN LOCKER (P & S) AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
57 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE CHAIN LOCKER (P & S) AS PER NO 53/16.(AREA : 80 SQMTR) FOLLOWING PAINT SCHEME USED ON CHAIN LOCKER (P & S) 1. INTERGARD 269 2. INTERSHIELD 300(BRONZE) 3. INTERSHIELD 300(ALUMINIUM) (FULL TOP COAT IS TO BE APPLIED ON CHAIN LOCKER (P & S))

80

-

-

... More
58 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA AS PER ST3 STANDARD. (AREA : 150 SQMTR )

150

-

-

... More
59 HULL SURVEY INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA TO BE USG SURVEYED AS PER IRS STANDARD (AREA :150 SQMTR )

150

-

-

... More
60 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREAAS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01TON

1

-

-

... More
61 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA AS PER NO 53/16.(AREA : 150 SQMTR) FOLLOWING PAINT SCHEME USED INTERNAL ACCOMODATION / BULKHEADS/ MISCELLENIOUS AREA INTHERTHANE 990 WHITE (FULL TOP COAT IS TO BE APPLIED)

150

-

-

... More
62 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE TRANSOM KEEL AS PER ST3 STANDARD. (AREA : -10 SQMTR )

10

-

-

... More
63 HULL SURVEY ENTIRE TRANSOM KEELTO BE USG SURVEYED AS PER IRS STANDARD (AREA :10 SQMTR )

10

-

-

... More
64 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT TRANSOM KEEL AS PER HULL SURVEY REPORT.MAX OF 01 T STEEL (PAYMENT ON ACTUALS) QTY- 01 TON

1

-

-

... More
65 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE TRANSOM KEEL AS PER NO 53/16.(AREA : 10 SQMTR) FOLLOWING PAINT SCHEME USED ON TRANSOM KEEL :- INTERGARD 269 INTERTUF 262 INTERGARD 263 INTHERTHANE 990 (FULL TOP COAT IS TO BE APPLIED ON TRANSOM KEEL)

10

-

-

... More
66 HULL SURVEY SURFACE PREPARATION TO BE CARRIED OUT AT DAMAGE/ DEFECTIVE MAIN MAST AND FITTINGS AS PER ST3 STANDARD. (AREA : -15 SQMTR )

15

-

-

... More
67 HULL SURVEY ENTIRE MAIN MAST AND FITTINGSTO BE USG SURVEYED AS PER IRS STANDARD (AREA :15 SQMTR )

15

-

-

... More
68 HULL SURVEY PLATE RENEWAL TO BE CARRIED OUT AT MAIN MAST AND FITTINGSAS PER HULL SURVEY REPORT.MAX OF 0.5 T STEEL (PAYMENT ON ACTUALS) QTY- 0.5 TON

0.5

-

-

... More
69 PAINT SCHEME PAINT CONDITION TO BE INSPECTED AND RENEWAL IS TO BE CARRIED OUT AT DEFECTIVE MAIN MAST AND FITTINGSL AS PER NO 53/16.(AREA : 15 SQMTR)

15

-

-

... More
70 MISCELLANEOUS U/W STRUCTURE EXAMINE REMOVE, CLEAN, PAINT AND REFIT THE EDDY PLATE AND ROPE GUARD.

1

-

-

... More
71 RUDDER EXAMINE UNDERWATER STRUCTURE IN ACCORDANCE WITH NO 19/06, PAYING PARTICULAR ATTENTION TO HULL PLATING IN THE VICINITY OF RUDDER(S), FITTING UPTO THE RUDDER HEAD, FOR SIGNS OF CORROSION, DEFECTS AND DAMAGE. EXAMINE RUDDER PINTLE BEARINGS TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING.

1

-

-

... More
72 U/W INLETS CARRY OUT THE VISUAL SURVEY OF INLETS AND DISCHARGES. CLEAN AND EXAMINE GRATINGS OF INLETS AND DISCHARGES. EXAMINE PLATING AND COATING OF INLETS AND DISCHARGES AND AREAS ADJACENT TO THEM.

1

-

-

... More
73 SEA TUBES CARRY OUT 100 % VISUAL SURVEY AND USG SURVEY OF 02 IN NO. SEA TUBES. CLEAN AND EXAMINE. REPAIR / RENEW AS NECESSARY. AIR PRESSURE TEST OF REPAIRED SEA TUBES TO BE CARRIED OUT.

2

-

-

... More
74 SACRIFICIAL ANODES INSPECT SACRIFICIAL ANODES FITTED TO UNDERWATER HULL, RUDDERS,ROPE GAURD, SHAFT TUNNEL, STERN TUBES, INLETS AND OUTLETS, SEA TUBES, BILGES AND COFFER DAMS. RENEW THOSE CONSUMED 50% OR MORE. (ENSURE SACRIFICIAL ANODES ARE NOT PAINTED. ANY PAINT OR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFORE UNDOCKING.) DETAILS OF FITTED SACRIFICIAL ANODE IS AS FOLLOWS:- 1) HULL – 14 NOS (MK I, DS CAT NO. 9530000524) 2) STERN – 12 NOS (MK VI – 3 ON EACH SIDE, DS CAT NO. 9530000528) 3) RUDDER – 04 NOS (MK VI – 01 ON EACH SIDE, DS CAT NO. 9530000528) 4) SEACHEST – 08 NOS (MK V – 02 NOS. PER SEACHEST, DS CAT NO. 9530000528) ANODES ARE TO BE SUPPLIED BY THE FIRM

38

-

-

... More
75 TESTING OF WATER TIGHT COMPARTMENT ALL TANKS, COFFERDAMS AND SEA TUBES WHICH ARE REPAIRED BY BUILD UP/RENEWAL OR ARE SUBJECTED TO HOT WORK FOR WELDING OF PAD PIECE/ FOUNDATION ON ANY OF THEIR BOUNDARIES ARE TO BE AIR PRESSURE TESTED. THE PRESSURE APPLIED SHOULD NEVER EXCEED THAT WHICH CORRESPONDS TO A PRESSURE OF 0.2 KG/SQ CM (2 METERS OF WATER OR 0.20 BARS OR 2.1/2 IBF/ SQ IN).

1

-

-

... More
76 HULL SURVEY STEEL SHIP CARRY OUT CHIPPING, SURVEY, INSPECTION AND RENEWAL OF BOLLARDS,FAIRLEADS , DECK FITTING, MACHINERY FOUNDATIONS, TANKS FOUNDATION ,DECK EYE , MISC FITTINGS AND THE HULL STRUCTURE INCLUDING STIFFENING MEMBERS IN THE VICINITY WITH NON-DESTRUCTIVE TECHNIQUES, IF REQUIRED AND INCLUDE IN THE SURVEY REPORT. RENEW FITTINGS AS PER SURVEY REPORT. MAT-M.S .MAX OF 3 T STEEL (PAYMENT ON ACTUALS)

3

-

-

... More
77 ANCHOR CHAIN CABLE (I) A QULIFIED BLACK SMITH TO BE EMPLOYED FOR REMOVAL AND DISMANTLING OFANCHOR AND CHAIN CABLE IN ACCORDANCE WITH NO 07/2011. PROPER SIZE TOP SWAGE TO BE USED FOR DISMANTLING OF ALL SHACKLE PINS (II) ENTIRE CHAIN CABLE TO BE RANGED GRIT BLASTING / MECHANICAL WIRE BRUSHING/HYDOJET BLASTING OF ENTIRE CHAIN CABLE AND ANCHOR WITH ACCESSORIES TO BE CARRYOUT. (III) ANCHOR AND ASSOCIATED ANCHOR CHAIN CABLE TO BE SURVEYED. (IV) POST SURVEY ANCHOR AND CHAIN CABLE WITH ACCESSORIES ARE TO BE PAINTED WITH BLACK BITUMENUS ANTI CORROSION PAINT IAW NCD 3909 (V). POST SURVEY MENTIONED BELOW ALL ACCESSORISE TO BE ASSEMBLED TOGETHER AND FITTED BACK. (VI) ANCHORING AND WEIGH ANCHORING TRIALS TO BE COMPLETED AND SYSTEM TO BE PROVED. ANCHOR CHAIN CABLE DETAILS AS FOLLOWS: 1) CHAIN DIA- 14 MM 2) CHAIN LENGTH - 225 RMTR ANCHOR SHACKLE - 02, FULL SHACKLE - 08 KENTER SHACKLE - 10 D. SHACKLE - 02 SWIVEL PIECE - 04 02 IN BLAKE SLIPS 02 IN NO ANCHOR STROPS 02 IN NO BOTTLE SCREW SLIPS ANCHOR - 02

1

-

-

... More
78 ANCHOR WINDLASS OVERHAULING OF ANCHOR WINDLASS (P&S)-QTY-02 FOLLOWING DEFECTS OF ANCHOR WINDLASS TO BE RECTIFIED. (A) CHIPPING/SURVEY AND RENEWAL OF ANCHOR WINLASS FOUNDATION & FITTINGS TO BE CARRIED OUT AS PER SURVEY REPORT. (B) BRAKE LINER TO BE RENEWED (PORT / STBD). (C) ANCHOR WINDLASS GULLETINE ARRANGEMENT PORT/ STBD JAMMED. OVERHAULING / SERVICING TO BE CARRIED OUT. (D) 10 NOS GREASE NIPPLES OF WINDLASS DECK MACHINERY TO BE RENEWED. HIGH PRESSURE GREASE FILLING ON ALL GREASE NIPPLES TO BE CARRIED OUT POST. (E) GEAR BOX OIL TO BE CHANGED. TOTAL QTY- 50 LTR (F) OVERHAULING OF WINDLASS GEAR BOX & FITTINGS -QTY 02

1

-

-

... More
79 SEWAGE TREATMENT PLANT SEWAGE TREATMENT PLANT (EVAC SEWAGE TREATMENT PLANT, MODEL-ORCA II A 36):- OVERHAULING OF ENTIRE SYSTEM TO BE CARRIED OUT. PROVE FOR SATISFACTORY OPERATION.

1

-

-

... More
80 SINGLE ARM BOAT DAVIT OVERHAULING OF SINGLE ARM BOAT DAVIT- QTY-01 ,FOLLOWING DEFECTS OBSERVED IN BOAT DAVIT. (A) CHIPPING/SURVEY AND RENEWAL OF BOAT DAVIT FOUNDATION & FITTINGS TO BE CARRIED OUT AS PER SURVEY REPORT. (B) ABNORMAL SOUND OBSERVED, HARD TO OPERATE. ENGAGE CLUTCH LEVER JAMMED.OVERHAULING CARRIED OUT AND PROVE FOR SATIFACTORY OPERATIONS. (C) SURVEY OF WIRE ROPE TO BE CARRIED OUT IT FOUND UNSERVICABLE TO BE REPLACED. (D) CHANGE THE GEAR BOX LUB OIL. QTY – 10 LTR, VISCOSITY RANGE – REDWOOD NO. 1 AT 140 F 300-400 (E) LOAD TEST OF DAVIT TO BE CARRIED OUT.LOAD TEST CERTIFIACTE ISSUED. SAFE WORKING LOAD 01 TON. (F) 02 IN NO POLYSTER SLING FOR LIFTING OF GEMINI TO BE PROVIDED FOR PORT THE DAVIT. (G) 02 HANDLE FOR MANUAL OPERATION FOR DAVIT CORRODED/BROKEN, TO BE MANUFACTURED AS PER SAMPLE. .

1

-

-

... More
81 WT HATCH OVERHAULING OF 04 IN NOS WT HATCH: FOLLOWING DEFECTS OBERVED IN WT HATCH: - (A) CHIPPING/SURVEY AND RENEWAL OF WT HATCH COVER ,COAMING ,DOOR HANDLES, AND STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT. (B) 04 IN NO WT HATCH ON WEATHER DECK RUBBER BEADING CRACKED. RUBBER BEADING IS TO BE REPLACED AND CHALK TEST IS TO BE CARRIED OUT. (C) HANDLES ARE HARD TO OPERATE. TO BE MADE EASED.

