Integrated Defence Staff Tender

To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Integrated Defence Staff - IDS Tender

Works
Machinery and Tools
Eprocure
Opening Date26 Jul 2022
Closing Date17 Aug 2022
Tender AmountRefer Documents 
Notes
Download

Summary

Nsry/com/2592/repair Rate Contract For Repair/ Routine Work On Pumps In Ships, Yard Crafts And Fdns

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ON BOARD TRIALS, INSPECTION OF PUMP AND MOTOR

-

-

-

... More
PUMP RATING (UPTO 10TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

7

-

-

... More
Disassembly of pump units and separation of pump and motor

7

-

-

... More
Recording of SPM readings of motor

4

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

1

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

4

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

7

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

7

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

4

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

7

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

7

-

-

... More
Inspection, repair and fitment of existing sleeve

7

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

3

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

5

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

4

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

15

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

3

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

5

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

7

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

7

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

7

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

6

-

-

... More
Renewal of SV mounts

7

-

-

... More
PUMP RATING (11-30 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

7

-

-

... More
Disassembly of pump units and separation of pump and motor

7

-

-

... More
Recording of SPM readings of motor

7

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

7

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

1

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

7

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

7

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

2

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

7

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

7

-

-

... More
Inspection, repair and fitment of existing sleeve

2

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

4

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

6

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

3

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

3

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

15

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

3

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

5

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

7

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

7

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

7

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

7

-

-

... More
Renewal of SV mounts

7

-

-

... More
PUMP RATING (31-50TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

5

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

1

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

3

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

3

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

3

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

3

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

5

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

3

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

2

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

3

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

5

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
PUMP RATING (51-80TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

3

-

-

... More
Disassembly of pump units and separation of pump and motor

3

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

2

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

3

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

3

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

3

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

3

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

3

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

2

-

-

... More
Inspection, repair and fitment of existing sleeve

2

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

2

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

3

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

2

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

20

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

3

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

3

-

-

... More
Shop testing procedure as per quality process sheet

3

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

3

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

5

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

5

-

-

... More
Renewal of SV mounts

3

-

-

... More
PUMP RATING (81-100TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

5

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

8

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Inspection, repair and fitment of existing sleeve

5

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

5

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

5

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

3

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

7

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

3

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

5

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

20

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

20

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
SEMI BLOCK (COUPLED ) PUMPS (HORIZONTAL AND VERTICAL)

-

-

-

... More
ON BOARD TRIALS, INSPECTION OF PUMP AND MOTOR

-

-

-

... More
PUMP RATING (UPTO 10TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

20

-

-

... More
Disassembly of pump units and separation of pump and motor

20

-

-

... More
Recording of SPM readings of motor

20

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

15

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

20

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

30

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

30

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

15

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

20

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

15

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

15

-

-

... More
Inspection, repair and fitment of existing sleeve.

15

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

15

-

-

... More
Cleaning and fitment of existing bearing.

20

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

20

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

11

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

20

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

8

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

15

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

30

-

-

... More
Shop testing procedure as per quality process sheet

15

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

20

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

30

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

30

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

8

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

10

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

10

-

-

... More
Renewal of SV mounts

20

-

-

... More
PUMP RATING (11-30 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

15

-

-

... More
Disassembly of pump units and separation of pump and motor

15

-

-

... More
Recording of SPM readings of motor

20

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

15

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

13

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

20

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

13

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

13

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

13

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

12

-

-

... More
Inspection, repair and fitment of existing sleeve.

10

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

10

-

-

... More
Cleaning and fitment of existing bearing.

20

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

8

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

15

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

15

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

8

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

30

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

7

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

13

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

20

-

-

... More
Shop testing procedure as per quality process sheet

10

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

20

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

20

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

20

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

10

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

10

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

5

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

15

-

-

... More
PUMP RATING (31-50TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

20

-

-

... More
Disassembly of pump units and separation of pump and motor

20

-

-

... More
Recording of SPM readings of motor

15

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

20

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

13

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

20

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

13

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

15

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

15

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

15

-

-

... More
Inspection, repair and fitment of existing sleeve.

