To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Integrated Defence Staff - IDS Tender

Works
Civil And Construction
Eprocure
Opening Date11 Jun 2019
Closing Date2 Jul 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nsry/com/986 Short Refit Works Fb Pushpa

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GENERAL SERVICES FOLLOWING ADDITIONAL SERVICES TO BE PROVIDED DURING REFIT. 1. DRY DOCK FOR THE ENTIRE DURATION FOR UNDERWATER PACKAGE 2 OFFICE SPACE WITH ALL OFFICE AMENITIES INCLUDING TELEPHONE, POWER SUPPLY. 3. TOILET FACILITY NEAR DOCK FOR CREW. 4. REST ROOM FOR DUTY PERSONNEL (05 PERSONNEL APPROX). 5. JETTY CRANE, MOBILE CRANE, FORK LIFT FACILITY WHEREVER REQUIRED 6. TRANSPORT FOR TRANSFER OF PERSONNEL AND MATERIAL (01 LMV).

1

-

-

... More
TESTING OF WATER TIGHT COMPARTMENT ALL TANKS, COFFERDAMS AND SEA TUBES WHICH ARE REPAIRED BY BUILD UP/RENEWAL OR ARE SUBJECTED TO HOT WORK FOR WELDING OF PAD PIECE/ FOUNDATION ON ANY OF THEIR BOUNDARIES ARE TO BE AIR PRESSURE TESTED. THE PRESSURE APPLIED SHOULD NEVER EXCEED THAT WHICH CORRESPONDS TO A PRESSURE OF 0.2 KG/SQ CM (2 METERS OF WATER OR 0.20 BARS OR 2.1/2 IBF/ SQ IN).

1

-

-

... More
UNDER WATER PLATING ENTIRE UNDER WATER HULL AREA INCLUDING BOOT TOPING AREA TO BE CLEANED USING HIGH PRESSURE HYDRO JET . TO REMOVE MARINE GROWTH AND FOR FACILITATING HULL INSPECTION. (UNDER WATER AREA :U/W 678 SQMTR AND BOOT TOP AREA 68 SQ MTR)

746

-

-

... More
HULL SURVEY STEEL SHIP CARRY OUT SURVEY AND INSPECTION OF BOLLARDS/FAIRLEADS AND THE HULL STRUCTURE INCLUDING STIFFENING MEMBERS IN THE VICINITY WITH NON-DESTRUCTIVE TECHNIQUES, RENEW FITTINGS AS PER SURVEY REPORT.

1

-

-

... More
UNDERWATER HULL HULL SURVEY OF ENTIRE UNDERWATER HULL INCLUDING BOOT TOP AREA ARE TO BE CARRIED OUT.RENEW OF STEEL AT DEFECTIVE AREAS AS PER HULL SURVEY REPORT. (UNDER WATER AREA :U/W 678 SQMTR AND BOOT TOP AREA 68 SQ MTR)

10

-

-

... More
UNDERWATER HULL PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) PAINT CONDITION TO BE INSPECTED AND RESTORED IF NECESSARY AS PER NO 20/03 . (AREA :U/W 678 SQMTR INCLUDING BOOT TOP) (I) FOLLOWING PAINT SCHEME USED IN UNDER WATER AREAS- AREA 678 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, ALUMINIUM JOTACOTE UNIVERSAL,GREY SAFE GUARD UNIVERSAL ES, BUFF SEAQUANTUM ULTRA,LIGHT RED SEAQUANTUM ULTRA,DARK RED SEAQUANTUM ULTRA,LIGHT RED (II) 01 COAT OF ANTIFOULING PAINT TO BE APPLIED.

102

-

-

... More
BOOTTOP WITH ANTIFOULING PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN BOOTTOP- AREA 68 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, ALUMINIUM JOTACOTE UNIVERSAL,GREY SAFE GUARD UNIVERSAL ES, BUFF SEAQUANTUM CLASSIC, BLACK SEAQUANTUM CLASSIC,BLACK SEAQUANTUM ULTRA,CLASSIC, BLACK

11

-

-

... More
MISCELLANEOUS U/W STRUCTURE EXAMINE REMOVE, CLEAN, PAINT AND REFIT THE EDDY PLATE AND ROPE GUARD.

2

-

-

... More
RUDDER EXAMINE UNDERWATER STRUCTURE IN ACCORDANCE WITH NO 19/06, PAYING PARTICULAR ATTENTION TO HULL PLATING IN THE VICINITY OF RUDDER(S), FITTING UPTO THE RUDDER HEAD, FOR SIGNS OF CORROSION, DEFECTS AND DAMAGE. EXAMINE RUDDER PINTLE BEARINGS TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING.

2

-

-

... More
SACRIFICIAL ANODES INSPECT SACRIFICIAL ANODES FITTED TO UNDERWATER HULL, RUDDERS, ROPE GAURD, SHAFT TUNNEL, STERN TUBES, INLETS AND OUTLETS, SEA TUBES, BILGES AND COFFER DAMS. RENEW THOSE CONSUMED 50% OR MORE. (ENSURE SACRIFICIAL ANODES ARE NOT PAINTED. ANY PAINT OR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFORE UNDOCKING.) DETAILS OF FITTED SACRIFICIAL ANODE IS AS FOLLOWS:- NEAR RUDDER - 06(TYPE A), NEAR PROPELLER - 15 (TYPE A - 02 AND TYPE B - 06), SEA CHEST - 06(TYPE A), BILGE KEEL- 26(TYPE A-08 AND TYPE B-18), FR 13-16 - 04(TYPE A). WEIGHT OF EACH ANODE IS 14 KG. TOTAL NO OF ANODE - 50 AND TOTAL WEIGHT OF ANODE - 700 KG

50

-

-

... More
SEA TUBES CARRY OUT VISUAL SURVEY OF 03 IN NO. SEA CHEST. CLEAN AND EXAMINE. REPAIR / RENEW AS NECESSARY. PRESSURE TEST OF REPAIRED SEA TUBES.

3

-

-

... More
ANCHOR CHAIN CABLE (I) A QULIFIED BLACK SMITH TO BE EMPLOYED FOR REMOVAL AND DISMANTLING OFANCHOR AND CHAIN CABLE IN ACCORDANCE WITH NO 07/2011. PROPER SIZE TOP SWAGE TO BE USED FOR DISMANTLING OF ALL SHACKLE PINS (II) ENTIRE CHAIN CABLE TO BE RANGED GRIT BLASTING / MECHANICAL WIRE BRUSHING/HYDOJET BLASTING OF ENTIRE CHAIN CABLE AND ANCHOR WITH ACCESSORIES TO BE CARRYOUT. (III) ANCHOR AND ASSOCIATED ANCHOR CHAIN CABLE TO BE SURVEYED. (IV) POST SURVEY ANCHOR AND CHAIN CABLE WITH ACCESSORIES ARE TO BE PAINTED WITH BLACK BITUMENUS ANTI CORROSION PAINT IAW NCD 3909 (V). POST SURVEY MENTIONED BELOW ALL ACCESSORISE TO BE ASSEMBLED TOGETHER AND FITTED BACK. (VI) ANCHORING AND WEIGH ANCHORING TRIALS TO BE COMPLETED AND SYSTEM TO BE PROVED. ANCHOR CHAIN CABLE DETAILS AS FOLLOWS: CHAIN DIA- 24 MM FULL SHACKLE - 12 (EACH 27.5 MTR) ANCHOR SHACKLE - 02, LUG LESS JOINING SHACKLE - 14 D. SHACKLE – 02, SWIVEL PIECE – 02

2

-

-

... More
ANCHOR WINDLASS FOLLOWING DEFECTS OF ANCHOR WINDLASS TO BE RECTIFIED. (A) BRAKE LINER TO BE RENEWED (PORT / STBD). (B) ANCHOR WINDLASS GUILLETINE ARRANGEMENT PORT/ STBD JAMMED. OVERHAULING / SERVICING TO BE CARRIED OUT. (C) 10 NOS GREASE NIPPLES OF WINDLASS DECK MACHINERY TO BE CLEARED. HIGH PRESSURE GREASE FILLING ON ALL GREASE NIPPLES TO BE CARRIED OUT POST RENEWAL. (D) OIL TO BE CHANGED. QTY - 60 LTR PROVE FOR SATISFACTORY OPERATIONS.