4

-

-

... More
82 WT DOOR FOLLOWING DEFECTS OBSERVED IN WT DOOR: -QTY-22 (A) CHIPPING/SURVEY AND RENEWAL OF WT DOOR ,COAMING ,DOOR HANDLES,RUBBER BEADING AND STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT (B) WT DOOR CLIPS HARD TO OPERATE,TO BE MADE EASED. (C) RUBBER BEADING CRACKED. RUBBER BEADING TO BE RENEWED. CHALK TEST IS TO BE CARRIED OUT.

22

-

-

... More
83 NWT DOOR REPAIR/RENEWAL OF DAMAGED NWT WOODEN DOOR IS TO BE CARRIED OUT. ALL THE DAMAGE ACCESSORIES TO BE RENEWED (HINGE UPROOTED- 50, DOOR CLOUSER HYDRALIC- 08 ,MORTARISE LOCK /DOOR LOCK- 08, DOOR BEADING- 60 RMT.MAT-AL/ WOOD

14

-

-

... More
84 FOOT STEP REPAIR/RENEWAL OF C/T/H ENTRANCE DOOR FOOT STEP TO BE CARRIED OUT. QTY-44. MAT-MS

44

-

-

... More
85 BREATHER PIPE/ AIR BREATHER REPAIR/RENEWAL OF C/T/H BREATHER PIPE/VENTILATION PIPE ON WEATHER DECK (FOXLE) TO BE CARRIED OUT. JOB INVOLVE BREATHER TO BE MANUFACTURED AS PER SAMPLE,RENEW FLANGES AND WIRE MESH . QTY-06, MAT-MS

6

-

-

... More
86 TYRE FENDER RENEWAL OF DAMGED/BROKEN TYRE FENDER ON SHIP SIDE TO BE CARRIED OUT. QTY TYRE FENDER-40. MAT-RUBBER

40

-

-

... More
87 TYRE FENDER CHAIN REPAIR/RENEWAL OF DAMGED/BROKEN TYRE FENDER CHAIN ON SHIP SIDE TO BE CARRIED OUT. LENGTH- CHAIN-80 RMT. MAT-GI CHAIN

80

-

-

... More
88 TYRE FENDER EYE RENEWAL OF DAMGED/BROKEN TYRE FENDER EYE AND COLLAR ON SHIP SIDE TO BE CARRIED OUT. EYE-80 NOS. MAT-MS EYE/ COLLAR

80

-

-

... More
89 FIRE HOSE BOX REPAIR/RENEWAL OF BROKEN FIRE HOSE BOX TO BE CARRIED OUT. QTY-4 NOS

4

-

-

... More
90 CLEATS MANUFACTURING OF 8 IN NOS CLEATS (04 EACH SIDE) FOR ROPE HANDLING ARE TO BE WELDED ON BULWARK FOR ROPE HANDLING. MAT MS

8

-

-

... More
91 GUARDRAIL RENEWAL OF DAMAGE GUARDRAIL ON WEATHER DECK TO BE CARRIED OUT. LENGTH-150 RMT, MAT-GI.

150

-

-

... More
92 GUARDRAIL REAPIR/RENEWAL OF DAMAGE GUARDRAIL SUPPORTING FRAME ON WEATHER DECK TO BE CARRIED OUT.QTY-30

30

-

-

... More
93 WINDLASS CONTROL PANEL POST CHIPPING, SURVEY AND RENEWAL OF WINDLASS CONTROL PANEL POST/ STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT.MAT-MS , QTY-2

2

-

-

... More
94 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF HAND OPERTED PUMP STRUCTURE AND FITTINGS ON FOXLE TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS , QTY-2

2

-

-

... More
95 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF TWIN BOLLARD (SMALL) ON WEATHER TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS/MS PIPE , QTY-6

6

-

-

... More
96 METALLIC SWITCH BOX RENEWAL OF METALLIC SWITCH BOX ON WEATHER DECK (FOXLE) TO BE CARRIED OUT. MAT-MS, QTY-01

1

-

-

... More
97 SHIP SIDE FIXED FENDER RENEWAL OF SHIP SIDE RUBBER FENDER INCLUDING MS FRAME TO BE CARRIED OUT. LENGTH- 80 RMT, MAT-RUBBER (AS PER SAMPLE)

80

-

-

... More
98 SHIP SIDE FIXED FENDER SECURING BRACKET RENEWAL OF SHIP SIDE RUBBER FENDER SECURING BRACKET/FRAME TO BE CARRIED OUT. LENGTH- 160 RMT, MAT-MS, SIZE-6 MM

160

-

-

... More
99 VENTILATION FLAPS CHIPPING, SURVEY AND RENEWAL OF VETNILATION FLAPS ON WEATHER DECK (PORT) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE FLAP COVER, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-02, MAT-MS/ RUBBER BEADING

2

-

-

... More
100 VENTILATION/ BREATHER PIPE REPAIR/RENEWAL OF C/T/H VENTILATION PIPE/ BREATHER PIPE ON WEATHER DECK (P&S) TO BE CARRIED OUT. JOB INVOLVE MISSING BREATHER TO BE MANUFACTURE AS PER SAMPLE,RENEW FLANGES AND WIRE MESH . QTY-14, MAT-MS

14

-

-

... More
101 MANHOLE COVER CHIPPING,SURVEY AND RENEWAL OF C/T/H MANHOLE COVER,RUBBER PACKING & HANDLES TO BE CARRIED OUT OF ALL MISC TANKS.(QTY.16). ALL NUT & BOLTS TO BE REPLACED.

16

-

-

... More
102 GANGWAY CHAIN RENEWAL OF THINNED/CORRODED GI CHAIN (GANGWAY) (P&S) ON WEATHER DECK TO BE CARRIED OUT. MAT-GI, LENGTH- 12 RMT.

12

-

-

... More
103 VENTILATION FLAPS (SMALL) CHIPPING, SURVEY AND RENEWAL OF VETNILATION FLAPS ON WEATHER DECK (P) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-12, MAT-MS/ RUBBER BEADING

12

-

-

... More
104 PVC PIPE RENEWAL OF DAMAGE/BROKEN SHIP SIDE PVC DRAIN PIPE WITH FITTINGS ACCESSIORIES TO BE CARRIED OUT. QTY-02 (P&S) LENGTH- 12 RMT

12

-

-

... More
105 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF BULLRING, STRUCTURE AND FITTINGS ON AFT TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS, QTY-2

2

-

-

... More
106 SHORE SUPPLY BOX METALLIC RENEWAL OF CORRODED/THINNED SHORE SUPPLY METALLIC BOX ON AFT (WEATHER DECK) TO BE CARRIED OUT. MAT-MS, QTY-02.

2

-

-

... More
107 DRAINAGE PIPE RENEWAL OF CORRODED/THINNED DRINE LINE ON WEATHER DECK (GALLEY TO SEA) TO BE CARRIED OUT. MAT-GI. PIPE, RMT- 05

5

-

-

... More
108 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF BOLLARDS (SMALL) ON WEATEHR DECK AFT TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS/MS PIPE , QTY-2

2

-

-

... More
109 FIRE HOSE BOX RENEWAL OF BROKEN FIRE HOSE BOX TO BE CARRIED OUT. MAT. MS / FIBER ,QTY-2 NOS

2

-

-

... More
110 CABLE TRAY RENEWAL OF C/T/H CABLE TRAY TO BE CARRIED OUT. LENGTH- 50 RMT

50

-

-

... More
111 U TYPE VENTILATION SYSTEM CHIPPING, SURVEY AND RENEWAL OF VETNILATION STRUCTURE ON SHIP SIDE (P&S) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF WIRE MESH AND CLEANING OF VENTILATION DUCT.QTY- 02, MAT-MS.

2

-

-

... More
112 SECURING BRACKET REPAIR/RENEWAL OF C/T/H FIRE MAIN LINE/FRESH WATER/SEA WATER PIPE LINE U CLAMPS/ SECURING BRACKET TO BE CARRIED OUT. MAT-MS, QTY- 40 NOS.

40

-

-

... More
113 VENTILATION FLAPS CHIPPING, SURVEY AND RENEWAL OF VETNILATION FLAPS ON WHEEL HOUSE DECK (FUNNEL) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-1, MAT-MS/ RUBBER BEADING

1

-

-

... More
114 VENTILATION SYSTEM (BIG) CHIPPING, SURVEY AND RENEWAL OF VETNILATION SYSTEM ON WHEEL HOUSE DECK TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE RENEW OF DAMAGE VENTILATION, FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS AND RUBBER BEADING. QTY-3, MAT-MS/ RUBBER BEADING

1

-

-

... More
115 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF A/C FOUNDATION ON WHEEL HOUSE DECK TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-MS, QTY-2

2

-

-

... More
116 U TYPE VENTILATION PIPE CHIPPING, SURVEY AND RENEWAL OF VETNILATION PIPE ON WHEEL HOUSE DECK (P&S) TO BE CARRIED OUT OF AS PER SURVEY REPORT.MAT-M.S. JOB INVOLVE FLAP COVER,STRUCTURE, HINGES, OVERHAULING OF BUTTERFLY NUTS,RUBBER BEADING AND CLEANING OF VENTILATION DUCT.QTY- 02, MAT-MS.

2

-

-

... More
117 PVC COATED STEEL WIRE ROPE GUARDRAIL (I) RENEWAL OF DAMAGED/BROKEN PVC COATED WIRE ROPE GUARD RAIL. TOATL NO 04, EACH LENGTH OF 02 MTR. SS BOTTLE SCREW SLIP- 04, SS U LIPS- 08, SS D-SHACKLE- 08 (II) RENEWAL OF DAMAGED PVC COATED WIRE ROPE GUARD RAIL. TOATL NO 06, EACH LENGTH OF 02 MTR. BOTTLE SCREW SLIP- 06, U LIPS- 12, D-SHACKLE- 12, MAT- SS.

1

-

-

... More
118 G.I CHAIN RENEWAL OF THINNED/CORRODED GI CHAIN (GANGWAY) (P&S) ON WHELL HOUSEK TO BE CARRIED OUT. MAT-GI, LENGTH- 20 RMT.

20

-

-

... More
119 WHEEL HOUSE WINDOW GLASS CLEANING,SURVEY OF 16 IN NOS WINDOW GLASS TO BE CARRIED OUT.JOB INVOLVE RENEWAL OF RUBBER BEADING, 04 NOS GLASS TO BE RENEWED AS PER EXISTING FITMENT

16

-

-

... More
120 NAME BOARD FC URVASHI NAME BOARD ON WHEEL HOUSE BROKEN/PERISHED TO BE REPAIRED/RENEWED. QTY- 02. MAT- MS.

2

-

-

... More
121 GUARDRAIL RENEWAL OF DAMAGE GUARDRAIL ON WHEEL HOUSE DECK TO BE CARRIED OUT. LENGTH-30 RMT, MAT-GI.

30

-

-

... More
122 GANGWAY/BROW REPAIR/RENEWAL OF BROKEN/DAMAGED GANGWAY/BROW TO BE CARRIED OUT. LOAD TEST TO BE CARRIED OUT. LOAD TEST CERTIFICATE TO BE ISSUED. -QTY01, LENGTH- 4 MTRS MAT-AL

1

-

-

... More
123 FRESH WATER AND SEA WATER SYSTEM RENEWAL OF CORRODED/THINNED PIPE LINE (FW & SEA WATER) THROUGH OUT THE CRAFT TO BE CARRIED OUT. MAT- CU-NI, LENGTH- 30 RMT. DIA OF FW LINE- 35 MM , DIA OF SEA WATERV LINE - 65 MM

30

-

-

... More
124 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF LIFERAFT FOUNDATION AND STRUCTURE ON WHELL HOUSE DECK TO BE CARRIED OUT AS PER SURVEY REPORT.MAT-MS , QTY-6

6

-

-

... More
125 HYDROSTATIC RELEASE GEAR HRG ( LIFERAFT) RENEWAL AND FITMENT OF HRG FOR LIFE RAFT TO BE CARRIED OUT. QTY-06. CERTIFICATE TO BE PROVIDED.