15

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

15

-

-

... More
Cleaning and fitment of existing bearing.

20

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

20

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

10

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

10

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

10

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

15

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

20

-

-

... More
Shop testing procedure as per quality process sheet

15

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

20

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

20

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

20

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

15

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

10

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

8

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

8

-

-

... More
Renewal of SV mounts

20

-

-

... More
PUMP RATING(51-80TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

20

-

-

... More
Disassembly of pump units and separation of pump and motor

20

-

-

... More
Recording of SPM readings of motor

15

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

20

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

13

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

20

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

13

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

15

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

15

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

15

-

-

... More
Inspection, repair and fitment of existing sleeve.

15

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

15

-

-

... More
Cleaning and fitment of existing bearing.

20

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

20

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

10

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

15

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

10

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

15

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

20

-

-

... More
Shop testing procedure as per quality process sheet

15

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

20

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

20

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

20

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

15

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

10

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

15

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

15

-

-

... More
Renewal of SV mounts

15

-

-

... More
PUMP RATING (81-100TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

15

-

-

... More
Disassembly of pump units and separation of pump and motor

15

-

-

... More
Recording of SPM readings of motor

15

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

15

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

6

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

15

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

11

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

11

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

15

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

11

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

11

-

-

... More
Inspection, repair and fitment of existing sleeve.

11

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

11

-

-

... More
Cleaning and fitment of existing bearing.

8

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

15

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

15

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

10

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

8

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

8

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

15

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

8

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

125

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

15

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

25

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

15

-

-

... More
Shop testing procedure as per quality process sheet

15

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

15

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

15

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

15

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

10

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

10

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

10

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

10

-

-

... More
Renewal of SV mounts

10

-

-

... More
PUMP RATING (101-150TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

10

-

-

... More
Disassembly of pump units and separation of pump and motor

10

-

-

... More
Recording of SPM readings of motor

10

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

10

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

2

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

10

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

6

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

6

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

6

-

-

... More
Inspection, repair and fitment of existing sleeve.

6

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

6

-

-

... More
Cleaning and fitment of existing bearing.

5

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

10

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

5

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

125

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

10

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
Shop testing procedure as per quality process sheet

10

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

10

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

10

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

5

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

5

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
PUMP RATING (151-200TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

4

-

-

... More
Disassembly of pump units and separation of pump and motor

4

-

-

... More
Recording of SPM readings of motor

4

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

4

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

2

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

4

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

2

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

2

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

4

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

3

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

2

-

-

... More
Inspection, repair and fitment of existing sleeve.

3

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Cleaning and fitment of existing bearing.

2

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

4

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

2

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

3

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

4

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

4

-

-

... More
Shop testing procedure as per quality process sheet

4

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

4

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

4

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

4

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

5

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

2

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

2

-

-

... More
Renewal of SV mounts

4

-

-

... More
PUMP RATING (200TPH TO 350TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

4

-

-

... More
Disassembly of pump units and separation of pump and motor

4

-

-

... More
Recording of SPM readings of motor

4

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

4

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

2

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

4

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

2

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

2

-

-

... More
Run out measurement of shaft. Max allowed 0.05 mm

4

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

3

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

2

-

-

... More
Inspection, repair and fitment of existing sleeve.

3

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Cleaning and fitment of existing bearing.

2

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

4

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

2

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

3

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

25

-

-

... More
Dynamic balancing of pump rotables to GR 2.5 of ISO 1740

4

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

4

-

-

... More
Shop testing procedure as per quality process sheet

4

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

4

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

4

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

4

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

5

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

2

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

2

-

-

... More
Renewal of SV mounts

4

-

-

... More
POSITIVE DISPLACEMENT PUMP

-

-

-

... More
ON BOARD TRIALS, INSPECTION OF PUMP AND MOTOR

-

-

-

... More
PUMP RATING (UPTO 10 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

5

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

5

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

5

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Inspection, repair and fitment of existing sleeve.