1

-

-

... More
SEWAGE TREATMENT PLANT SEWAGE TREATMENT PLANT (HAMWORTHY ST2A-C TO ST6A-C SUPER TRIDENT SEWAGE TREATMENT UNITS):- OVERHAULING OF ENTIRE SYSTEM TO BE CARRIED OUT. PROVE FOR SATISFACTORY OPERATION

1

-

-

... More
SINGLE ARM BOAT DAVIT (I) ABNORMAL SOUND OBSERVED, HARD TO OPERATE. REPAIR/OVERHAULING CARRIED OUT. (II) WIRE ROPE(EFSWR) IS TO BE REPLACED. DIA 12 MM, LENGTH 30 MTR.AND CONNECT TO HOOK. (III) LOAD TEST OF DAVIT CARRIED OUT. SAFE WORKING LOAD 01 TON.

1

-

-

... More
SINGLE ARM BOAT DAVIT 01 IN NO. POLYSTER SLING FOR BOAT LIFTING DAMAGED/SELF LIFE EXPIRED. NEW POLYSTER SLING TO BE PROVIDED.

1

-

-

... More
SINGLE ARM BOAT DAVIT 02 HANDLE FOR MANUAL OPERATION FOR DAVIT CORRODED/BROKEN, TO BE MANUFACTURED AS PER SAMPLE

2

-

-

... More
MOORING CAPSTAN MOORING CAPSTAN- (1) ABNORMAL NOISE OBSERVED DURING OPERATION OF MOORING CAPSTAN. REPAIR IS TO BE CARRIED OUT. (2) OIL TO BE CHANGED. QTY- 40 LTR

1

-

-

... More
ROPE REEL 01 IN HAND OPERATED ROPE REEL HARD TO OPERATE. TO BE EASED.

1

-

-

... More
RUBBER FENDER D-SHAPE RUBBER FENDER DAMAGED/BROKEN. TO BE REPAIRED/RENEWED. LENGTH- 20 MTR

20

-

-

... More
TYRE FENDER 07 IN NO TYRE FENDER UPROOTED/BROKEN. TO BE RENEWED/REPAIRED. JOB INVOLVE WELDING OF EYE AND RENEWAL OF DEFECTIVE CHAIN.

7

-

-

... More
TOP SIDE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN TOP SIDE- AREA 348 SQ MTR PENGUARD PRIMER, RED PRIMASTIC,GREY PRIMASTIC, RED HARDTOP AS, BLACK

53

-

-

... More
MAIN DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN MAIN DECK- AREA 351 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

53

-

-

... More
FORCASTLE DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN FORCASTLE DECK- AREA 72 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

11

-

-

... More
POOP DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN POOP DECK- AREA 132 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

20

-

-

... More
BRIDGE DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN BRIDGE DECK- AREA 28 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

5

-

-

... More
WHEEL HOUSE TOP PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WHEEL HOUSE TOP- AREA 32 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

5

-

-

... More
SUPERSTRUCTURE OUTSIDE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN SUPERSTRUCTURE OUTSIDE- AREA 187 SQ MTR PENGUARD PRIMER, RED PRIMASTIC,RED PRIMASTIC,GREY HARDTOP AS, YELLOW 414

29

-

-

... More
EXPOSED EXHAUST PIPE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN EXPOSED EXHAUST PIPE- AREA 187 SQ MTR PENGUARD PRIMER, RED PRIMASTIC,RED HARDTOP AS, BLACK

30

-

-

... More
FUNNEL INSIDE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN FUNNEL INSIDE- AREA 90 SQ MTR ALUMINIUM PAINT H.R., ALUMINIUM ALUMINIUM PAINT H.R., ALUMINIUM

14

-

-

... More
MAIN ENGINE ROOM CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN MAIN ENGINE ROOM- AREA 1150 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY PENGUARD TC, GREY 038

1150

-

-

... More
STEERING COMPARTMENT PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA)FOLLOWING PAINT SCHEME USED IN STEERING COMPARTMENT- AREA 191 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY PENGUARD TC, GREY 038

30

-

-

... More
PUMP ROOM CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT.FOLLOWING PAINT SCHEME USED IN PUMP ROOM- AREA 320 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY

320

-

-

... More
EMG PUMP ROOM CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN EMG PUMP ROOM- AREA 175.5 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY PENGUARD TC, GREY 038

175.5

-

-

... More
WATER BALLAST TANKS 1 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) . FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 1 (P) AREA 324 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

50

-

-

... More
WATER BALLAST TANKS 1 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 1 (P) AREA 324 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

50

-

-

... More
WATER BALLAST TANKS 2 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 2 (P) AREA 407 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

62

-

-

... More
WATER BALLAST TANKS 2 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 2 (S) AREA 407 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

62

-

-

... More
WATER BALLAST TANKS 3 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 3 (P) AREA 265 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

40

-

-

... More
WATER BALLAST TANKS 3 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 3 (S) AREA 265 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

40

-

-

... More
WATER BALLAST TANKS 4 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 4 (P) AREA 168 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

26

-

-

... More
WATER BALLAST TANKS 4 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 4 (S) AREA 180 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

27

-

-

... More
AFT PEAK TANK(C ) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN AFT PEAK TANK(C ) AREA 515 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

78

-

-

... More
FORPEAK TANKS PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN FORPEAK TANKS AREA 165 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT, BEIGE

25

-

-

... More
VOID SPACES AND COFFERDAM PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN VOID SPACES AND COFFERDAM AREA 401.4 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT, GREEN BALLOXY HB LIGHT, BEIGE

62

-

-

... More
CHAIN LOCKER CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CHAIN LOCKER AREA 57 SQ MTR PENGUARD PRIMER,RED JOTACOTE UNIVERSAL,ALUMINIUM JOTACOTE UNIVERSAL,GREY

57

-

-

... More
FRESH WATER TANK (P) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN FRESH WATER TANK (P) AREA 77 SQ MTR PENGUARD HB,RED PENGUARD HB,WHITE

77

-

-

... More
FRESH WATER TANK (S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN FRESH WATER TANK (S) AREA 77 SQ MTR PENGUARD HB,RED PENGUARD HB,WHITE

77

-

-

... More
FUEL OIL TANKS(P&S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN FUEL OIL TANKS(P&S) AREA 200 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

200

-

-

... More
SLOP TANK(P & S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN SLOP TANK(P & S) AREA 150 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

150

-

-

... More
CARGO TANK 1(P) & 1(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 1(P) & 1(S)) AREA 275 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

275

-

-

... More
CARGO TANK 2(P) & 2(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 2(P) & 2(S)AREA 237 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

237

-

-

... More
CARGO TANK 3(P) & 3(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 3(P) & 3(S) AREA 257 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

257

-

-

... More
CARGO TANK 4(P) & 4(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 4(P) & 4(S) AREA 265 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

265

-

-

... More
CARGO TANK 5(P) & 5(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 5(P) & 5(S)) AREA 281 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

281

-

-

... More
WT DOOR WT DOOR CLIPS HARD TO OPERATE, RUBBER COAMING CRACKED TO BE RENEWED. CHALK TEST TO BE CARRIED OUT POST REPAIR. TOTAL NO. 03

3

-

-

... More
WT HATCH WT HATCH CLIPS HARD TO OPERATE, RUBBER COAMING CRACKED TO BE RENEWED. CHALK TEST TO BE CARRIED OUT POST REPAIR. TOTAL NO. 02

2

-

-

... More
FUEL TANK HATCH WT HATCH CLIPS FOR FUEL TANK HARD TO OPERATE, RUBBER COAMING CRACKED TO BE RENEWED. CHALK TEST TO BE CARRIED OUT POST REPAIR. TOTAL NO. 05

5

-

-

... More
SEARCH LIGHT WATER LEAKAGE OBSERVED IN WHEEL HOUSE THROUGH GEARING OF SEARCH LIGHTS(PORT AND STBD). RUBBER SEAL CRACKED/PERISHED. DEFECT TO BE RECTIFIED.

1

-

-

... More
NWT DOOR 02 IN NO NWT DOOR NOT CLOSING PROPERLY. HINGE BENT. DEFECT TO BE RECTIFIED.

2

-

-

... More
NAME BOARD NAME BOARD OF FB PUSHPA TO BE RENEWED FITTED AT MAST.