6

-

-

... More
126 LADDERS CHIPPING, SURVEY AND RENEWAL OF ON WEATHER DECK TO 01 DECK AND 01 DECK TO WHEEL HOUSE TOP SLOPPING LADDES TO BE CARRIED OUT INCLUDING FOOT STEPS,HANDRAILS AND SIDE PLATE.MS.

1

-

-

... More
127 LIFEBOUY BASE CHIPPING, SURVEY AND RENEWAL OF LIFEBOUY BASE/ SECURING ARRANGEMENT ON WHEEL HOUSE BRIDGE TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-02

2

-

-

... More
128 A/C FOUNDATION CHIPPING, SURVEY AND RENEWAL OF A/C FOUNDATION BASE & FITTINGS ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-03

3

-

-

... More
129 SEARCH LIGHT STRUCTURE CHIPPING, SURVEY AND RENEWAL OF SEARCH LIGHT STRUCTURE ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-02

2

-

-

... More
130 SINTEX (OVERHEAD TANKS) RENEWAL OF DAMAGE SINTEX ON WHEEL HOUSE TOP TO BE CARRIED OUT. CAPACITY- 500 LTRS, QTY-02

2

-

-

... More
131 TANKS FOUNDATION AND STRUCTURE CHIPPING, SURVEY AND RENEWAL OF TANKS FOUNDATION AND STRUCTURE ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-02

2

-

-

... More
132 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF ANTENNA BASE AND STRUCTURE FOUNDATIONS OF ANTENNA , LIGHTS, AC , WATER TANKS ON WHEEL HOUSE TOP TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY-03

3

-

-

... More
133 GUARDRAIL RENEWAL OF DAMAGED GUARDRAIL ON WHEEL HOUSE TOP TO BE CARRIED OUT. LENGTH-30 RMT, MAT-GI.

30

-

-

... More
134 STEEL WIRE ROPE RENEWAL OF CORRODED/THINNED RIGGING WIRE ROPE ON MAST TO BE CARRIED OUT. LENGTH- 07 MTRS, QTY-03 THICKNESS- 04 MM

3

-

-

... More
135 NAME BOARD NAME BOARD OF FC URVASHI TO BE RENEWED AND FITTED ON MAST.QTY-01

1

-

-

... More
136 MODULAR SHED ON WHEEL HOUSE DECK RENEWAL OF MODULAR SHED AS PER EXISTING FITTINGS. MAT-AL/ SS SHEET & RAINFORCE SHEET

1

-

-

... More
137 PASSANGER CHAIR STITCHING OF CHAIR COVERS TO BE CARRIED OUT AS PER SAMPLE AND CLOTHES .

50

-

-

... More
138 GALLEY TRUNKING CHEMICAL CLEANING OF GALLEY TRUNKING LINE, END WIRE MESH AND FILTER TO BE CARRIED OUT. LENGTH - 15 RMT.

15

-

-

... More
139 WT HATCH OVERHAULING OF 03 IN NOS WT HATCH ON INTERNAL COMPARTMENT: FOLLOWING DEFECTS OBERVED IN WT HATCH: - (A) CHIPPING/SURVEY AND RENEWAL OF WT HATCH COVER ,COAMING ,DOOR HANDLES, AND STRUCTURE TO BE CARRIED OUT AS PER SURVEY REPORT. (B) 03 IN NO WT HATCH ON INTERNAL COMPARTMENT RUBBER BEADING CRACKED. RUBBER BEADING IS TO BE REPLACED AND CHALK TEST IS TO BE CARRIED OUT. (C) HANDLES ARE HARD TO OPERATE. TO BE MADE EASED.

3

-

-

... More
140 ENGINE ROOM MISC FOUNDATION SURVEY AND RENEWAL OF C/T/H MAIN ENGINE ROOM MISC FOUNDATION TO BE CARRIED OUT AS PER SURVEY REPORT.QTY-08, MAT-MS

8

-

-

... More
141 ENGINE ROOM MISC FITTINGS SURVEY AND RENEWAL OF C/T/H MAIN ENGINE ROOM MISC FRAMES/BRACKET/STIFFENERS TO BE CARRIED OUT AS PER SURVEY REPORT.QTY-30, MAT-MS

30

-

-

... More
142 LOCKER RENEWAL OF DAMAGED WOODEN LOCKER WITH LOCKING ARRAGEMENT ON CABINS & WHEEL HOUSE.QTY-10 NOS

10

-

-

... More
143 SANITARY SYSTEM SANITARY SYSTEM: (DINNING ROOM,CREW MESS ROOM & CREW WC) RENEWAL OF WASH BASIN FLEXIBLE HOSE AND FITTINGS. LENGTH- 01 MTRS-QTY-05

5

-

-

... More
144 SANITARY SYSTEM SANITARY SYSTEM: (|DINNING ROOM-02,GALLEY-02 , CREW MESS -02 & CREW WC-6) RENEWAL OF NON OPS COMMERCAIL WATER TAP. MAT-SS, QTY-12

12

-

-

... More
145 SANITARY SYSTEM SANITARY SYSTEM (DINNING ROOM & CREW MESS ROOM ) DRAIN LINE OF WASH BASIN TO BE CLEARED AND CHEMICAL CLEANED. LENGTH- 10 RMT

10

-

-

... More
146 SANITARY SYSTEM SANITARY SYSTEM (CREW MESS ROOM): RENEWAL OF DAMAGE/BROKEN DINNING TABLE TO BE CARRIED OUT AS PER SAMPLE-QTY-01, MAT- WOOD/SUNMICA

1

-

-

... More
147 SANITARY SYSTEM SANITARY SYSTEM (CREW MESS ROOM -01 & CREW WC-04) : RENEWAL OF DECK DRAIN STAINER. QTY-05, MAT-SS

5

-

-

... More
148 SANITARY SYSTEM GALLEY: RENEWAL OF SS SINK (WASH BASIN) FLEXIBLE HOSE AND FITTINGSTO BE CARRIED OUT . LENGTH- 02 MTRS-QTY-01

1

-

-

... More
149 SANITARY SYSTEM GALLEY: RENEWAL OF DRAIN LINE OF WASH BASIN TO BE CARRIED OUT. LENGTH- 06 RMT

6

-

-

... More
150 SANITARY SYSTEM CREW WC: RENEWAL OF DAMAGE/BROKEN FIBER DOUBLE DOOR (WATER PROOF)& FITTINGS AS PER SAMPE. QTY-04 (EACH 2)

4

-

-

... More
151 SANITARY SYSTEM CREW WC: RENEWAL OF DAMAGE/BROKEN WESTERN COMMODE & FLUSHING BOX .QTY-02

2

-

-

... More
152 SANITARY SYSTEM CREW WC:REPAIR/RENEWAL OF C/T/H DRAIN LINE OF WC. LENGTH-10 RMT. MAT-GI

10

-

-

... More
153 SANITARY SYSTEM CREW WC: 02 SHOWER FITTING PIPELINE IN CREW TOILET CORRODED/ DAMAGED TO BE RENEWED.LENGTH- 10 RMT MAT- CU(PIPELINE),

10

-

-

... More
154 SANITARY SYSTEM CREW WC: RENEWAL OF NON OPS COMMERCIAL SHOWER AS PER EXISTING FITTNGS,QTY-02. MAT-SS.

2

-

-

... More
155 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF DAMAGE/BROKEN FIBER DOUBLE DOOR (WATER PROOF) & FITTINGS AS PER SAMPE. QTY-04 (EACH 2)

4

-

-

... More
156 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF DAMAGE/BROKEN WESTERN COMMODE & FLUSHING BOX .QTY-04

4

-

-

... More
157 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: REPAIR/RENEWAL OF C/T/H DRAIN LINE OF WC. LENGTH-30 RMT. MAT-GI

30

-

-

... More
158 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF WASH BASIN FLEXIBLE HOSE AND FITTINGS. LENGTH- 03 MTRS-QTY-03

3

-

-

... More
159 SANITARY SYSTEM ENGINEER CABIN ,MASTER CABIN & PASSENGER ROOM VIP: RENEWAL OF NON OPS COMMERCAIL WATER TAP. MAT-SS, QTY-12

12

-

-

... More
160 SANITARY SYSTEM 02 IN NOS SHOWER FITTINGS PIPELINE IN ED& MASTER TOILET CORRODED/ DAMAGED TO BE RENEWED.LENGTH- 20 RMT MAT- CU(PIPELINE)

20

-

-

... More
161 SANITARY SYSTEM RENEWAL OF NON OPS COMMERCIAL SHOWER IN ED& MASTER TOILET AS PER EXISTING FITTNGS,QTY-02. MAT-SS.

2

-

-

... More
162 SANITARY SYSTEM DECK DRAIN STAINER OF ED & MASTER CABIN WC'S CORRODED/ BROKEN TO BE RENEWED. MAT- BRASS

4

-

-

... More
163 HULL SURVEY CHIPPING, SURVEY AND RENEWAL OF WET COMPARTMENT FOUNDATION AND FITTINGS TO BE CARRIED OUT AS PER SURVEY REPORT. MAT-MS. QTY- 20

20

-

-

... More
164 METALLIC LOCKER RENEWAL/ REPAIR OF DAMAGED MESS METALLIC LOCKER WITH LOCKING ARRAGEMENT IN CREW CABIN TO BE CARRIED OUT.QTY-8 NOS

8

-

-

... More
165 DRAINAGE SYSTEM 02 IN NO DECK DRAINS ON 01 & 02 DECKS CORRODED/ THINED. MANUFACTURING AND FITMENT OF NEW DRAIN PIPES AS PER EXISTING FIT AND FITMENT OF THE SAME INSITU.QTY-02 ,MAT-GI, LENGTH- 4 MTS (EACH)

2

-

-

... More
166 STENCILING STENCILING TO BE DONE ON ALL THE AIR VENTS, HATCHWAYS, MANHOLE COVERS,WT DOORS,EXHAUST , ENTRY, EXIT, DECK FITTINGS ETC.

60

-

-

... More
167 HULL SURVEY SERVICEABILITY CHECKS, SURVEY AND RENEWAL OF PORT HOLES TO BE CARRIED OUT AS PER SURVEY REPORT.PORT HOLE-GLASS THK- 10 MM, DIA- 250 MM, QTY-12 NOS.

12

-

-

... More
168 CHEQUER PLATE & NUTS REPAIR/RENEWAL OF C/T/H CHEQUER PLATE WITH SS NUT FOR SECURING OF ENGINE ROOM & MACHINERY COMPARTMENT TO BE CARRIED OUT. CHEQUER PLATE AREA- 15 SQ MTRS & QTY- 150 SS NUTS

15

-

-

... More
169 LOAD TESTING LOAD TESTING TO BE CARRIED OUT OF ALL DECK FITTINGS ON UPPERDECK(INCLUDING BOLLARDS,FAIRLEAD,EYE,LIFTING APPLIANCES) CERTIFCATES TO BE ISSUED.