5

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

5

-

-

... More
Cleaning and fitment of existing bearing.

5

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

10

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

5

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

8

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

8

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

20

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

5

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

5

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
PUMP RATING (11-30 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

5

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

5

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

5

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Inspection, repair and fitment of existing sleeve.

5

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

5

-

-

... More
Cleaning and fitment of existing bearing.

5

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

5

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

5

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

5

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

15

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

20

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

5

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

5

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
PUMP RATING (31-50 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

5

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

5

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

5

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Inspection, repair and fitment of existing sleeve.

3

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

4

-

-

... More
Cleaning and fitment of existing bearing.

4

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

10

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

5

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

20

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

5

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

5

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
PUMP RATING (51-80 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

5

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

5

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Inspection, repair and fitment of existing sleeve.

6

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

4

-

-

... More
Cleaning and fitment of existing bearing.

2

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

8

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

5

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

2

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

2

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
PUMP RATING (81-100 TPH)

-

-

-

... More
Joint trial onboard prior to removal and preparation of joint trial as per NSRY(PBR) format.

5

-

-

... More
Disassembly of pump units and separation of pump and motor

5

-

-

... More
Recording of SPM readings of motor

5

-

-

... More
Removal of pump (if decided by NSRY(PBR)) to shop floor and reinstallation of pump on completion of defect rectification/overhaul.

8

-

-

... More
Collection of pump from NSRY and return to NSRY on job completion

2

-

-

... More
Joint inspection of pump at shop floor on dismantling and preparation estimated scope of work.

5

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Run out measurement of shaft Max allowed 0.05 mm

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Inspection, repair and fitment of existing sleeve.

6

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

4

-

-

... More
Cleaning and fitment of existing bearing.

2

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

8

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

5

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
Repair/ dressing of threads of pump casing drain, pressure gauge tappings and gland cooling connections.

10

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
Shop testing procedure as per quality process sheet

5

-

-

... More
Alignment and fitment of pump onboard as per OEM manual.

5

-

-

... More
Preparation of overhaul report as per the NSRY(PBR) format

5

-

-

... More
Onboard trials and preparation of trial report as per NSRY(PBR) format

5

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Large scale repair to motor stool including removal/ transportation to shop floor and back and replacement of stool flange (material Carbon steel) and machining to acceptable tolerances.

2

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Repairs to Bearing housing by means of metal build up with corresponding base material/maching /renewal of sleeve as required.

5

-

-

... More
Repairs to seal housing by means of metal build up with corresponding base material/ machining/renewal of sleeve as required

5

-

-

... More
Renewal of SV mounts

5

-

-

... More
MATERIALS

-

-

-

... More
MONOBLOCK PUMPS (HORIZONTAL AND VERTICAL)

-

-

-

... More
ON BOARD TRIALS, INSPECTION OF PUMP AND MOTOR

-

-

-

... More
PUMP RATING (UPTO 10TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

4

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

5

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56 or equivalent of as decided by NSRY(PBR))

1

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

3

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

3

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

3

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

3

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

3

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

5

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

3

-

-

... More
PUMP RATING (11-30 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

4

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

5

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56 or equivalent of as decided by NSRY(PBR))

3

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

3

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

5

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

3

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

5

-

-

... More
PUMP RATING (31-50TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

3

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

3

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56 or equivalent of as decided by NSRY(PBR))

2

-

-

... More
Inspection, repair and fitment of existing sleeve

2

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Renewal of bearing (Cost of bearing to be quoted as per bearing OEM rate list - Copy of the same to be enclosed along with tender)

8

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

3

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

5

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

3

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

2

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

5

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

5

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

5

-

-

... More
PUMP RATING (51-80TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

3

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

3

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

2

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56 or equivalent of as decided by NSRY(PBR))