1

-

-

... More
NAME BOARD NAME BOARD OF FB PUSHPA TO BE RENEWED FITTED IN BRIDGE WING. QTY – 02

2

-

-

... More
MUSHROOM HEAD OVERHAULING OF MUSHROOM HEAD TO BE CARRIED OUT. QTY- 04

4

-

-

... More
GUARD RAIL (I) GUARD RAIL ON 01 DECK BROKEN/BENT. TO BE REPAIRED/RENEWED. LENGTH- 15 RMTR MAT- GI PIPE (II) GUARD RAIL ON MAIN DECK BROKEN/BENT. TO BE REPAIRED/RENEWED. LENGTH- 100 RMTR MAT- GI PIPE

115

-

-

... More
STANCHION 15 IN NO STANCHION BENT/BROKEN. TO BE REPAIRED/WELDED/RENEWED.

15

-

-

... More
SANITARY SYSTEM FOLLOWING ARE FREQUENTLY CHOKED. CLEANING/RENEWAL ARE TO BE CARRIED OUT:- (I) ENGINEER CABIN WC AND WASH BASIN CHOKED. (II) MASTER CABIN WC AND WASH BASIN CHOKED. (III) 02 WC LINE OF CREW CABIN CHOKED. (IV) GALLEY DRAINS CHOKED.(IV) DRAIN LINE TO OVERBOARD DISCHARGE TO BE CLEANED. AND VALVE FITTED TO BE OVERHAULED.

1

-

-

... More
SANITARY SYSTEM (I) 03 IN NO. FLUSH VALVE OF WC DEFECTIVE. TO BE RENEWED. (II) 04 WATER TAP NOT WORKING. TO BE RENEWED. (III) 01 IN NO COMMODE OF CREW WC BROKEN/DAMAGED. TO BE RENEWED. (IV) 03 IN NO SHOWER IN BATHROOM DAMAGED/NON OPS. TO BE RENEWED.

1

-

-

... More
RO SYSTEM 01 IN NO RO SYSTEM NON OPERATIONAL. TO BE REPAIRED/RENEWED.

1

-

-

... More
WOODEN LOCKER WOODEN LOCKER'S BROWN SUNMICA BROKEN/DAMAGED. TO BE RENEWED. AREA- 15 SQ MTR

15

-

-

... More
WOODEN TABLE 01 IN NO WOODEN TABLE IS TO BE MANUFACTURED FOR CREW CABIN DIM 2.0 X 1.2 X 1.0 MTR X MTR X MTR

1

-

-

... More
METALLIC LOCKER 02 IN NO METALLIC LOCKER DOOR BROKEN/UPROOTED. TO BE REPAIRED/WELDED. MAT.- MS

2

-

-

... More
LIFE BUOY COVER 02 IN NO WOODEN LIFEBUOY COVER FITTED ON W/H WING DETERIORATED/PERISHED. METALLIC COVER TO BE MANUFACTURED AS PER SAMPLE.

2

-

-

... More
PORT HOLE 03 IN NO PORT HOLE NOT CLOSING PROPERLY. RUBBER BEADING TO BE CHANGED. DEFECT IS TO BE RECTIFIED.

3

-

-

... More
MORTARISE LOCK 05 IN NO. MORTARISE LOCK OF CABINS NOT FUNCTIONING. TO BE REPLACED.

5

-

-

... More
DECK COVERING/MICROTECH MACHROTECH AT SCATTERED LOCATION UPROOTED/DAMAGED. (I)            WHEEL HOUSE – 05 SQ MTR (FULL COAT) (II)          PASSAGE – 05 SQ MTR (FULL COAT) (III)         SILLER COAT IN WHEEL HOUSE – 30 SQ PTR

40

-

-

... More
TRUNKING GALLEY TRUNKING AND FILTERS ARE TO BE CLEANED AND DEFECTIVE AREA IF ANY TO BE REPAIRED. TOTAL LENGTH – 10 MTR

10

-

-

... More
SECURING BRCKET 10 IN NO SECURING BRACKET TO BE MANUFACTURED AND WELDED AT SCATTERED LOCATION. MAT - MS

10

-

-

... More
GANGWAY PLATEFORM 02 IN NO GANGWAY PLATEFORM BENT/DAMAGED/BROKEN. TO BE RENEWED. MAT – MS, LENGTH APPROX 10 MTR ANGLE BAR

2

-

-

... More
SHED PILLAR 01 IN NO PILLAR OF SHED BENT/BROKEN. TO BE RENEWED. MAT – MS, LENGTH APROX. 2.0 MTR AND DIA 2”

1

-

-

... More
SERVICES

-

-

-

... More
ENGINEERING

-

-

-

... More
O2 IN NOS MAIN ENGINES MAKE- CUMMINS INDIA MODEL KTA- 19- M4 CHANGE AIR CLEANER ELEMENT CHANGE ENGINE OIL CHANGE ENGINE FULL FLOW FILTER CHANGE BY PASS FILTER CHANGE MARINE GEAR OIL CHECK THROTTLE LINKAGE, CHANGE FUEL FILTER CHECK/REPAIR/RENEW AIR PIPING CLEAN/CHANGE CRANKCASE BREATHER CHECK/REPLACE HEAT EXCHANGER ZINC PLUGS CHECK/REPLACE BELTS ADJUST IF REQUIRED CHECK/REPLACE BELTS ADJUST IF REQUIRED CARRY OUT INSPECTION OF ENGINE VALVE ROTATORS CLEAN FUEL TANK FROM INSIDE CHECK IDLER AND WATER PUMP IDLER CLEAN AND CALIBRATE INJECTORS AND ADJUST VALVES REPLACE ROCKER COVER GASKET CHECK FUEL PUMP CALIBRATION CLEAN TURBOCHARGER COMPRESSOR WHEEL AND DIFFUSER IF REQUIRED CHECK TURBOCHARGER BEARING CLEARANCE TIGHTEN MANIFOLD NUTS OR CAPSCREWS CHANGE COOLANT CHECK VIBRATION DAMPER CHECK SAFETY CONTROL OVERHAUL LUB OIL PRIMING PUMP AND PROVE THEM FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
MAIN ENGINE SAFETY DEVICES CALIBRATION ALL INSTRUMENT AND CARRYOUT AFETY DEVICES CHECK PROVE FOR SARTISFACTORY PERFORMANCE REPAIR/RENEW FAULTY COMPONENTS.

2

-

-

... More
MARINE CONTROL SYSTEM FOR BOTH MAIN ENGINES MODEL - EC 300 MAKE - TWINDISC, USA CARRY OUT FUNCTIONAL TEST OF EC 300 CONTROL TEST AND REPAIR/REPLACE FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
GEAR BOX TYPE-REVERSE DEDUCTION MAKE-TWINDISC USA CHANGE GEARBOX OIL. FLUSH THROUGH THE SYSTEM CHECKS FOR ANY LEAKAGES, TOP UP IF NECESSARY INSPECT THE MOUNTING BOLTS FOR LOOSEN, TIGHTEN IT IF REQUIRED. CHECK THE PRESSURE AND TEMPERATURE GAUGE ASSEMBLY FOR PROPER FUNCTIONING REPLACE OIL FILTER WITH GASKET CLEAN THE OIL STRAINER BY FLUSHING IN CLEAN DIESEL GREASE ALL BULKHEAD GLANDS/ PLUMBER BLOCKS CHECK AHEAD AND STERN FUNCTIONAL TEST AND PROVE FOR SATISFACTORY PERFORMANCE. CHECK/ADJUST ALIGNMNET WITH RESPECT TO ENGINE AND SHAFTING.

2

-

-

... More
RUDDER ASSEMBLY MAKE-NIBHA INUDUSTERIES- 02 NOS CHECK RUDDER CLEARANCE. CHECK ALL BOLTS TIGHTENING AND THEIR LOCKING ARRANGEMENT RENEW GLAND PACKING

2

-

-

... More
STEERING GEAR MAKE- GEETA ENGG CHANGE HYDAULIC OIL CLEAN STORAGE AND SERVICE TANK CHANGE OIL FILTERS CHECK SYSTEM PIPELINES FOR LEAKAGE, RECTIFY IF ANY CHECK ALIGNMENT OF RUDDER ANGLE INDICATOR, CHECK/REPAIR/RENEW SOLENOID VALVES CHECK FUNCTIONAL TEST OF STEERING GEAR FOR SATISFACTORY PERFORMANCE

2

-

-

... More
SHAFTING CHECK SHAFT ALIGNMENT CHECK CLEARANCE OF PLUMBER BLOCKS. CLEANING OF SHAFT AND APPLY PROTECTIVE COATING. FUNCTIONAL CHECKS OF LOKING ARRANGEMENT/SHAFT BRAKE. CHECK COUPLING BOLTS FOR TIGHTNES

2

-

-

... More
INBOARD SEAL CHECK ALIGNMENT OF INBOUND SEAL CHECK INFLATION CHECKS OF EMERGENCY SEAL WITH MAX 6 BAR AIR PRESSURE. CHECK COOLING WATER FLOW OF INBOARD SEAL

2

-

-

... More
A` BRACKET CHECK CLEARANCE OF Á' BRACKET. REPAIR AS NECESSARY

2

-

-

... More
PROPELLER MAKE -WARTSILA QTY- 02 FOUR BLADE DIA-1740 MM CLEANIG AND GREASING OF PROPELLER TO BE CARRIED OUT. CHECK FOR ANY DAMAGE/ PITTING. REPAIR AS REQUIRED.