12

-

-

... More
170 PANNELING DEGUTTING AND REGUTTING OF PANNELING TO BE CARRIED OUT AT DIFFECTIVE AREA. (AREA-50SQM)

50

-

-

... More
171 LAGGING LAGGING TO BE CARRIED OUT AT DIFFECTIVE AREA THROUGH OUT THE CRAFT. (AREA-50 SQM)

50

-

-

... More
172 GAS FREE OF TANKS FOLLOWING TANKS & COMPARTMENT ARE TO BE VENTILATED. GAS FREE/ MAN ENTRY/ SAFE TO WELD CERTIFICATE TO BE OBTAINED BY THE FIRM. CLEANING OF THE TANKS TANKS & COMPARTMEN ARE TO CARRIED OUT THOROUGHLY FOR SURVEY BY IRS. A) FRESH WATER TANK (P&S) B) FUEL OIL TANK (P&S) C) FO READY USE TANK (P&S) D) FOREPEAK TANK E) VOID SPACE (FWD & AFT) F) STEERING COMPARTMENT (P&S) G) STP COMPARTMENT H) CHAIN LOCKER (P &S)

14

-

-

... More
173 DECK COVERING FULL SCHEME DECK COVERING TO BE CARRIED OUT IN WHEEL HOUSE, LOBBY, CABINS ,GALLEY ,MESS,LIVING SPACE,WET COMPARTEMENT AND PASSENGER HALL. AREA – 200 MTR2

200

-

-

... More
174 AQUAGUARD PURIFIER INSTALATION OF 01 IN NO AQUAGUARD PURIFIER & LINE FITTNGS TO BE CARRIED OUT IN DINNING ROOM.QTY-01

1

-

-

... More
175 WATER COOLER 01 IN NO WATER COOLER (BULE STAR) NON OPS TO BE RENEWED

1

-

-

... More
176 BUNK MATTRESS BUNK MATTRESS DAMAGED/TORN TO BE RENEWED. MAKE - SLEEPWELL. SIZE - 3X6 FEET

13

-

-

... More
177 FIRST AID BOX REPLACEMENT OF FIRST AID BOX ON WHEEL HOUSE TO BE CARRIED OUT. QTY-01

1

-

-

... More
178 CHAIR REPLACEMENT/RENEWAL OF 15 IN NOS CHAIR FOR WHEEL HOUSE & GALLEY TO BE CARRIED OUT AS PER SAMPLE . QTY-15 NOS

15

-

-

... More
179 HULL SURVEY SURVEY/RENEWAL OF C/T/H DADO AREA OF LOBBY,DINNING ROOM, GALLEY ,CREW ACCOMODATION AND WC TO BE CARRIED OUT.AREA-30 SQ MTRS MAT- MS

30

-

-

... More
180 PANNELING RENEWAL OF PANNELING ON WHEEL HOUSE WITH WOODEN FINISHING IS TO BE CARRIED OUT. MAT-PLY WOOD 6MM AND TOP SUNMICA.AREA-50 SQ MTRS

50

-

-

... More
181 MISCELLANEOUS FIRE EXTINGUISHER (FOAM, WATER, DCP,AFFF) BRACKET OF FOLLOWING PLACES DAMAGED / BROKEN TO BE RENEWED AND WELDED INSITU AS PER SAMPLE.QTY-08 MAT- MS. (A) BRIDGE (B) GALLEY (C) LOBBY (D) ACCOMMODATION SPACE ,ETC.

8

-

-

... More
182 LIFE RAFT RENEWAL OF SECURING STRAPS OF LIFE RAFT TO BE CARRIED OUT. MAT- POLYSTER

12

-

-

... More
183 MAN OVERBOARD MARKER RENEWAL OF MAN OVERBOARD MARKER ON WHEELHOUSE DECK.QTY-02

2

-

-

... More
184 ANCHOR HOUSE PIPE BOTH THE ANCHORS STUCK IN HOUSE PIPE WHILE CARRYING OUT OPERATION AND TRAILS, SLOPE OF BOTH HOUSE PIPE TO BE INCREASE FOR SMOTH OPERATION OF BOTH THE ANCHORS DURING ANCHORING. FOLLOWING WORKS INVOLVES:- (A) DUGETTING OF EXISTING HOUSE PIPE BRACKETS.(B) SLOPE OF HOUSE PIPES TO BE INCREASED. (C) NECESSORY STRENGTHNING AND SUPPORTING BRACKETS AND STRUCTURE OF BOTH HOUSE PIPE TO BE CARRIED OUT.(E) POST COMPLETION OF WORK TRAILS TO BE UNDERTAKEN FOR SMOTH OPERATION OF ANCHORS.

2

-

-

... More
185 EMERGENCY DA FOUNDATIN RENEWAL OF EMERGENCY DA FOUNDATION AND DECK PLATE TO BE CARRIED OUT AS PER SAMPLE DIMENSION

1

-

-

... More
ENGINEERING

-

-

-

... More
1 02 IN NOS MAIN ENGINES MAKE- CUMMINS INDIA MODEL KTA-38-M1 (OEM CERTIFICATION REQUIRED) 12000 HRLY CHANGE AIR CLEANER ELEMENT (06NOS). CHANGE ENGINE OIL (400 LTRS). CHANGE ENGINE FUEL FLOW FILTER (06 NOS). FUEL HOSES OF BOTH MAIN ENGINE TO BE RENEWED (10 NOS). CHANGE BY PASS FILTER (08 NOS) CHANGE MARINE GEAR OIL (50 NOS). RECTEFIED THROTTLE LINKAGE, ADJUST AS REQUIRED (02 NOS) CHANGE MARINE GEAR OILRECTEFIED THROTTLE LINKAGE, ADJUST AS REQUIRED (50 NOS) CHANGE FUEL FILTER (02 NOS). RENEW AIR PIPING (06 NOS). CHANGE CRANKCASE BREATHER (05 NOS) REPLACE HEAT EXCHANGER ZINC PLUGS (10 NOS). REPLACE BELTS. CARRY OUT INSPECTION OF ENGINE VALVE ROTATORS (01 NOS). CLEAN FUEL TANK FROM INSIDE (04 NOS). CHECK IDLER AND WATER PUMP IDLER (04 NOS) CLEAN AND CALIBRATE INJECTORS AND ADJUST VALVES. (48 NOS). REPLACE 10 NOS INJECTORS (10 NOS). REPLACE ROCKER COVER GASKET (48 NOS). CARRY OUT FUEL PUMP CALIBRATION (02 NOS). CLEAN TURBOCHARGER COMPRESSOR WHEEL AND DIFFUSER. (04). RENEW TURBOCHARGER BEARING . REPLACE MANIFOLD NUTS OR CAPSCREWS. CHANGE COOLANT. CARRY OUT CHEMICAL CLEANING OF COOLING SYSTEM. CHECK VIBRATION DAMPER CHANGE OIL BATH FILTER OF STARTING AIR SYSTEM. CHECK SAFETY CONTROL/SAFETY DEVICES, REPAIR/RENEW AS NECESSARY. CARRY OUT RANDOM INSPECTION OF TWO REPRESENTATIVE LINERS AND BEARINGS OF THE ENGINE. INSPECT OTHER LINERS/BEARINGS INCASE DETERIORATED. FOLLOWINGS INSPCTION AND EXAMINATION OF CYLINDERS TO BE CARRIED OUT. (a) GAUGING AND INSPECTION OF ONE LINER FROM EACH BANK FOR CORROSION/PITTING POST EXTRACTION. (b) GAUGING OF CONNECTING ROD BIG END BEARING CLEARANCES AND EXAMINATION OF BIG END SHELL FOR THE CYLINDER OPENED. (c) EXAMINE CRANK PIN SURFACE AND CHECK FOR OVALITY AND WEAR. (d) CHECK CONDITION OF VALVE GEAR BRACKET, TRANSFER SLEEVE SEALING RING AND INJECTOR TUBE . INSPECTION OF VALVE GEAR PARTS AND VALVE SEAT INSERTS OF THE CYLINDER HEAD OPENED. (e) EXAMINE PISTONS FOR WEAR AND GAUGE PISTON RING CLEARANCES. RENEW RINGS IF DEFECTIVE. UNDERTAKE ALIGNMENT CHECKS BETWEEN THE GEAR BOX AND THE ENGINE AND RESTORE RADIAL/AXIAL INITIAL ALIGNMENT TO 25% OF THE MAX LIMIT. RENEW RUBBER VIBRATION DAMPERS WHERE FITTED. OVERHAUL THE STARTING AIR MOTOR. ALL FAULTY/DAMAGED COMPONENTS TO BE REPLACED.

2

-

-

... More
2 MAIN ENGINE CONTROLS PART OF MAIN ENGINE CONTROLS CHECK SAFETY CONTROL/SAFETY DEVICES, RENEW FAULTY COMPONENTS

20

-

-

... More
3 GEAR BOX MAKE - ZF MARINE TYPE- ZF3050 (OEM CERTIFICATION REQUIRED) NR ROUTINES CHANGE GEARBOX OIL. FLUSH THROUGH THE SYSTEM (200 LTRS) CHECKS FOR ANY LEAKAGES, RECTIFY THE LEAKAGES (01 NOS) INSPECT THE MOUNTING BOLTS FOR LOOSEN, TIGHTEN IT IF REQUIRED. (20 NOS) CHECK THE PRESSURE AND TEMPERATURE GAUGE/SWITCHES ASSEMBLY FOR PROPER (30 NOS)FUNCTIONING, CALIBRATE THE GAUGES. RENEW FAULTY COMPONENTS. QTY - 08 PR GAUGE, QTY - 04 PR SWITCH (08 NOS) REPLACE OIL FILTER WITH GASKET (02 NOS) CLEAN THE OIL STRAINER BY FLUSHING IN CLEAN DIESEL (02 NOS) GREASE ALL BULKHEAD GLANDS/ PLUMBER BLOCKS, GP GREASE (05 KG) CHECK AHEAD AND STERN FUNCTIONAL TEST AND PROVE FOR SATISFACTORY PERFORMANCE. (02 NOS) CHECK/ADJUST ALIGNMNET WITH RESPECT TO ENGINE AND SHAFTING. (02 NOS) INSPECTION OF THRUST BEARING. RENEW IF REQUIRED. (02 NOS) CHEMICAL CLEANING AND PRESSURE TESTING OF COOLER/HEAT EXCHANGER BOTH SIDE(02 N OS) CARRY OUT FUNCTIONAL TEST OF GEARBOX CONTROL SYSTEM AND REPAIR/REPLACE( FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL GAUGES.(04 NOS)

2

-

-

... More
4 RUDDER ASSEMBLY QTY - 02 NOS NR ROUTINES CHECK RUDDER CLEARANCE.

2

-

-

... More
5 RUDDER NR ROUTINES TIGHT ALL BOLTS AND THEIR LOCKING ARRANGEMENT AND CHANGE DAMAGE BOLT

10

-

-

... More
6 RUDDER SPECIFIC DEFECT RENEW THE GLAND TIGHTNING BOLTS OF RUDDER.

6

-

-

... More
7 RUDDER SPECIFIC DEFECT RENEW GLAND PACKING AND PROVE FOR NO ANY LEAKAGES

2

-

-

... More
8 STEERING GEAR MAKE - GEETA ENGG (OEM CERTIFICATION REQUIRED) NR ROUTINES CHANGE HYDAULIC OIL (100 LTRS) CLEAN STORAGE AND SERVICE TANKCHANGE OIL FILTERS (04 NOS) RECTIFY ALL THE SYSTEM PIPELINE LEAKAGES. (06 NOS) CHECK ALIGNMENT OF RUDDER ANGLE INDICATOR, RENEW FAULTY INDICATOR MISC RENEW SOLENOID VALVES (02 NOS) CHECK FUNCTIONAL TEST OF STEERING GEAR FOR SATISFACTORY PERFORMANCE 02 NOS)

2

-

-

... More
9 SHAFTING NR ROUTINES CHECK SHAFT ALIGNMENT

2

-

-

... More
10 SHAFTING NR ROUTINES CHECK CLEARANCE OF PLUMBER BLOCKS.

6

-

-

... More
11 SHAFTING NR ROUTINES CLEANING OF SHAFT AND APPLY PROTECTIVE COATING.

2

-

-

... More
12 SHAFTING NR ROUTINES FUNCTIONALCHECKS AND REPAIR OF LOCKING ARRANGEMENT/SHAFT BRAKE.