2

-

-

... More
Inspection, repair and fitment of existing sleeve

2

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Renewal of bearing (Cost of bearing to be quoted as per bearing OEM rate list - Copy of the same to be enclosed along with tender)

10

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

2

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

3

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

2

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

20

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

3

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

5

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

3

-

-

... More
PUMP RATING (81-100TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56 or equivalent of as decided by NSRY(PBR))

4

-

-

... More
Inspection, repair and fitment of existing sleeve

5

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

5

-

-

... More
Renewal of bearing (Cost of bearing to be quoted as per bearing OEM rate list - Copy of the same to be enclosed along with tender)

8

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing impeller (material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

2

-

-

... More
Renewal of impeller if required (material GM to BS 1400LG4C or AB to BS/1400AB1).

6

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

3

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland.

5

-

-

... More
Renewal of fasteners, washers, (material – Phospated MS to IS 226) and gland stud and nuts (material – AB to BS 2847 CA 104) gaskets (material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORKS

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

50

-

-

... More
Painting of Motor stool and other painted surfaces of the pump.

6

-

-

... More
SEMI BLOCK (COUPLED ) PUMPS (HORIZONTAL AND VERTICAL)

-

-

-

... More
ON BOARD TRIALS, INSPECTION OF PUMP AND MOTOR

-

-

-

... More
PUMP RATING (UPTO 10TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

10

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

10

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

10

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

20

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

6

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

10

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

30

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of Seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling shims/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING (11-30 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

10

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

10

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

10

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

10

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

4

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

4

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

30

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

20

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

10

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of Seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING (31-50TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

13

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

15

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

15

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

15

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

20

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

5

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

15

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

20

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

15

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of Seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING(51-80TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

20

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

13

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

15

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

15

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

15

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

20

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

20

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

20

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

10

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

15

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

20

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

20

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

15

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of Seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING (81-100TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

11

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

11

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

10

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

10

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

15

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

10

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

8

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

8

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

15

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

8

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

15

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

15

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

10

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of Seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING (101-150TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

6

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

6

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

6

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

6

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

10

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

5

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

10

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

5

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of Seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING (151-200TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

2

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

2

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

3

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

2

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

4

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

2

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

3

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

2

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

4

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

10

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

2

-

-

... More
Provisining and renewal of bearing housing

1

-

-

... More
Provisining and renewal of Seal housing

1

-

-

... More
Provisining and renewal of coupling unit

1

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

2

-

-

... More
PUMP RATING (above 200TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

2

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

2

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

3

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

2

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

2

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

3

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

4

-

-

... More
Minor repairs to existing impeller (Material GM to BS 1400LG4C or AB to BS/1400AB1) including machining fitment of new wearing rings to suit casing rings.

2

-

-

... More
Provisioning and Renewal with new impeller (material GM to BS 1400LG4C or AB to BS/1400AB1)

2

-

-

... More
Lapping of existing mechanical seal and renewal of rubber rings (material – neoprene rubber)

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

3

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

2

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

25

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

4

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

15

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

2

-

-

... More
Provisining and renewal of bearing housing

1

-

-

... More
Provisining and renewal of Seal housing

1

-

-

... More
Provisining and renewal of coupling unit

1

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

2

-

-

... More
POSITIVE DISPLACEMENT PUMP

-

-

-

... More
ON BOARD TRIALS, INSPECTION OF PUMP AND MOTOR

-

-

-

... More
PUMP RATING (UPTO 10 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

10

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

10

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

10

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

10

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

15

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

10

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

8

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

5

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

40

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

10

-

-

... More
Provisining and renewal of bearing housing

3

-

-

... More
Provisining and renewal of seal housing

3

-

-

... More
Provisining and renewal of coupling unit

3

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

10

-

-

... More
PUMP RATING (11-30 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