2

-

-

... More
02 IN NOS DIESEL ALTERNATOR MAKE- CUMMINS MODEL- 6CTA-8.3-D(M) CHANGE ENGINE OIL CHECK/REPLACE FUEL WATER SEPARATOR REPLACE FUEL FILTER CARTRIDGE INSPECT/ CLEAN AIR INTAKE PIPING VENT FUEL LINES AND VENT INJECTOR SUPPLY LINES. ADJUST OVERHEAD SET INCLUDING TAPPET SETTING AND GASKET REPLACEMENT. CHANGE COOLANT. INSPECT VIBRATION DAMPER.

2

-

-

... More
CONTROLS AND INSTRUMENTATION OF BOTH DIESEL ALTERNATOR FUNCTIONAL CHECKS ON CONTROLS OF BOTH DIESEL ALTERNATORS TO BE CARRIED OUT. REPAIR/ RENEW COMPONENTS AS NECESSARY. PROVE THEN FOR SATICFACTORY PERFORMANCE CALIBRATE ALL INSTRUMENTS AND CARRYOUT SAFETY DEVICES CHECK. PROVE FOR SATISFACTORY PERFORMANCE, REPAIR/RENEW FAULTY COMPONENTS.

2

-

-

... More
LUB OIL PURIFIER MAKE - GEA WESTFALIA TYPE - OTC2-02-137 QTY - 01LUB OIL PURIFIER MAKE - GEA WESTFALIA TYPE - OTC2-02-137 QTY - 01 CLEAN BOWL PARTS. CHECK THE BOWL AND CENTRIPETAL PUMP PARTS FOR CORROSION AND EROSION. REPLACE GASKET CHECK THE MOTOR. RE-LUBRICATE MOTOR BEARING, IF REQUIRED. CHECK THE HOSES AND HOSE PIPES AND REPLACE IF NECESSARY. CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE . OIL CHANGE AND THROUGH CLEANING OF THE DRIVE CHAMBER REPLACE DRIVE BELTS. CHECK GROVED BALL BEARINGS 30 AND 40 REPLACE IF NECESSARY. CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
FUEL OIL PURIFIER MAKE - GEA WESTFALIA TYPE - OTC2-02-137 QTY - 01 CLEAN BOWL PARTS. CHECK THE BOWL AND CENTRIPETAL PUMP PARTS FOR CORROSION AND EROSION. REPLACE GASKET CHECK THE MOTOR. RE-LUBRICATE MOTOR BEARING, IF REQUIRED. CHECK THE HOSES AND HOSE PIPES AND REPLACE IF NECESSARY. CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE . OIL CHANGE AND THROUGH CLEANING OF THE DRIVE CHAMBER REPLACE DRIVE BELTS. CHECK GROVED BALL BEARINGS 30 AND 40 REPLACE IF NECESSARY. CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
CO2 SYSTEM CARRY OUT WEIGHING OF CO2 BOTTLES. REFILL BOTTLES IF NET LOSS OF MORE THAN 10%, BOTTLES TO BE REFILLED IT SHALL BE REFILLED AFTER PRESSURE TESTING UPTO 1.5 TIMES OF WORKING PRESSURE.WORKING PR - 150 KG/CM2 AND TESTING PR - 250 KG/CM2 QTY- 07 IN NOS CARRY OUT FUNCTION TEST OF CO2 SYSTEM FITTED FOR ENGINE ROOM, GALLEY EXHAUST DUCT AND FWD PAINT STORE. CALIBRATE ALL PRESSURE SWITCHES AND GAUGES. CLEAN ALL NOZZLES. CARRYOUT FUNCTIONAL TEST WITH LP AIR.

7

-

-

... More
OILY BILGE SEPERATOR MAKE - VICTOR MARINE LTD TYPE - CS 500 QTY -01 CARRY OUT FUNCTIONAL CHECKS OF EQUIPMENT, REPAIR/ RENEW COMPONENT AS NECESSARY. PROVE THE EQUIPMENT FOR SATICFACTORY PERFORMANCE. CHECK AND CALIBTARE ALL SENSOR AND GAUGES. RENEW AS REQUIRED.

1

-

-

... More
AIR COMPRESSOR MAKE -ELGI SAUER TYPE- RECIPROCATING MODEL- LG 02 100 QTY - 02 CARRY OUT FUNCTIONAL CHECKS OF PRESSURE SWITCHES, CUT- IN AND CUT-OFF PRESSURE. RENEW/ REPAIR COMPONENT AS NECESSARY. CHANGE THE SAFETY VALVE DISMANTLE BREATHER VALVE, CLEAN AND CHECK FOR ALL CORRECT SEATING. EXAMINE THE LUBRICATING OIL IN THE CRANKCASE SUMP, RENEW IF NECESSARY. CHECK ALL PIPELINES FOR LEAKS AT JOINTS, RENEW PACKING AND PIPE LINE AS NECESSARY. REPLACE BELT. ADJUST BELT TENSION.

2

-

-

... More
AIR BOTTLES PRESSURE TESTING OF AIR BOTTLES TO BE CARRIED OUT UPTO 45 KG/CM2.QTY- 02 IN NOS CALIBRATION OF RELIEF VALVES TO BE CARRIED OUT.

2

-

-

... More
CARGO PUMP (LSHSD) MAKE - TUSHACO PUMPS PVT LTD MODEL - TDSH-118/064 QTY - 02 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

2

-

-

... More
CARGO PUMP (AVCAT) MAKE - TUSHACO PUMPS PVT LTD MODEL - TDSH-105/058 QTY - 02 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

2

-

-

... More
FUEL OIL PUMP MAKE - TUSHACO PUMP PVT LTD TYPE - T3ST-45/46 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

1

-

-

... More
LUB OIL PUMP MAKE - TUSHACO PUMP PVT LTD TYPE - T3SFP 20/46 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

1

-

-

... More
DIRTY OIL PUMP MAKE - TUSHACO PUMP PVT LTD TYPE - T1S 50.1 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

1

-

-

... More
STRIPPING PUMP (LSHSD) MAKE - TUSHACO PUMP PVT LTD TYPE - T3ST-45/46 QTY - 02 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

2

-

-

... More
FRESH WATER CARGO PUMP MAKE - SPX FLOW TECHNOLOGY TYPE - CV-40-200 QTY - 02 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
FRESH WATER CARGO PUMP MAKE - SPX FLOW TECHNOLOGY TYPE - CV-40-201 QTY - 01 COMPLETE OVERHAUAL THE PUMP. CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
FIRE PUMP MAKE - JOHNSON PUMPS TYPE - CV40-250 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED. CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
BILGE PUMP MAKE - JOHNSON PUMPS TYPE - CV65-160 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED. CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
EMERGENCY FIRE PUMP MAKE - JOHNSON PUMPS TYPE - CH80-400 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED. CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
FRESH WATER HYDROPHORE TANK MAKE - DENKI CARRYOUT PRESSURE TESTING AND SYSTEM TO BE PROVED FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL PRESSURE GAUGES AND SWITCHES. REPLACE FAULTY COMPONENTS IF REQUIRED.

1

-

-

... More
HP AIR SYSTEM VALVES 04 IN NO. AIR BOTTLE VALVES NOT HOLDING. TO BE OVERHAULED. TYPE- NEEDLE VALVE

4

-

-

... More
HP AIR SYSTEM HP AIR SYSTEM VALVES HARD TO OPERATE AND NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SD, SIZE- 30 MM ,QTY- 05,TEST PRESSURE-60 PSI.

5

-

-

... More
HP AIR SYSTEM HP AIR SYSTEM PIPE LINES THINNED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED. WORK INVOLVES REMOVAL/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS AND FLANGE GASKETS TO BE RENEWED(MS).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING MAT- MS , SIZE- 50 MM ,LENGTH-10 MTR,TEST PRESSURE-500 PSI.