2

-

-

... More
13 SHAFTING NR ROUTINES CHECK COUPLING BOLTS FOR TIGHTNESS

30

-

-

... More
14 INBOARD SEAL NR ROUTINES CHECK ALIGNMENT OF INBOUND SEAL

2

-

-

... More
15 INBOARD SEAL NR ROUTINES CHECK INFLATION CHECKS OF EMERGENCY SEAL WITH AIR PRESSURE.

2

-

-

... More
16 INBOARD SEAL NR ROUTINES CHECK COOLING WATER FLOW OF INBOARD SEAL

2

-

-

... More
17 PROPELLER QTY - 02 NR ROUTINES CLEANIG AND GREASING OF PROPELLER TO BE CARRIED OUT. CHECK FOR ANY DAMAGE/ PITTING. REPAIR AS REQUIRED.

2

-

-

... More
18 02 IN NOS DIESEL ALTERNATOR MAKE-KIRLOSKAR MODEL- 6R- 1080 TA (OEM CERTIFICATION REQUIRED) 9000 HRLY CHANGE ENGINE OIL AND LUB OIL FILTER CARTRIDGES.(200 LTRS) REPLACE FUEL FILTER CARTRIDGE (08 NOS) CARRY OUT CLEANING OF FUEL STRAINER OF FUEL FEED PUMP (02 NOS) CHANGE DRIVE BELTS AND ADJUST TENSION (10 NOS) CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF HEAT EXCHANGER (02 NOS) CARRY OUT CLEANING OF CENTRIFUGE CLEANER (02 NOS) CHECK THE VALVE CLEARANCE AND ADJUST IF REQUIRED (02 NOS) CALIBRATE FUEL INJECTORS (24 NOS) REPLACE 05 NOS INJECTORS (12 NOS) INSPECT/CLEAN TURBOCHARGER (05 NOS) OVERHAUL/REPLACE THE STARTER (04 NOS) REPLACE ALL THE FLEXIBLE HOSES AND DURETTES. (02 NOS) REPLACE THE ANTI VIBRATION MOUNTS. (20 NOS) CARRY OUT CHEMICAL CLEANING AND PRESSURE TESTING OF CHARGE AIR COOLER CARRY OUT VISUAL EXAMINATION OF ENGINE FOR CLEANLINESS AND LEAKAGES, IF ANY. RECTIFY THEM. (02 NOS) CHANGE THE COOLANT (100 LTRS) FUNCTIONING OF THERMOSTAT. REPLACE IF FOUND DEFECTIVE. (04 NOS) CARRY OUT REPLACEMENT OF DRY TYPE AIR CLEANERINSPECT/REPLACE THE CONNECTING ROD BEARING(02 NOS) REPLACE THE PISTON RINGS (02 NOS) CARRY OUT OVERHAULING OF FRESH WATER PUMPCARRY OUT OVERHAULING OF SEA WATER PUMP (04 NOS) RENEW HOT LAGGING.LENGTH 10 MTRS (10 MTRS) CHECK AND CALIBRATE ENGINE SENSORS,SWITCHES AND PRESSURE GAUGES REPLACE THE FAULTY COMPONENTS. UNDERTAKE SAFETY DEVICES CHECKS (02 NOS) CLEAN EXHAUST SILENCER 04 NOS) CARRY OUT FUNCTIONAL TEST OF BOTH DA CONTROL SYSTEM AND REPAIR/REPLACE FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL GAUGES AND CARRYOUT SAFETY DEVICES CHECKS.CARRY OUT FUNCTIONAL TEST OF BOTH DA CONTROL SYSTEM AND REPAIR/REPLACE FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL GAUGES AND CARRYOUT SAFETY DEVICES CHECKS. STBD DA - OIL LEAKAGE OBSERVED FROM FLYWHEEL INBOARD SEAL AND DEFECT TO BE RECTIFIED .

2

-

-

... More
19 EMERGENCY DIESEL ALTERNATOR MAKE- KIRLOSKAR CAPACITY 6.5 KV (OEM CERTIFICATION REQUIRED) NR ROUTINES CHANGE FUEL AND LUB OIL FILTER. (10 NOS) CHANGE LUB OIL. (100 LTRS) CALIBRATE/REPLACE INJECTORS. ADJUST VALVE SETTINGS. (04 NOS) CHANGE FAN BELT AND ADJUST TENSION. (04 NOS) CONTROL SYSTEM IS MALFUCTIONING, TO BE RECTIFIED AND PROVED. 01 NOS) OVERHAULING OF STARTER TO BE CARRIED OUT. (01 NOS)

10

-

-

... More
20 01 IN NO FUEL CENTRIFUGE MAKE- ALFA LAVAL TYPE- MAB 103B-24 NR ROUTINES INSPECT WORM WHEEL SHAFT AND GEAR HOUSING (10 NOS) CHECK WORM WHEEL AND WORM (100 LTR) RENEW OIL LEVEL IN GEAR HOUSING (04 NOS) CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE .(04 NOS) RENEW O RING AND SEALIN (04 NOS) GCARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS DEFECTIVE RENEW O RING AND SEALING MISC CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS DEFECTIVE (01 NOS)

1

-

-

... More
21 20 TPH SUBMERSIBLE PUMP MODEL-M120N(M) QTY - 04 NR ROUTINES EXAMINE INTERNAL WEAR (04 NOS) CHECK RUNNING CLERANCE (04 NOS) CHANGE MECHANICAL SEAL (04 NOS) CHECK DIFFUSER FOR WEAR AND CLERANCE (04 NOS)

4

-

-

... More
22 37 TPH DIESEL DRIVEN PUMP MODEL- SH65-16N1-DG S2-316 QTY - 02 NR ROUTINES CALIBRATE INJECTION NOZZLE OVERHAUL INJECTION PUMP ADJUST VALVE CLERANCE OF INTAKE AND EXHAUST VALVE CHECK THE SURFACE OF BRUSH AND SLIP RING REPLACE FUEL PIPING

2

-

-

... More
27 CO2 SYSTEM NR ROUTINES CARRY OUT WEIGHING OF CO2 BOTTLES. REFILL BOTTLES IF NET LOSS OF MORE THAN 10%, BOTTLES TO BE REFILLED IT SHALL BE REFILLED AFTER PRESSURE TESTING UPTO 1.5 TIMES OF WORKING PRESSURE.QTY- 02 IN NOS. CALIBRATE ALL PRESSURE SWITCHES AND GAUGES. CLEAN ALL NOZZLES. CARRYOUT FUNCTIONAL TEST WITH LP AIR.

2

-

-

... More
28 OILY BILGE SEPERATOR, MAKE - VICTOR (OEM CERTIFICATION REQUIRED) YEARLY CARRY OUT FUNCTIONAL CHECKS OF EQUIPMENT, REPAIR/ RENEW COMPONENT AS NECESSARY. PROVE THE EQUIPMENT FOR SATICFACTORY PERFORMANCE. (01 NOS) CALIBTARE ALL SENSOR AND GAUGES. RENEW AS REQUIRED. (10 NOS)

1

-

-

... More
29 AIR COMPRESSOR MAKE - INGERSOLL TYPE- RECIPROCATING MODEL- 7T4 NR ROUTINES DISMANTLE THE COMPRESSOR FROM FOUNDATION AND SHIFT IT TO THE SHOP FLOOR. CARRY OUT DECARBONISING AND DEGREASING WHILE COMPLETELY DISMANTLING THE COMPRESSOR TO COMPONENT LEVEL. UNDERTAKE GAUGING OF EACH COMPONENT TO CONFIRM THE DIMENSIONS . CARRYOUT NDT CRACK DETECTION TEST ON PISTON, CONNECTING ROD, CONROD , LINER,VALVE PLATES AND CRANKSHAFT BEFORE REUSING THE SAME. IN CASE OF ANY DEFECT , RENEW THE COMPONENT RENEW ALL GASKETS/JOINTS/O RINGS WHILE REASSEMBLING THE COMMPRESSOR AND THE ASSOCIATED COMPRESSOR PIPE LINE. CARRY OUT TEST BED TRIALS TO CONFIRM DESIGN SPECIFICATIONS. OVERHAUL/REPLACE AND RECALIBRATE ALL INSTRUMENTION,SAFETY CUTOUTS AND ASSOCIATED CONTROLS/ PANELS. RENEW SV MOUNTS, FOUNDATION BOLTS. CARRY OUT ALIGNMENT OF THE MOTOR AND THE COMPRESSOR. UNDERTAKE CAPACITY TRIALS OF THE COMPRESSOR UNDER GIVEN LOAD CONDITIONS. CALIBRATE/REPLACE ALL INJECTORS, RENEW NOZZLES CALIBRATE FIP. CHANGE LUB OIL AND LUB OIL FILTER CHANGE FUEL FILTER CALIBRATE/REPLACE ALL INJECTORS, RENEW NOZZLES

2

-

-

... More
30 DD ENGINE NR ROUTINES CALIBRATE FIP. CHANGE LUB OIL AND LUB OIL FILTER CHANGE FUEL FILTER REPLACE BELT. ADJUST BELT TENSION.

2

-

-

... More
31 AIR BOTTLES NR ROUTINES PRESSURE TESTING OF AIR BOTTLES TO BE CARRIED OUT UPTO 45 KG/CM2.QTY- 02 IN NOS, CAPACITY- 300 LTRS

2

-

-

... More
32 HP AIR SYSTEM VALVES NR ROUTINES 08 IN NO. AIR BOTTLE VALVES NOT HOLDING. TO BE REPLACED. TYPE- NEEDLE VALVE

8

-

-

... More
33 HP AIR SYSTEM VALVES NR ROUTINES HP AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 30 MM ,QTY- 10,TEST PRESSURE-60 PSI.

10

-

-

... More
34 HP AIR SYSTEM VALVES NR ROUTINES HP AIR SYSTEM PIPE LINES THINNED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED. WORK INVOLVES REMOVAL/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS AND FLANGE GASKETS TO BE RENEWED(MS).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING MAT- SS , SIZE- 50 MM ,LENGTH-20 MTR,TEST PRESSURE-500 PSI.

20

-

-

... More
35 STARTING AIR SYSTEM NR ROUTINES MAIN ENGINE STARTING AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 50 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
36 ADVANCED FIRE DETECTION SYSTEM NR ROUTINES FUNCTIONAL CHECKS OF ADVANCED FIRE DETECTION SYSTEM TO BE CARRIED OUT AND PROVED FOR SATISFACTORY PERFORMANCE. REPAIR/ RENEWAL OF COMPONENTS IF NECESSARY. DEFECTIVE SMOKE SENSOR TO BE REPLACED.

1

-

-

... More
37 FIRE MAIN SYSTEM VALVES NR ROUTINES FOLOWING FIRE MAIN SYSTEM DISCHARGE VALVES NOT HOLDING. TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/ OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING. TYPE-ANGLE VALVE, SIZE- 90MM, QTY-04, NOS TYPE- FLAP VALVE DIA- 15 MM,QTY- 06 NOS TYPE- GATE VALVE DIA- 25MM, QTY- 06 IN NOS, LOCATION- SCATTERED

16

-

-

... More
38 FIRE MAIN SYSTEM VALVES NR ROUTINES FOLOWING FIRE MAIN SYSTEM DISCHARGE VALVES NOT HOLDING. TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/ OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING. TYPE-ANGLE VALVE, SIZE- 90MM, QTY-04, NOS TYPE- FLAP VALVE DIA- 15 MM,QTY- 06 NOS TYPE- GATE VALVE DIA- 25MM, QTY- 06 IN NOS, LOCATION- SCATTERED

16

-

-

... More
39 FIRE MAIN SYSTEM ISOLATING VALVES SPECIFIC DEFECT 04 IN NOS FIREMAIN ISOLATING VALVE HOT HOLDING. TO BE REPLACED

4

-

-

... More
40 INSTRUMENTATION GAUGES NR ROUTINES 20 IN NOS SUCTION PRESSURE GAUGES, RANGE -0 TO 1 KG/CM2 AND 20 IN NOS DISCHARGE PRESSURE GAUGE, RANGE - 0 TO 10 KG/CM2 NOT SHOWING PRESSURE, GAUGE TO BE RENEWED.