10

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

10

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

10

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

10

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

15

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

10

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

8

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

10

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

10

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

50

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

10

-

-

... More
Provisining and renewal of bearing housing

2

-

-

... More
Provisining and renewal of seal housing

2

-

-

... More
Provisining and renewal of coupling unit

5

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

5

-

-

... More
PUMP RATING (31-50 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

10

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

10

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

13

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

7

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

8

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

10

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

10

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

5

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

15

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

5

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

15

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

100

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

15

-

-

... More
Provisining and renewal of bearing housing

2

-

-

... More
Provisining and renewal of seal housing

2

-

-

... More
Provisining and renewal of coupling unit

4

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

5

-

-

... More
PUMP RATING (51-80 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

4

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

8

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

8

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

8

-

-

... More
Provisining and renewal of bearing housing

2

-

-

... More
Provisining and renewal of seal housing

2

-

-

... More
Provisining and renewal of coupling unit

2

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

4

-

-

... More
PUMP RATING (81-100 TPH)

-

-

-

... More
PUMP

-

-

-

... More
Chemical cleaning and minor/normal repair to the pump body including building up of material, mechanical smoothening/machining and cleaning. Material: GM to BS1400LG4C or AB to BS 1400AB1

5

-

-

... More
Extensive repairs to pump body/casing including large amount of metal build up and machining etc.

5

-

-

... More
Inspection of pump shaft. Buildup, machining preparation of ends, keyways and polishing surfaces. (Mat SS 316 or EN56)

6

-

-

... More
Manufacturing of new shaft (material – SS 316 or EN 56or equivalent of as decided by NSRY(PBR))

5

-

-

... More
Manufacturing and renewal of shaft sleeve/Bush in way of mechanical seal/gland and impeller (material – GM to BS 1400 LG4C or AB to BS 1400 AB1)

4

-

-

... More
Provisioning and Renewal of pump bearings as per rate list (bearings are to be same as those recommended by pump OEM and provided in OEM sealed cover with OEM certificate)

6

-

-

... More
Removal of worn sealing rings and manufacture of new rings and fitment and machining of sealing ring (Material BS 1400LB2)

10

-

-

... More
Minor repairs to existing Gears, impeller, screws, swash plate (as applicble) including machining and fitmrnt.

5

-

-

... More
Provisioning and Renewal with new Gears, impeller, screws, swash plate (as applicble) as per OEM specification

2

-

-

... More
Provisioning and renewal of mechanical seal from reputed make like Genseals, Durametalic (Flow Serve Sanmar) Eagle Poonawala etc. as per rate list.

8

-

-

... More
Repair of stuffing box/gland housing including building up and machining of gland. Gland packing with approved packing material.

2

-

-

... More
Renewal of stuffing box including buildup, machining and gland.

8

-

-

... More
Renewal of fasteners, washers, (Material – Phospated MS to IS 226) and gland stud and nuts (Material – AB to BS 2847 CA 104) gaskets (Material – Paronite) and gland packing. Provisioning two numbers paronite joints for connecting pump to the system pipes. If the pump is being handed over to NSRY these joints are to be secured to pump and handed over for the later fitment to ship staff.

50

-

-

... More
ASSEMBLY, INSPECTION AND TRIALS

-

-

-

... More
Assembly of pump, including minor works which are not mentioned above cover under general term overhaul of pump to restore the functional efficiency of the pump

10

-

-

... More
MISC WORK

-

-

-

... More
Replacement of adaptors for various connections, pressure gauge tappings, casing drain and zero discharge line (material - GM to BS 1400 LG4C or AB to BS 1400 AB1) (rate to be quoted for per adapter)

30

-

-

... More
Painting of motor, stool and other painted surfaces of the pump.

8

-

-

... More
Provisining and renewal of bearing housing

2

-

-

... More
Provisining and renewal of seal housing

2

-

-

... More
Provisining and renewal of coupling unit

2

-

-

... More
Provisining and renewal of coupling swins/ coupling pad/ bushes including coupling bolts

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.