10

-

-

... More
20 TPH SUBMERSIBLE PUMP MODEL-M120N(M) QTY - 04 EXAMINE INTERNAL WEAR CHECK RUNNING CLERANCE CHECK OIL CONDITION FOR MECHANICAL SEAL CHECK DIFFUSER FOR WEAR AND CLERANCE

2

-

-

... More
37 TPH DIESEL DRIVEN PUMP MODEL- SH65-16N1-DG S2-316 QTY - 02 CHECK INJECTION NOZZLE CHECK INJECTION PUMP ADJUST VALVE CLERANCE OF INTAKE AND EXHAUST VALVE CHECK THE SURFACE OF BRUSH AND SLIP RING CHECK AND REPLACE FUEL PIPING CHECK THE PUMP CLEARANCES AND REPAIR AS NECESSARY. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
FIRE MAIN SYSTEM VALVES FOLOWING FIRE MAIN SYSTEM DISCHARGE VALVES NOT HOLDING. TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/ OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING. TYPE-ANGLE VALVE, SIZE- 90MM, QTY-04, NOS TYPE- FLAP VALVE DIA- 15 MM,QTY- 06 NOS TYPE- GATE VALVE DIA- 25MM, QTY- 06 IN NOS, LOCATION- SCATTERED

16

-

-

... More
FIRE HYDRANTS 08 IN NO FIRE HYDRANTS NOT HOLDING. TO BE OVERHAULED. RENEW DEFECTIVE COUPLING/COMPONENT.

8

-

-

... More
INSTRUMENTATION GUAGE 20 IN NOS SUCTION PRESSURE GAUGES, RANGE -0 TO 1 KG/CM2 AND 20 IN NOS DISCHARGE PRESSURE GAUGE, RANGE - 0 TO 10 KG/CM2 NOT SHOWING PRESSURE, GAUGE TO BE CALIBRATED/ RENEWED.

40

-

-

... More
INSTRUMENTATION GUAGE PIPE LINES INSTRUMENTATION PIPE LINES OF VARIOUS MACHINERIES HOLED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED INCLUDING END FITTINGS. LENGTH- 30 MTR, SIZE-8 / 10 MM.

30

-

-

... More
HAND PUMPS 09 IN NOS HAND PUMPS NOT OPERATING. PUMPS TO BE OVERHAULED. LOCATION- SCATTERED, TYPE- SEMI ROTARY, CAP- 90 LTRS/ MIN.

9

-

-

... More
SEA WATER SYSTEM CLEAN/INSPECT SEA CHEST VALVES OF MAIN ENGINES AND DIESEL ALTERNATORS, REPAIR AS NECESSARY, BUTTER FLY VALVE QTY- 02, SIZE- 100 MM, ANGLE VALVE QTY- 02 IN NOS, SIZE- 100 MM

2

-

-

... More
SEA WATER SYSTEM INSPECT/REPLACE ZINC PLUGS/ CORROSION PLUGS ON SEA WATER SYSTEM

1

-

-

... More
SEA WATER SYSTEM SEA CHEST AIR VENT LINE OF BOTH SEA CHEST CORRODED AND PERISHED. PIPE LINE TO BE RENEWED.

1

-

-

... More
MAIN ENGINE SEA WATER PUMP BOTH MAIN ENGINE SEA WATER PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
MAIN ENGINE SEA WATER SYSTEM PIPE LINE BOTH MAIN ENGINE SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 80 MM , LENGTH - 10 MTRS, MAT - CUNI

10

-

-

... More
DIESEL ALTERNATOR SEA WATER PUMP BOTH DA SEA WATER PUMP TO BE OVERHAULED AND PROVED FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
DIESEL ALTERNATOR SEA WATER SYSTEM BOTH DA SEA WATER SYSTEM OVERBOARD VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING /RENEWAL/REFITTING AND PRESSURE TESTING. ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ). FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING.

2

-

-

... More
DIESEL ALTERNATOR SEA WATER SYSTEM PIPE LINE BOTH DA SEA WATER SYSTEM PIPE LINE TO BE CHEMICALLY CLEANED AND PRESSURE TESTED. RENEW PIPE LINE INCLUDING END FITTINGS IF NECESSARY. DIA - 40 MM , LENGTH - 10 MTRS, MAT - CUNI

10

-

-

... More
MAIN ENGINE FUEL SYSTEM VALVES BOTH MAIN ENGINE FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/ RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 65 MM ,QTY- 03,TEST PRESSURE-60 PSI.

3

-

-

... More
DA FUEL SYSTEM VALVES BOTH D/A FUEL SHUT OFF VALVES NOT HOLDING, TO BE OVERHAULED. WORK INVOLVES REMOVAL/BLANKING/OVERHAULING/RENEWAL/REFITTING AND PRESSURE TESTING.ALL FASTNERS (FLANGES/BRIDGE COVER) GLAND PACKING AND FLANGE GASKETS TO BE RENEWED(ALBZ).FLANGE SURFACE TO BE PREPARED IF THEY ARE GROOVED.CORRECT PAINT SCHEME TO BE APPLIED BEFORE REFITTING TYPE-SPRING LOADED ANGLE VALVE, SIZE- 65 MM ,QTY- 02,TEST PRESSURE-60 PSI.

2

-

-

... More
FUEL SYSTEM VALVES FOLLOWING VALVES NOT HOLDING, TO BE OVERHAULED. (A) BOTH RU TANK SUCTION VALVE , (B) FUEL CENTRIFUGE BY PASS VALVE, (C) STBD STORAGE TANK MAIN SUCTION QUICK CLOSING VALVE, QTY- 02, SIZE- 50 MM (D) SDNR VALVE, QTY- 06 IN NOS , SIZE- 32 MM (E) NON RETURN VALVE, QTY- 04 IN NOS, SIZE- 20 MM (F) BALL VALVE, QTY - 06 NOS, SIZE 20 MM (G) FUEL TRANSFER PUMP SUCTION AND DISCHARGE VALVE - QTY 04 , DIA - 40 MM

22

-

-

... More
QUICK SHUT OFF VALVES CABLE WIRE OF 06 IN NOS QUICK SHUT OFF VALVE TO BE REPAIRED/RENEWD INCLUDING RENEWAL/ REPAIR OF ALL MOVABLE COMPONETS AND APPLICATION OF LUBRICANT.

6

-

-

... More
FUEL STORAGE TANK 02 IN NO. FUEL STORAGE TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES: (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
FUEL RU TANK 02 IN NOS. MAIN ENGINE FUEL RU TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
LUB OIL RU TANK 01 IN NOS. LUBRICATING OIL RU TANK TO BE CLEANED . WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT.TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN.(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
FRESH WATER STORAGE TANK 01 IN NOS. FRESH WATER STORAGE TANK TO BE CLEANED, SURFACE PREPARED AND PAINTED. (01 COAT EROP, 02 COATS OF COLD BITUMINOUS.WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
DOMESTIC FRESH WATER SYSTEM PIPE LINE CHEMICALLY CLEAN AND PRESSURE TEST FRESH WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - MS

20

-

-

... More
DOMESTIC FRESH WATER SYSTEM VALVES 06 IN NOS FRESH WATER SYSTEM VALVES NOT HOLDING. TO BE OVERHAULED. DIA - 40 MM

6

-

-

... More
FUEL FILLING SYSTEM 04 IN NOS FLANGES TO BE MANUFATURED AS PER FITTING.

4

-

-

... More
CARGO FUEL FILLING/DEFUELING SYSTEM VALVES 10 IN NOS FUEL FILLING NOT HOLDING. VALVE TO BE OVERHAULED. LOCATION - SCATTERED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE

10

-

-

... More
CARGO AVCAT FILLING/DEFUELING SYSTEM VALVES 05 IN NOS FUEL FILLING NOT HOLDING. VALVE TO BE OVERHAULED. LOCATION - SCATTERED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE

5

-

-

... More
CARGO FUEL FILLING TANK SUC/DISCH VALVES 08 IN NOS FUEL FILLING/DEFUELING VALVES OF CARGO FUEL TANKS NOT HOLDING. VALVE TO BE OVERHAULED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE. VALVES ARE SITUATED INSIDE CARGO TANKS AND OPERATED BY ROD GEARING. WORK INCLUDES REPAIR/RENEWAL OF VALVES, ROD GEARING AND REPAIR/RENEWAL OF VALVE WHEEL.