25

-

-

... More
41 INSTRUMENTATION GAUGE PIPE LINES NR ROUTINES INSTRUMENTATION PIPE LINES OF VARIOUS MACHINERIES HOLED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED INCLUDING END FITTINGS. LENGTH- 25 MTR, SIZE-8 / 10 MM.

25

-

-

... More
42 HAND PUMPS NR ROUTINES 07 IN NOS HAND PUMPS NOT OPERATING. PUMPS TO BE OVERHAULED. LOCATION- SCATTERED, TYPE- SEMI ROTARY, CAP- 90 LTRS/ MIN.

7

-

-

... More
43 BILGE WATER SYSTEM SPECIFIC DEFECT BILGE PP NOT TAKING SUCTION FROM 4 MEN CREW MESS BOTH SIDE. SYSTEM TO BE PROVED

1

-

-

... More
44 BILGE WATER SYSTEM SPECIFIC DEFECT BILGE PP NOT TAKING SUCTION FROM STEERING GEAR COMPT BOTH SIDE. SYSTEM TO BE PROVED

1

-

-

... More
45 BILGE WATER SYSTEM SPECIFIC DEFECT 13 IN NOS VALVES OF BILGE PUMPING OUT TO BE OVERHAULED/REPLACED. LOCATION SCATTERED, DIA - 65 MM

13

-

-

... More
46 SEA WATER SYSTEM NR ROUTINES CLEAN/INSPECT SEA CHEST VALVES AND STRAINERS OF MAIN ENGINES AND DIESEL ALTERNATORS, REPAIR AS NECESSARY, BUTTER FLY VALVE QTY- 02, SIZE- 65 MM, ANGLE VALVE QTY- 02 IN NOS, SIZE- 65 MM

4

-

-

... More
47 SEA WATER SYSTEM NR ROUTINES INSPECT/REPLACE ZINC RODS/ CORROSION PLUGS ON SEA WATER SYSTEM

30

-

-

... More
48 SEA WATER SYSTEM SPECIFIC DEFECT MAIN SEA CHEST STRAINER ELEMENTS GOT PERISHED. TO BE RENEWED QTY 02 ,MAT SS

2

-

-

... More
49 SEA WATER SYSTEM SPECIFIC DEFECT SEA CHEST AIR VENT LINE OF BOTH SEA CHEST CORRODED AND PERISHED. PIPE LINE TO BE RENEWED.

2

-

-

... More
50 MAIN ENGINE SEA WATER PUMP NR ROUTINES BOTH MAIN ENGINE SEA WATER PUMP TO BE OVERHAULED WITH SPARES AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
51 MAIN ENGINE SEA WATER PUMP SPECIFIC DEFECT BOTH MAIN ENGINE SEA WATER PUMP TO BE SECURED WITH SECURING BRAKETS ALONGWITH SUCTION AND DISCHARGE PIPES.

2

-

-

... More
52 MAIN ENGINE SEA WATER SYSTEM NR ROUTINES BOTH MAIN ENGINE SEA WATER OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
53 MAIN ENGINE SEA WATER SYSTEM PIPE LINE NR ROUTINES BOTH MAIN ENGINE SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 80 MM , LENGTH - 20 MTRS, MAT - CUNI

20

-

-

... More
54 DIESEL ALTERNATOR SEA WATER PUMP NR ROUTINES BOTH DA SEA WATER PUMP TO BE OVERHAULED WITH SPARES AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
55 DIESEL ALTERNATOR SEA WATER SYSTEM NR ROUTINES BOTH DA SEA WATER SYSTEM OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
56 DIESEL ALTERNATOR SEA WATER SYSTEM PIPE LINE NR ROUTINES BOTH DA SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - CUNI

20

-

-

... More
57 MAIN ENGINE FUEL SYSTEM VALVES NR ROUTINES BOTH MAIN ENGINE FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 60 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
58 DA FUEL SYSTEM VALVES NR ROUTINES BOTH D/A FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 60 MM ,QTY- 02,TEST PRESSURE-60 PSI.

2

-

-

... More
59 GS PUMP NR ROUTINES PUMP DEVELOPING LOW PRESSURE. PUMP TO BE OVERHAULED. CHANGE ALL DEFECTIVE (01 nos) COMPONENTS. COUPLING PADS AND BOLTS TO BE CHANGED. ALIGNMENT TO BE DONE AFTER OVERHAULING. QTY - 01 REPLACE THE PUMP IF DECLARED BER. SUCTION AND DISCHARGE PRESSURE GAUGE TO BE CALIBRATED, REPLACE IF FOUND NOT REPAIRABLE. PUMP FOUNDATION CORRODED. TO BE RENEWED. QTY - 01

1

-

-

... More
60 FUEL TRANSFER PUMP NR ROUTINES 02 FUEL TRANSFER PUMP TO BE OVERHAULED WITH SPARES INCLUDING REMOVAL , FITTMENT AND TRIAL

2

-

-

... More
61 FUEL SYSTEM VALVES NR ROUTINES FOLLOWING VALVES NOT HOLDING, TO BE OVERHAULED. (A) PORT RU TANK SUCTION VALVE , (B) FUEL CENTRIFUGE BY PASS VALVE, (C) STBD STORAGE TANK MAIN SUCTION QUICK CLOSING VALVE, QTY- 02, SIZE- 50 MM (D) SDNR VALVE, QTY- 06 IN NOS , SIZE- 32 MM (E) NON RETURN VALVE, QTY- 04 IN NOS, SIZE- 20 MM (F) BALL VALVE, QTY - 06 NOS, SIZE 20 MM (G) FUEL TRANSFER PUMP SUCTION AND DISCHARGE VALVE - QTY 04 , DIA - 40 MM

24

-

-

... More
62 QUICK SHUT OFF VALVES NR ROUTINES 04 QUICK TO BE OVERHAUL AND CABLE WIRE OF ALL QUICK SHUT OFF VALVE TO BE REPAIRED/RENEWD INCLUDING RENEWAL/ REPAIR OF ALL MOVABLE COMPONETS AND APPLICATION OF LUBRICANT.

4

-

-

... More
63 FUEL STORAGE TANK NR ROUTINES 02 IN NO. FUEL STORAGE TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES: (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
64 FUEL RU TANK NR ROUTINES 02 IN NOS. MAIN ENGINE FUEL RU TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
65 FUEL RU TANK SPECIFIC DEFECT DRAIN VALVE OF BOTH FUEL TANK NOT HOLDING. VALVE TO BE RENEWD.

2

-

-

... More
66 FRESH WATER STORAGE TANK NR ROUTINES 02 IN NOS. FRESH WATER STORAGE TANK TO BE CLEANED, SURFACE PREPARED AND PAINTED. (01 COAT EROP, 02 COATS OF COLD BITUMINOUS.WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

2

-

-

... More
67 DOMESTIC FRESH WATER PUMP NR ROUTINES BOTH DOMESTIC FRESH WATER PUMP TO BE OVERHAULED WITH SPARES AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
68 DOMESTIC FRESH WATER SYSTEM PIPE LINE NR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST FRESH WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - MS

20

-

-

... More
69 DOMESTIC SEA WATER SYSTEM PIPE LINE NR ROUTINES CHEMICALLY CLEAN AND PRESSURE TEST DOMESTIC SEA WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - CU NI

20

-

-

... More
70 FUEL FILLING SYSTEM VALVES NR ROUTINES 02 IN NOS FUEL FILLING VALVE TO BE OVERHAULED. LOCATION - SCATTERED.

2

-

-

... More
71 FRESH WATER FILLING HYDRENT NR ROUTINES FRESH WATER FILLING HYDRENT PIPE LINE AND HYDRENT TO BE REPAIRED/ RENEWED.

2

-

-

... More
72 DURETTES NR ROUTINES DURETTES OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND PERISHED, TO BE RENEWED . ALL SECURING JUBILEE CLIPS/ CLAMPS TO BE RENEWED. Dia (mm) Length (mtr) 25 6 50 8 76 12 100 8 130 6

1

-

-

... More
73 BILGE NR ROUTINES BILGES OF MAIN ENGINE ,DA COMPARTMENT, STEERING GEAR COMPT AND 4 MEN MESS COMPARTMENT (BOTH SIIDES) TO BE CLEANED THROUGHLY AND TO BE PAINTED AS PER PAINT SCHEME.

2

-

-

... More
74 BILGE PLATES SPECIFIC DEFECT ALL BILGE PLATES TO BE SECURED WITH RUBBER COMMING,

1

-

-

... More
75 PAINTING SR ROUTINES ALL PIPE LINES, VALVES REPAIRED/RENEWED TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
76 GAUGE GLASS SPECIFIC DEFECT 02 IN NOS GAUGE GLASSES OF FUEL TANK AND FRESH WATER TANK TO BE RENEWED.

2

-

-

... More
77 MISCELLANEOUS MISC NUTS/ ADAPTORS OF VARIOUS SYSTEMS TO BE MANUFACTURED AS PER SAMPLE. MAT- BRASS, QTY - 40 NOS

40

-

-

... More
78 LAGGING LAGGING HOT LAGGING IS TO BE CARRIED OUT AT VARIOUS LOCATIONS. LENGTH- 07 MTRS

7

-

-

... More
79 TANK MANHOLES SPECIFIC DEFECT ALL TANK DOOR MANHOLES TO BE TIGHTENED WITH NEW NUTS AND BOLTS AND JOINT TO BE CHANGED.

1

-

-

... More
80 MISCELLANEOUS T HANDLES AND VALVE WHEELS MANUFACTURING OF T HANDLES AND VALVE WHEELS AS PER SAMPLES. QTY 10 EACH.

10

-

-

... More
81 MISCELLANEOUS SOUNDING CAP SOUNDING CAP NOT OPENING.SOUNDING CAP OF FUEL AND FW TANK TO BE REPAIRED.

4

-

-

... More
82 MISCELLANEOUS MISC MANUFACTURING OF PIPE LINES - (A) HYDRAULIC LINE OF STEERING GEAR. LENGTH 20 MTRS, DIA 15 MM, MAT MS (B)FUEL LINE FROM RU TANK TO BOTH MAIN ENGINE AND DA. LENGTH 25 MTRS, DIA 15 MM, MAT SS (C) FUEL TANK FILLING LINE. LENGTH 15 MTRS, DIA 100 MM , MAT MS

70

-

-

... More
ELECTRICAL

-

-

-

... More
1 ALTERNATORS MAKE - KIRLOSKAR QTY -02 & EMERGENCY DA ALTERNATOR, (8.8 KW) (1), QTY -03 OVERHAULING OF ALTERNATOR TO BE CARRIED OUT. BOTH INTERIOR & EXTERIOR PARTS OF THE MACHINE TO BE CLEAN WITH WHITE SPIRIT AND BLOWN WITH HOT AIR. REMOVE OIL AND DUST FROM INTERNAL PARTS OF ALTERNATOR. RENEWED BEARING CLEANING / VARNISHING OF STATOR WINDING. ALIGNMENT OF ALTERNATOR TO BE CARRIED OUT POST FITMENT OF ALTERNATOR. POST OVERHAULING AND FITMENT CHECK FOR INSULATION. INSULATION TO BE CHECKED BY MEGGER TERMINAL WITH RESPECT TO EARTH/BODY (MINIMUM INSULATION ACCEPTABLE IS 2 MEGA OHM).

3

-

-

... More
2 ALTERNATORS MAKE - KIRLOSKAR QTY -02 BOTH DIESEL ALTERNATORS ENGINE CONTROL PANELS AND ALARM PANELS MALFUNCTIONING TO BE OVERHAULED (I) INDICATION LAMPS DEFECTIVE. TO BE RENEWED.