8

-

-

... More
CARGO AVCAT FILLING TANK SUC/DISCH VALVES 02 IN NOS AVCAT FILLING VALVES OF CARGO AVCAT TANKS NOT HOLDING. VALVE TO BE OVERHAULED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE. VALVES ARE SITUATED INSIDE CARGO TANKS AND OPERATED BY ROD GEARING. WORK INCLUDES REPAIR/RENEWAL OF VALVES, ROD GEARING AND REPAIR/RENEWAL OF VALVE WHEEL.

2

-

-

... More
STRIPPING SYSTEM TANK SUCTION VALVES 10 IN NOS VALVES OF STRIPPING SYSTEM TANK SUCTION VALVE NOT HOLDING. VALVE TO BE OVERHAULED. DIA -32 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE. VALVES ARE SITUATED INSIDE CARGO TANKS AND OPERATED BY ROD GEARING. WORK INCLUDES REPAIR/RENEWAL OF VALVES, ROD GEARING AND REPAIR/RENEWAL OF VALVE WHEEL.

10

-

-

... More
STRIPPING SYSTEM TANK SUCTION VALVES 08 IN NOS VALVES OF STRIPPING SYSTEM NOT HOLDING. VALVE TO BE OVERHAULED. DIA -32 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE.

8

-

-

... More
RUBBER RING JOINTS OF PIPE LINE CLAMP JOINTS RUBBER RING JOINT OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND TO BE RENEWED . Dia (mm) QTY 32 10 40 10 60 10 100 15 125 20

1

-

-

... More
DURETTES DURETTES OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND PERISHED, TO BE RENEWED . ALL SECURING JUBILEE CLIPS/ CLAMPS TO BE RENEWED. Dia (mm) Length (mtr) 25 6 50 8 76 12 100 8 130 6

5

-

-

... More
BILGE BILGES OF MAIN ENGINE COMPARTMENT AND SRP COMPARTMENT TO BE CLEANED THROUGHLY AND TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
PAINTING ALL PIPE LINES, VALVES REPAIRED/RENEWED TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
GAUGE GLASS 06 IN NOS GAUGE GLASSES OF FUEL TANK AND FRESH WATER TANK TO BE RENEWED.

6

-

-

... More
ELECTRONIC TANK LEVEL GAUGES 02 IN NOS RU TANK LEVEL GAUGES NOT WORKING. DEFECT TO BE RECTIFIED

2

-

-

... More
MISCELLANEOUS NUTS/ ADAPTORS OF VARIOUS SYSTEMS TO BE MANUFACTURED AS PER SAMPLE. MAT- BRASS, QTY - 80 NOS

80

-

-

... More
DIGITAL TANK SOUNDING CALIBRATION OF ALL 12 IN CARGO TANKS DIGITAL SOUNDING GAUGES. TO BE PROVED AFTER CALIBRATION. REPLACE DEFECTIVE LEVEL SENSORS.

12

-

-

... More
AVCAT AND DIESEL TANKS STRIPPING SYSTEM AVCAT AND DIESEL STRIPPING SYSTEM INTERCONNECTION TO BE ISOLATED TO AVOID CONTAMINATION.

1

-

-

... More
SERVICES

-

-

-

... More
ELECTRICAL

-

-

-

... More
Alternators(02) (140KVA) MAKE - KIRLOSKER (a) Overhaul the alternator job involves the following :- (i) Replacement of bearing. (ii) Cleaning / varnishing of stator winding. (iii) Both interior & Exterior parts of the machine to be blown out with clean and hot air. (iv) Remove oil and dust from internal parts of Alternator.Check bearing and winding. Replace if required. (b) Post overhauling and fitment check for insulation. Insulation to be checked by megger terminal with respect to earth/body, minimum insulation acceptable is 2 mega ohm). (c). Control wiring to be fully renewed. Wiring to be renewed from DA to local and remote control panels as per the circuit diagram. On completion check completeness of the circuit and prove system during trials. (d).Check insulation of circuit. Insulation to be checked with respect to earth/body, minimum insulation acceptable is 2 mega ohm. (e) Associated glands, clamping, cable trays and all other accessories for laying of cables are to renewed if defective during survey. (f) Both diesel alternators engine control panels and alarm panels Malfunctioning to be overhauled and Internal perished wiring to be renewed as per drawing. (g) Over speed protection of digital counter not working to be Calibrated /renewed (h) Alignment of alternater to be carried out post fitment of alternater. (i) Trials would be offered and accepted as per standard Naval trials team procedure

2

-

-

... More
Self Starter (24V DC) Both Main Engine Alternator and self starters (24V DC) to be Overhaul(Qty 04)

4

-

-

... More
Main Switch Board (i) Volt meters -02 (ii) Freq. meters -02 (iii) Ammeters - 02 (iv) KW meters -02 (v) insulation meater- 02(01m ohm,01 k ohm) (vi) power factor meter - 02 (vii) Double volt meter -01 (viii) Double frequncy metre - 01 (b) Both DA Breaker to be calibrated. If required to be replaced. (c) Rotary Hand change over switch (03 possition) defective to be renewed.

1

-

-

... More
Main Engine Control Panel Cum Instrument Panel (Engine Room (a) Both main engine alarm panels (engine room & Wheel House) not working. Engine control not working from wheel house. DIDR to be carried out and control system to be proved. (b) Both engine digital RPM meters to be calibrated. If required to be replaced. (c) 02 in no tachometer to be overhauled. (d) 02 in no Exhaust Temperature gauge to be Calibrated. (d) 02 in no Exhaust Temperature gauge to be Calibrated. (e) 02 in no shaft RPM indicator erratic to be calibrated.

2

-

-

... More
Steering Gear System Rudder angle indicator pointer in wheel house showing erratic reading, defect to be rectified. Potentional meter in (ASP) to be Calibrated .

1

-

-

... More
Electrical Motors Following motors to be overhauled and to be proved satisfactory . Stripping pump(415V 3PH 2.2KW ) - 1 Stripping pump (415V 3PH 2.2KW) - 2 Avcat pump (415V 3PH 11KW ) - 1 Lshsd pump (415V 3PH 15KW ) -1 Lshsd pump(415V 3PH 15KW ) - 2 Fresh water cargo pump (415V 3PH 3.7KW ) -1 Windlass motor (415V 3PH 7.5 KW) = 01 Fresh water transfer motor (415V 3PH 1.1 KW)=01 Bilge/Blast pump (415V 3PH 15 KW)=01 Fire pump (415V 3PH 18.5 KW)=01 Fuel transfer pump (415V 3PH 2.2 KW)=01 Fuel transfer pump (415V 3PH 2.2 KW)=02 STP Motor (415V 3PH 04 KW)=01 Bilge pump (415V 3PH 0.75 KW)=01 L/O purifier (415V 3PH 1.1 KW)=01 Boat davit motor (415V 3PH 3.7 KW)=01

19

-

-

... More
Ventilation Motors Following ventilation motors to be overhaul E/R Exhaust fan (01) E/R Supply fan(01) Galley Exhaust fan (01) Pump room Exhaust fan Aft and fwd (02) Pump room Supply fan Aft and fwd (02) Crew mess Supply fan (01) Paint store Exhaust fan (01)

9

-

-

... More
Starter And Control Panel Following starters and Control panels to be repair and safety protection to be Calibrated as per motor rated current. If found defective to be replaced. Air compressor starter - 02 no Fuel oil transfer pump motor - 01 no GS bilge pump starter - 02 no Engine room supply fan starter - 02 no Engine room Exhaust fan starter - 02 no Supply fan starter for wheel house & Accommodation) - 01no Steering gear starter - 02 no Capstan Control Panel - 01 no Windlass control panel - 01no Capstan master control panel - 01no Fresh water motor starter - 01no Overhaul of a starter panel would involve the following:- (a). Replace internal wiring alongwith associated terminals, lugs, etc. (b) All overload relays (OLR) , contactors & relays are to be renewed after calibration. (c) All indication lamps to be replaced with indigenous make lamps. (d). All electrical connections and fasteners are to be tightened (e). All switches of starter panel to be replaced. (f). On completion of overhaul, the Insulation of entire system to be checked - by a megger - with respect to earth / body, minimum insulation acceptable is 2 mega ohm. (j) All starters are to undergo test bed trials with standard current injection test rig

16

-

-

... More
Fire Alarm Serviciability checks of AFDS system

1

-

-

... More
Battery Rectifier 03 In no Battery charging rectifier to be overhauled. Rating 415V/24 V DC. Portable battery charging rectifier to be overhauled. Rating 230V/ 24V DC

3

-

-

... More
General Lighting Light fitting defective/broken/ fused to be replaced including flood lights/CFL/Bulbs/tubes.Damaged sockets & switches to be replaced. Total - 25 in no.

25

-

-

... More
Talk Back System Talk back system from engine room to wheel house not working defect to be checked and replaced the cable if required.

1

-

-

... More
Transformer, 10VA(415V,50HZ ,3PH) 04 in no lighting transformers to be overhauled and serviceability checks to be carried out on completion.

4

-

-

... More
Batteries 12V (a) Re-commisioning of 10 in no 12V,180AH batteries. (b) Re-commisioning of 12 in no 12V, 200 AH inverter batteries.

22

-

-

... More
Cooking Range with oven Renewable of internal wiring & elements .checks of thermostart on oven for properly cut off if required then replace.

1

-

-

... More
sailor set serviceability checks of o1 no of sailor set.

1

-

-

... More
MATERIAL

-

-

-

-

-

-

... More
UNDERWATER HULL HULL SURVEY OF ENTIRE UNDERWATER HULL INCLUDING BOOT TOP AREA ARE TO BE CARRIED OUT.RENEW OF STEEL AT DEFECTIVE AREAS AS PER HULL SURVEY REPORT. (UNDER WATER AREA :U/W 678 SQMTR AND BOOT TOP AREA 68 SQ MTR)

10

-

-

... More
UNDERWATER HULL PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) PAINT CONDITION TO BE INSPECTED AND RESTORED IF NECESSARY AS PER NO 20/03 . (AREA :U/W 678 SQMTR INCLUDING BOOT TOP) (I) FOLLOWING PAINT SCHEME USED IN UNDER WATER AREAS- AREA 678 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, ALUMINIUM JOTACOTE UNIVERSAL,GREY SAFE GUARD UNIVERSAL ES, BUFF SEAQUANTUM ULTRA,LIGHT RED SEAQUANTUM ULTRA,DARK RED SEAQUANTUM ULTRA,LIGHT RED (II) 01 COAT OF ANTIFOULING PAINT TO BE APPLIED.

102

-

-

... More
BOOTTOP WITH ANTIFOULING PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN BOOTTOP- AREA 68 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, ALUMINIUM JOTACOTE UNIVERSAL,GREY SAFE GUARD UNIVERSAL ES, BUFF SEAQUANTUM CLASSIC, BLACK SEAQUANTUM CLASSIC,BLACK SEAQUANTUM ULTRA,CLASSIC, BLACK

11

-

-

... More
RUDDER EXAMINE UNDERWATER STRUCTURE IN ACCORDANCE WITH NO 19/06, PAYING PARTICULAR ATTENTION TO HULL PLATING IN THE VICINITY OF RUDDER(S), FITTING UPTO THE RUDDER HEAD, FOR SIGNS OF CORROSION, DEFECTS AND DAMAGE. EXAMINE RUDDER PINTLE BEARINGS TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING.

2

-

-

... More
SACRIFICIAL ANODES INSPECT SACRIFICIAL ANODES FITTED TO UNDERWATER HULL, RUDDERS, ROPE GAURD, SHAFT TUNNEL, STERN TUBES, INLETS AND OUTLETS, SEA TUBES, BILGES AND COFFER DAMS. RENEW THOSE CONSUMED 50% OR MORE. (ENSURE SACRIFICIAL ANODES ARE NOT PAINTED. ANY PAINT OR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFORE UNDOCKING.) DETAILS OF FITTED SACRIFICIAL ANODE IS AS FOLLOWS:- NEAR RUDDER - 06(TYPE A), NEAR PROPELLER - 15 (TYPE A - 02 AND TYPE B - 06), SEA CHEST - 06(TYPE A), BILGE KEEL- 26(TYPE A-08 AND TYPE B-18), FR 13-16 - 04(TYPE A). WEIGHT OF EACH ANODE IS 14 KG. TOTAL NO OF ANODE - 50 AND TOTAL WEIGHT OF ANODE - 700 KG

50

-

-

... More
ANCHOR CHAIN CABLE (I) A QULIFIED BLACK SMITH TO BE EMPLOYED FOR REMOVAL AND DISMANTLING OFANCHOR AND CHAIN CABLE IN ACCORDANCE WITH NO 07/2011. PROPER SIZE TOP SWAGE TO BE USED FOR DISMANTLING OF ALL SHACKLE PINS (II) ENTIRE CHAIN CABLE TO BE RANGED GRIT BLASTING / MECHANICAL WIRE BRUSHING/HYDOJET BLASTING OF ENTIRE CHAIN CABLE AND ANCHOR WITH ACCESSORIES TO BE CARRYOUT. (III) ANCHOR AND ASSOCIATED ANCHOR CHAIN CABLE TO BE SURVEYED. (IV) POST SURVEY ANCHOR AND CHAIN CABLE WITH ACCESSORIES ARE TO BE PAINTED WITH BLACK BITUMENUS ANTI CORROSION PAINT IAW NCD 3909 (V). POST SURVEY MENTIONED BELOW ALL ACCESSORISE TO BE ASSEMBLED TOGETHER AND FITTED BACK. (VI) ANCHORING AND WEIGH ANCHORING TRIALS TO BE COMPLETED AND SYSTEM TO BE PROVED. ANCHOR CHAIN CABLE DETAILS AS FOLLOWS: CHAIN DIA- 24 MM FULL SHACKLE - 12 (EACH 27.5 MTR) ANCHOR SHACKLE - 02, LUG LESS JOINING SHACKLE - 14 D. SHACKLE – 02, SWIVEL PIECE – 02

2

-

-

... More
SEWAGE TREATMENT PLANT SEWAGE TREATMENT PLANT (HAMWORTHY ST2A-C TO ST6A-C SUPER TRIDENT SEWAGE TREATMENT UNITS):- OVERHAULING OF ENTIRE SYSTEM TO BE CARRIED OUT. PROVE FOR SATISFACTORY OPERATION

1

-

-

... More
SINGLE ARM BOAT DAVIT (I) ABNORMAL SOUND OBSERVED, HARD TO OPERATE. REPAIR/OVERHAULING CARRIED OUT. (II) WIRE ROPE(EFSWR) IS TO BE REPLACED. DIA 12 MM, LENGTH 30 MTR.AND CONNECT TO HOOK. (III) LOAD TEST OF DAVIT CARRIED OUT. SAFE WORKING LOAD 01 TON.

1

-

-

... More
SINGLE ARM BOAT DAVIT 01 IN NO. POLYSTER SLING FOR BOAT LIFTING DAMAGED/SELF LIFE EXPIRED. NEW POLYSTER SLING TO BE PROVIDED.

1

-

-

... More
SINGLE ARM BOAT DAVIT 02 HANDLE FOR MANUAL OPERATION FOR DAVIT CORRODED/BROKEN, TO BE MANUFACTURED AS PER SAMPLE

2

-

-

... More
MOORING CAPSTAN MOORING CAPSTAN- (1) ABNORMAL NOISE OBSERVED DURING OPERATION OF MOORING CAPSTAN. REPAIR IS TO BE CARRIED OUT. (2) OIL TO BE CHANGED. QTY- 40 LTR

1

-

-

... More
ROPE REEL 01 IN HAND OPERATED ROPE REEL HARD TO OPERATE. TO BE EASED.

1

-

-

... More
RUBBER FENDER D-SHAPE RUBBER FENDER DAMAGED/BROKEN. TO BE REPAIRED/RENEWED. LENGTH- 20 MTR

20

-

-

... More
TYRE FENDER 07 IN NO TYRE FENDER UPROOTED/BROKEN. TO BE RENEWED/REPAIRED. JOB INVOLVE WELDING OF EYE AND RENEWAL OF DEFECTIVE CHAIN.