6

-

-

... More
3 ALTERNATORS MAKE - KIRLOSKAR QTY -03 (II) PUSH BUTTONS DEFECTIVE. TO BE RENEWED.

6

-

-

... More
4 ALTERNATORS MAKE - KIRLOSKAR QTY -04 (III)ROTARY SWITCH DEFECTIVE TO BE RENEWED.

4

-

-

... More
5 ALTERNATORS MAKE - KIRLOSKAR QTY -02 OVER SPEED PROTECTION OF DIGITAL COUNTER NOT WORKING TO BE RENEWED.(QTY - 02).

2

-

-

... More
6 ALTERNATORS MAKE - KIRLOSKAR QTY -03 AVR DEFECTIVE. TO BE REPLACED AS PER SAMPLE.

3

-

-

... More
7 DYNAMO (24 V DC) QTY-03 MAKE - KIRLOSKAR (OEM CERTIFICATION REQUIRED) PORT DA DYNAMO DEFECTIVE. TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

3

-

-

... More
8 SELF STARTER (24V DC) QTY -03 MAKE - KIRLOSKAR (OEM CERTIFICATION REQUIRED) STBD DA SELF STARTER (24V DC) DEFECTIVE TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

3

-

-

... More
9 MAIN SWITCH BOARD MAKE - MARINA ELECTRICALS CALIBRATION OF FOLLOWING METERS TO BE CARRIED OUT (I) VOLT METERS -04 (II) FREQ. METERS -03 (III) AMMETERS - 05 (IV) KW METERS -02 (V) INSULATION METER- 02(01M OHM,01 K OHM) (VI) POWER FACTOR METER - 02 (VII) DOUBLE VOLT METER -01 (VIII) DOUBLE FREQUENCY METER - 01 (IX) SYNCHRONISE METER - 01 (X)BOTH DA SUPPLY BREAKER TO BE CALIBRATED - 02 (XI)CALIBRATE SHORE SUPPLY BREAKER IN SWITCH BOARD - 01 (XII) PORT DA SUPPLY BREAKER DEFECTIVE. TO BE REPLACED- 01

1

-

-

... More
10 SHORE SUPPLY BOX MAKE - L & t (I) SHORE SUPPLY BREAKER IN SHORE SUPPLY BOX DEFECTIVE, TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

1

-

-

... More
11 SHORE SUPPLY BOX MAKE - L & t (II) SHORE SUPPLY BOX CORRODED/ DEFECTIVE TO BE RENEWED AS PER SAMPLE.

1

-

-

... More
12 SHORE SUPPLY BOX MAKE - L & t (III) INDICATION LAMPS TO BE RENEWED AS PER SAMPLE.

4

-

-

... More
13 SHORE SUPPLY BOX MAKE - L & t (IV) PUSH BUTTONS TO BE RENEWED AS PER SAMPLE.

5

-

-

... More
14 SHORE SUPPLY BOX MAKE - L & t (V) VOLTAGE METER DEFECTIVE. TO BE REPLACED AS PER SAMPLE.

1

-

-

... More
15 SHORE SUPPLY BOX MAKE - L & t (VI) PHASE SEQUENCE METER DEFECTIVE TO BE REPLACED AS PER SAMPLE.

1

-

-

... More
16 SHORE SUPPLY BOX MAKE - L & t (VII) ROTARY SWITCH TO BE REPLACED AS PER SAMPLE.

1

-

-

... More
17 SHORE SUPPLY CABLE SHORE SUPPLY CABLE DEFECTIVE. TO BE REPLACED WITH NEW ONE AS PER SAMPLE. LENGTH-100MTR. CABLE SPECS-( 3 CORE X 35 SQ MM)

100

-

-

... More
18 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) CONTROL PANELS OF COMPLETE STEERING GEAR SYSTEM TO BE OVERHAULED.SYSTEM TO BE PROVED FOR SATISFACTORY FUNCTIONING. (I)PUSH BUTTONS DEFECTIVE. TO BE REPLACED.

6

-

-

... More
19 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (II) INDICATIONS DEFECTIVE. TO BE REPLACED.

6

-

-

... More
20 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (III) ALL RELAYS TO BE CHANGED.

12

-

-

... More
21 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (IV) ROTARY SWITCH TO BE CHANGED AS PER SAMPLE.

4

-

-

... More
22 STEERING GEAR SYSTEM MAKE - GEETA ENGG WORKS PVT LTD (OEM CERTIFICATION REQUIRED) (V) RUDDER ANGLE INDICATOR DISPLAY UNIT DEFECTIVE, TO BE REPLACED WITH NEW ONE AS PER SAMPLE. QTY- 04

4

-

-

... More
23 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE FOLLOWING MOTORS TO BE OVERHAULED. BEARING TO BE RENEWED AND PROVE FOR SATISFACTORY PERFORMANCE. (I)BILGE PUMP (QTY-2)

2

-

-

... More
24 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (II)FIRE PUMP (QTY-2)

2

-

-

... More
25 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (III)AIR COMPRESSOR(QTY-1)

1

-

-

... More
26 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (IV)STEERING GEAR (QTY-4)

4

-

-

... More
27 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (V)FUEL TRANSFER PUMP (QTY-2)

2

-

-

... More
28 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (VI)FRESH WATER MOTOR (QTY-2)

2

-

-

... More
29 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (VII)BOAT DAVIT MOTOR (QTY-1)

1

-

-

... More
30 ELECTRICAL MOTORS MAKE - BHARAT BHIJLEE (VIII) ANCHOR WINDLASS MOTOR (QTY-02)

2

-

-

... More
31 VENTILATION MOTORS MAKE - BHARAT BHIJLEE FOLLOWING VENTILATION MOTORS TO BE OVERHAULED . BEARING TO BE RENEWED AND PROVE FOR SATISFACTORY PERFORMANCE. (I)E/R EXHAUST FAN (QTY - 02)

2

-

-

... More
32 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (II)E/R SUPPLY FAN (QTY - 02)

2

-

-

... More
33 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (III)GALLEY EXHAUST FAN (QTY - 01)

1

-

-

... More
34 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (IV)GALLEY SUPPLY FAN (QTY - 01)

1

-

-

... More
35 VENTILATION MOTORS MAKE - BHARAT BHIJLEE (V)CREW MESS SUPPLY FAN (QTY-1)

1

-

-

... More
36 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) FOLLOWING STARTERS AND CONTROL PANELS TO BE REPAIRED AND SAFETY PROTECTION TO BE CALIBRATED AS PER MOTOR RATED CURRENT.ELECTRICAL CONNECTIONS AND FASTENERS ARE TO BE TIGHTENED ON COMPLETION OF OVERHAULING, THE INSULATION OF ENTIRE SYSTEM TO BE CHECKED - BY A MEGGER - WITH RESPECT TO EARTH / BODY, MINIMUM INSULATION ACCEPTABLE IS 2 MEGA OHM. OVERHAULING OF A STARTER PANEL WOULD INVOLVE THE FOLLOWING:- (I). DEFECTIVE INTERNAL WIRING AND ALONG WITH ASSOCIATED TERMINALS, LUGS, ETC.TO BE REPLACED

50

-

-

... More
37 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (II) OVERLOAD RELAYS (OLR) , CONTACTORS & RELAYS ARE TO BE RENEWED WITH NEW ONE AS PER SAMPLE.

10

-

-

... More
38 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (III) INDICATION LAMPS DEFECTIVE TO BE REPLACED WITH NEW LED INDICATION LAMPS.

10

-

-

... More
39 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (IV). ROTARY SWITCHES DEFECTIVE OF STARTER PANEL TO BE REPLACED.

7

-

-

... More
40 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (V)PUSH BUTTONS DEFECTIVE TO BE CHANGED AS PER SAMPLE.

7

-

-

... More
41 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (VI).AIR COMPRESSOR STARTER - 01

1

-

-

... More
42 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (VII)FUEL TRANSFER PUMP STARTER - 02

2

-

-

... More
43 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (VIII)FRESH WATER PUMP STARTER - 02

2

-

-

... More
44 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (IX)SEA WATER PUMP STARTER - 02

2

-

-

... More
45 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (X)BILGE PUMP STARTER - 02

2

-

-

... More
46 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XI)ENGINE ROOM SUPPLY FAN STARTER - 02

2

-

-

... More
47 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) ENGINE ROOM EXHAUST FAN STARTER - 02

2

-

-

... More
48 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XII)STEERING GEAR STARTER (QTY-4)

4

-

-

... More
49 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XIII)BOAT DAVIT STARTER (QTY-1)

1

-

-

... More
50 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XIV)ENGINE CONTROL PANEL (QTY-2)

2

-

-

... More
51 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XV)ANCHOR WINDLASS STARTER (QTY-2)

2

-

-

... More
52 STARTER AND CONTROL PANEL MAKE - L & T (OEM CERTIFICATION REQUIRED) (XVI) EMERGENCY DA STARTER PANEL(QTY-01)

1

-

-

... More
53 FIRE ALARM SYSTEM MAKE - SHM SHIP CARE SERVICIABILITY CHECKS OF AFDS SYSTEM TO BE CARRIED OUT. SYSTEM TO BE PROVED POST OVERHAULING. (I)DEFECTIVE SENSORS TO BE REPLACED WITH NEW ONE. ALL SENSORS TO BE PROVED FOR SATISFACTORY FUNCTIONING.

5

-

-

... More
54 FIRE ALARM SYSTEM MAKE - SHM SHIP CARE (II) WIRING BETWEEN SENSOR AND CONTROL PANEL DEFECTIVE. TO BE REPLACED.

40

-

-

... More
55 FIRE ALARM SYSTEM MAKE - SHM SHIP CARE (III) PCB / RELAYS DEFECTIVE TO BE CHANGED AS PER SAMPLE.

1

-

-

... More
56 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS 01 IN NO TRANSFORMER BATTERY CHARGING RECTIFIER TO BE OVERHAULED 415V/24 V DC. CLEAN THE EQUIPMWNT WITH HOT BLOWER, ALCOHOL. PROVE THE BACK UP SUPPLY/EMERGENCY SUPPLY PROVE THE SYSTEM AFTER COMPLETION. (I) CHANGE ALL FUSES AND FUSE CARRIERS. .

1

-

-

... More
57 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (III) CONTACTOR AND MCCB DEFECTIVE REPLACE WITH NEW ONE.

2

-

-

... More
58 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (IV) REPLACE ROTARY SWITCH AS PER SAMPLE

2

-

-

... More
59 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (V) REPLACE PCB/RELAY WITH NEW ONE.

1

-

-

... More
60 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS CALIBRATION TO BE CARRIED OUT FOR THE FOLLOWING METERS. (I) VOLTMETER - 01

1

-

-

... More
61 TRANSFORMER RECTIFIER MAKE - RADIANT ELECTRONICS (II) AMMETER - 01

1

-

-

... More
62 WEATHER DECK LIGHT(CONICAL LIGHTS) MAKE - AJMERA ALL WEATHER DECK CONICAL LIGHT TO BE REPLACED WITH NEW LED FITTINGS. QTY-25

25

-

-

... More
63 BUNK LIGHT FITTING MAKE - AJMERA 20 IN NO BUNK LIGHTS NOT WORKING. (I) CHANGE ALL BUNK LIGHT WITH LED BUNK LIGHT.

20

-

-

... More
64 BUNK LIGHT FITTING MAKE - AJMERA (II) DEFECTIVE WIRING TO BE CHANGED AS PER REQUIREMENT.

30

-

-

... More
65 GENERAL LIGHTING(CUBICAL LIGHTS) MAKE - AJMERA ALL CUBICAL LIGHTS TO BE REPLACED WITH NEW LED FITTINGS. QTY-40

40

-

-

... More
66 GENERAL LIGHTING(20W TUBELIGHTS) MAKE - HAVELLS TUBE LIGHT FITTINGS(20W) DEFECTIVE TO BE REPLACED WITH NEW LED FITTINGS.QTY-20

20

-

-

... More
67 TALK BACK SYSTEM MAKE - AHUJA SERVICEABILITY CHECK OF TALK BACK SYSTEM FROM ENGINE ROOM TO WHEEL HOUSE NOT WORKING VIEW CABLE SHOWING OPEN CIRCUIT,CABLE TO BE REPLACED. SYSTEM TO BE PROVED POST OVERHAULING. (I) SPEAKERS DEFECTIVE REPLACE WITH NEW ONE. .

1

-

-

... More
68 TALK BACK SYSTEM MAKE - AHUJA (II) AMPLIFIER NOT GIVING OUTPUT TO BE RECTIFIED AND OUTPUT TO BE PROVED

1

-

-

... More
69 TALK BACK SYSTEM MAKE - AHUJA (III) WIRELESS RECEIVING UNIT IS DEFECTIVE. TO BE REPLACED WITH NEW ONE ALONG WITH WIRELESS MIKE.

1

-

-

... More
70 TALK BACK SYSTEM MAKE - AHUJA (IV) CABLES DEFECTIVE. NEW CABLE TO BE LAID.LENGTH APPROX- 600 MTR.

600

-

-

... More
71 TRANSFORMER 6KVA(415V/230V) MAKE - RADIANT ELECTRONICS 02 IN NO. LIGHTING TRANSFORMERS TO BE OVERHAULED. REWINDING OF BOTH TRANSFORMERS TO BE CARRIED OUT AND OUTPUT TO BE PROVED POST OVERHAULING.

2

-

-

... More
72 BATTERY BOX MAKE - SWL BATTERY BOX DEFECTIVE TO BE REPLACED WITH NEW BATTERY BOX.

4

-

-

... More
73 BATTERIES 12V 180 AH MAKE - EXIDE 10 IN NO 12V,180AH BATTERIES DEFECTIVE TO BE REPLACED WITH NEW BATTERIES. .

10

-

-

... More
74 NAVIGATION LIGHTS MAKE - HAVELLS (I) ALL NAVIGATION LIGHT FITTINGS TO BE REPLACED WITH NEW FITTINGS.QTY-10

10

-

-

... More
75 NAVIGATION LIGHTS MAKE - HAVELLS (II) WIRING OF NAVIGATION LIGHT IS DEFECTIVE, WIRING TO BE CHANGED FROM CONTROL PANNEL IN BRIDGE TO PARTICULAR LIGHT.(CABLE SPEC:- 02 CORE x 2 SQMM) .

70

-

-

... More
76 NAVIGATION LIGHTS MAKE - HAVELLS (III) CORRODED BASE OF NAVIGATION LIGHT FITTINGS TO REPLACED.

10

-

-

... More
77 NAVIGATION LIGHT CONTROL PANEL MAKE - RADIANT ELECTRONICS NAVIGATION LIGHTING PANEL TO BE COMPLETELY OVERHAULED INCLUDING REPLACEMENT OF ALL FUSES, RELAYS, CONTACTORS, INDICATIONS, ON/OFF SWITCHES FOR NAVIGATION LIGHTS AND PANEL TO BE CHECKED.REPLACE DEFECTIVE LIGHTS & SWITCHES.

12

-

-

... More
78 VHF SET(MAKE- SAILOR) 01 IN NO VHF SET NOT WORKING. TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

1

-

-

... More
79 CALL UP BELL MAKE - M/S LITESHINE (I) CALL UP BELL SYSTEM DEFECTIVE TO BE REPLACED WITH NEW ONE..

4

-

-

... More
80 CALL UP BELL MAKE - M/S LITESHINE (II) ELECTRIC BELL DEFECTIVE TO BE REPLACED.

4

-

-

... More
81 CALL UP BELL MAKE - M/S LITESHINE (III) PUSH BUTTONS AND INDICATIONS DEFECTIVE TO BE CHANGED.

4

-

-

... More
82 FLOOD LIGHTS MAKE - PHILIPS (I) 04 IN NO FLOOD LIGHT NOT WORKING, REPLACE WITH NEW LED LIGHT (200 W).

6

-

-

... More
83 FLOOD LIGHTS MAKE - PHILIPS (II) FLOOD LIGHT BASE DEFECTIVE, TO BE WELDED WITH NEW BASE.

6

-

-

... More
84 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD OVERHAULING OF GALLEY RANGE AND OVEN CONTROL PANEL TO BE CARRIED OUT. (I) HOT PLATE ASSEMBLY WITH ELEMENTS TO BE REPLACED WITH NEW ONE AS PER SAMPLE. (415V) QTY - HOT PLATE - 02 IN NOS,

2

-

-

... More
85 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (II)ELEMENTS - 08 IN NOS

8

-

-

... More
86 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (III) COMPLETE REWIRING OF GALLEY RANGE PANNEL AND OVEN TO BE CARRIED OUT WITH HEAT PROOF CABLE OF GOOD QUALITY.

50

-

-

... More
87 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (IV) ROTARY SWITCHES, INDICATIONS , MCBs, THERMOSTAT DEFECTIVE TO BE REPLACED.

5

-

-

... More
88 COOKING RANGE (05 KW)WITH OVEN THERMOSTAT CONTROL MAKE - KANTILAL & CHUNNILAL & SONS APPLIANCES PVT LTD (V) 415V SUPPLY SOCKET FOR GALLEY RANGE AND OVEN TO BE REPLACED WITH NEW ONE AS PER SAMPLE.

2

-

-

... More
89 RADAR MAKE - KODEN SERVICEABILITY CHECKS OF RADAR. RADAR NOT SHOWING HEADING, DEFECT TO BE RECTIFIED. PROVE IT SATISFACTORY.

1

-

-

... More
90 WINDOW WIPER MAKE - MEGHA ROTOTECH (P) LTD 02 IN NO. WINDOW WIPER NOT WORKING. COMPLETE WINDOW WIPER ASSEMBLY WITH MOTOR TO BE REPLACED WITH NEW ONE

2

-

-

... More
91 ECHO SOUNDER MAKE- JAPAN MARINA & CO LTD SERVICEABILITY CHECKS OF ECHO SOUNDER SYSTEM, PROVE IT SATISFACTORY.

1

-

-

... More
92 SEARCH LIGHT MAKE - HAVELLS 02 IN NO. SEARCH LIGHT NOT WORKING. (I) COMPLETE SEARCH LIGHT ASSEMBLY TO BE REPLACED WITH NEW ASSEMBLY .

2

-

-

... More
93 SEARCH LIGHT MAKE - HAVELLS (II) CORRODED BASE OF SEARCH LIGHT TO BE COMPLETELY CHANGED.

2

-

-

... More
94 SEARCH LIGHT MAKE - HAVELLS (III) CABLE FROM BRIDGE TO EACH SEARCH LIGHT TO BE CHANGED AS PER SAMPLE.

40

-

-

... More
95 32 AMPS SOCKET MAKE - HAVELLS 55 IN NO. 32 AMPS SOCKET DEFECTIVE IN PASSANGER HALL, MASTER CABIN, CREW CABIN, DINING HALL, GALLEY, ENGINEER CABIN,BRIDGE AND STORE ROOMS. THE SAME TO BE REPLACED WITH NEW SOCKETS.

55

-

-

... More
96 32 AMPS SWITCH MAKE - HAVELLS 55 IN NO. 32 AMPS SWITCH DEFECTIVE IN PASSENGER HALL, MASTER CABIN, CREW CABIN, DINING HALL, GALLEY, ENGINEER CABIN,BRIDGE AND STORE ROOMS. THE SAME TO BE REPLACED WITH NEW SWITCHES.

55

-

-

... More
97 SPLIT AC/ROOF AC MAKE - CARRIER 05 IN NO SPILT AC/ ROOF ACs NOT WORKING. OUTDOOR UNIT IS DEFECTIVE. SPLIT AC/ ROOF ACs TO BE REPLACED WITH NEW ONE.

5

-

-

... More
98 EMERGENCY LIGHTS MAKE - MANISH INDUSTRIES 24 V EMERGENCY LIGHT NOT OPERATIONAL.DEFECT TO BE RECTIFIED. DEFECTIVE BULBS TO BE CHANGED.BULB RATING(24V DC) ALL RELAYs DEFECTIVE REPLACE WITH NEW ONE. PROVE THE SYSTEM POST COMPLETION.

5

-

-

... More
99 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS OVERHAULING OF PORTABLE RECTIFIER CUM BATTERY CHARGER TO BE CARRIED OUT AND OUTPUT TO BE PROVED (RATING 230V/24V). CLEAN THE EQUIPMENT WITH HOT BLOWER AND ALCHOL.PROVE THE OUTPUT. (I) FUSES AND FUSE CARRIERS DEFECTIVE TO BE REPLACED.

8

-

-

... More
100 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (II) AMMETER DEFECTIVE TO BE RENEWED.

2

-

-

... More
101 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (III) VOLTMETER DEFECTIVE TO BE RENEWED.

2

-

-

... More
102 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (IV) REPLACEMENT OF ROTARY SWITCH AS PER SAMPLE.

4

-

-

... More
103 PORTABLE BATTERY CHARGER, QTY-02 MAKE - RADIANT ELECTRONICS (V) PCB / RELAY DEFECTIVE TO BE REPLACED.

2

-

-

... More
104 ELECRIC HORN MAKE - KHERAJ ELECTRIC HORN DEFECTIVE REPLACE WITH NEW ONE AS PER SAMPLE.

1

-

-

... More
105 AIR WHISTLE/ HORN CABLING OF AIR WHISTLE TO BE CARRIED OUT FROM WHEEL HOUSE PANEL TO BRIDGE TOP. (APPROX. LENGTH 50 MTR X 2 CORE)PROVE THE SYSTEM AFTER COMPLETION.

50

-

-

... More
106 AIR WHISTLE/ HORN SOLENOID VALVE DEFECTIVE.TO BE REPLACED.

1

-

-

... More
107 E.O.T (ENGINE ORDER TELEGRAPH) (I)E.O.T SYSTEM NOT WORKING PROPERLY. SYSTEM TO BE CHECKED AND DEFECT TO BE RECTIFIED. PROVE THE COMMUNICATION SYSTEM.

1

-

-

... More
108 E.O.T (ENGINE ORDER TELEGRAPH) (II) CHANGE THE DEFECTIVE DISPLAY IN ENGINE ROOM AND WHEEL HOUSE.

1

-

-

... More
109 WALL MOUNTED FAN MAKE - BAJAJ ALL WALL MOUNTED FAN TO BE REPLACED WITH NEW ONE.

17

-

-

... More
110 ROTARY SWITCH & SOCKET 415 V MAKE - HAVELLS ALL ROTARY SWITCH & SOCKET TO BE REPLACED WITH NEW AS PER SAMPLE. QTY - 03 IN NOS.

3

-

-

... More
111 PARTY DECK ROOF LIGHT MAKE - AJMER ALL PARTY DECK ROOF LIGHT TO BE REPLACED WITH NEW LED FITTINGS AS PER SAMPLE.

20

-

-

... More
112 GPS MAKE - JAPAN MARINA & CO LTD GPS NOT SHOWING PROPER LOCATION. TO BE REPLACED WITH NEW ONE.

1

-

-

... More
113 HF SET MAKE - THRANE & THRANE SERVICEABILITY CHECKS OF HF SET TO BE CARRIED OUT. PROVE THE OUTPUT POST OVERHAULING.

1

-

-

... More
114 REFRIGERATOR MAKE - LG - 200 LTR REFRIGERATOR NOT WORKING. TO BE REPLACED WITH NEW ONE.

2

-

-

... More
115 DEFREEZER MAKE - BLUE STAR 180 LTRS DEFREEZER NOT WORKING. TO BE REPLACED WITH NEW ONE.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.