7

-

-

... More
TOP SIDE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN TOP SIDE- AREA 348 SQ MTR PENGUARD PRIMER, RED PRIMASTIC,GREY PRIMASTIC, RED HARDTOP AS, BLACK

53

-

-

... More
MAIN DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN MAIN DECK- AREA 351 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

53

-

-

... More
FORCASTLE DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN FORCASTLE DECK- AREA 72 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

11

-

-

... More
POOP DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN POOP DECK- AREA 132 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

20

-

-

... More
BRIDGE DECK PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN BRIDGE DECK- AREA 28 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

5

-

-

... More
WHEEL HOUSE TOP PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WHEEL HOUSE TOP- AREA 32 SQ MTR PENGUARD PRIMER, RED JOTAMASTIC 87, ALUMINIUM JOTA ARMOUR, GREEN 137

5

-

-

... More
SUPERSTRUCTURE OUTSIDE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN SUPERSTRUCTURE OUTSIDE- AREA 187 SQ MTR PENGUARD PRIMER, RED PRIMASTIC,RED PRIMASTIC,GREY HARDTOP AS, YELLOW 414

29

-

-

... More
EXPOSED EXHAUST PIPE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN EXPOSED EXHAUST PIPE- AREA 187 SQ MTR PENGUARD PRIMER, RED PRIMASTIC,RED HARDTOP AS, BLACK

30

-

-

... More
FUNNEL INSIDE PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN FUNNEL INSIDE- AREA 90 SQ MTR ALUMINIUM PAINT H.R., ALUMINIUM ALUMINIUM PAINT H.R., ALUMINIUM

14

-

-

... More
MAIN ENGINE ROOM CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN MAIN ENGINE ROOM- AREA 1150 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY PENGUARD TC, GREY 038

1150

-

-

... More
STEERING COMPARTMENT PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA)FOLLOWING PAINT SCHEME USED IN STEERING COMPARTMENT- AREA 191 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY PENGUARD TC, GREY 038

30

-

-

... More
PUMP ROOM CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT.FOLLOWING PAINT SCHEME USED IN PUMP ROOM- AREA 320 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY

320

-

-

... More
EMG PUMP ROOM CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN EMG PUMP ROOM- AREA 175.5 SQ MTR PENGUARD PRIMER, RED JOTACOTE UNIVERSAL, GREY PENGUARD TC, GREY 038

175.5

-

-

... More
WATER BALLAST TANKS 1 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) . FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 1 (P) AREA 324 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

50

-

-

... More
WATER BALLAST TANKS 1 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 1 (P) AREA 324 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

50

-

-

... More
WATER BALLAST TANKS 2 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 2 (P) AREA 407 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

62

-

-

... More
WATER BALLAST TANKS 2 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 2 (S) AREA 407 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

62

-

-

... More
WATER BALLAST TANKS 3 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 3 (P) AREA 265 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

40

-

-

... More
WATER BALLAST TANKS 3 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 3 (S) AREA 265 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

40

-

-

... More
WATER BALLAST TANKS 4 (P) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 4 (P) AREA 168 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

26

-

-

... More
WATER BALLAST TANKS 4 (S) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN WATER BALLAST TANKS 4 (S) AREA 180 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

27

-

-

... More
AFT PEAK TANK(C ) PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN AFT PEAK TANK(C ) AREA 515 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE

78

-

-

... More
FORPEAK TANKS PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN FORPEAK TANKS AREA 165 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT, BEIGE

25

-

-

... More
VOID SPACES AND COFFERDAM PAINT CONDITION TO BE INSPECTED AND TOUCH UP IS TO BE CARRIED OUT OF DEFECTIVE AREA(TOUCH UP AREA WILL BE 15 % OF TOTAL AREA) FOLLOWING PAINT SCHEME USED IN VOID SPACES AND COFFERDAM AREA 401.4 SQ MTR PENGUARD PRIMER,RED BALLOXY HB LIGHT,GREEN BALLOXY HB LIGHT, BEIGE BALLOXY HB LIGHT, GREEN BALLOXY HB LIGHT, BEIGE

62

-

-

... More
CHAIN LOCKER CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CHAIN LOCKER AREA 57 SQ MTR PENGUARD PRIMER,RED JOTACOTE UNIVERSAL,ALUMINIUM JOTACOTE UNIVERSAL,GREY

57

-

-

... More
FRESH WATER TANK (P) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN FRESH WATER TANK (P) AREA 77 SQ MTR PENGUARD HB,RED PENGUARD HB,WHITE

77

-

-

... More
FRESH WATER TANK (S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN FRESH WATER TANK (S) AREA 77 SQ MTR PENGUARD HB,RED PENGUARD HB,WHITE

77

-

-

... More
FUEL OIL TANKS(P&S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN FUEL OIL TANKS(P&S) AREA 200 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

200

-

-

... More
SLOP TANK(P & S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN SLOP TANK(P & S) AREA 150 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

150

-

-

... More
CARGO TANK 1(P) & 1(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 1(P) & 1(S)) AREA 275 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

275

-

-

... More
CARGO TANK 2(P) & 2(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 2(P) & 2(S)AREA 237 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

237

-

-

... More
CARGO TANK 3(P) & 3(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 3(P) & 3(S) AREA 257 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

257

-

-

... More
CARGO TANK 4(P) & 4(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 4(P) & 4(S) AREA 265 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

265

-

-

... More
CARGO TANK 5(P) & 5(S) CLEANING / DEGREASING / CHIPPING AND LLPS PAINT APPLICATION TO BE CARRIED OUT. FOLLOWING PAINT SCHEME USED IN CARGO TANK 5(P) & 5(S)) AREA 281 SQ MTR TANKGUARD HB,LIGHT GREY TANKGUARD HB,GREYISH GREEN TANKGUARD HB,LIGHT GREY

281

-

-

... More
WT DOOR WT DOOR CLIPS HARD TO OPERATE, RUBBER COAMING CRACKED TO BE RENEWED. CHALK TEST TO BE CARRIED OUT POST REPAIR. TOTAL NO. 03

3

-

-

... More
WT HATCH WT HATCH CLIPS HARD TO OPERATE, RUBBER COAMING CRACKED TO BE RENEWED. CHALK TEST TO BE CARRIED OUT POST REPAIR. TOTAL NO. 02

2

-

-

... More
FUEL TANK HATCH WT HATCH CLIPS FOR FUEL TANK HARD TO OPERATE, RUBBER COAMING CRACKED TO BE RENEWED. CHALK TEST TO BE CARRIED OUT POST REPAIR. TOTAL NO. 05

5

-

-

... More
SEARCH LIGHT WATER LEAKAGE OBSERVED IN WHEEL HOUSE THROUGH GEARING OF SEARCH LIGHTS(PORT AND STBD). RUBBER SEAL CRACKED/PERISHED. DEFECT TO BE RECTIFIED.

1

-

-

... More
NWT DOOR 02 IN NO NWT DOOR NOT CLOSING PROPERLY. HINGE BENT. DEFECT TO BE RECTIFIED.

2

-

-

... More
NAME BOARD NAME BOARD OF FB PUSHPA TO BE RENEWED FITTED AT MAST.

1

-

-

... More
NAME BOARD NAME BOARD OF FB PUSHPA TO BE RENEWED FITTED IN BRIDGE WING. QTY – 02

2

-

-

... More
MUSHROOM HEAD OVERHAULING OF MUSHROOM HEAD TO BE CARRIED OUT. QTY- 04

4

-

-

... More
GUARD RAIL (I) GUARD RAIL ON 01 DECK BROKEN/BENT. TO BE REPAIRED/RENEWED. LENGTH- 15 RMTR MAT- GI PIPE (II) GUARD RAIL ON MAIN DECK BROKEN/BENT. TO BE REPAIRED/RENEWED. LENGTH- 100 RMTR MAT- GI PIPE

115

-

-

... More
STANCHION 15 IN NO STANCHION BENT/BROKEN. TO BE REPAIRED/WELDED/RENEWED.

15

-

-

... More
SANITARY SYSTEM FOLLOWING ARE FREQUENTLY CHOKED. CLEANING/RENEWAL ARE TO BE CARRIED OUT:- (I) ENGINEER CABIN WC AND WASH BASIN CHOKED. (II) MASTER CABIN WC AND WASH BASIN CHOKED. (III) 02 WC LINE OF CREW CABIN CHOKED. (IV) GALLEY DRAINS CHOKED.(IV) DRAIN LINE TO OVERBOARD DISCHARGE TO BE CLEANED. AND VALVE FITTED TO BE OVERHAULED.

1

-

-

... More
SANITARY SYSTEM (I) 03 IN NO. FLUSH VALVE OF WC DEFECTIVE. TO BE RENEWED. (II) 04 WATER TAP NOT WORKING. TO BE RENEWED. (III) 01 IN NO COMMODE OF CREW WC BROKEN/DAMAGED. TO BE RENEWED. (IV) 03 IN NO SHOWER IN BATHROOM DAMAGED/NON OPS. TO BE RENEWED.

1

-

-

... More
RO SYSTEM 01 IN NO RO SYSTEM NON OPERATIONAL. TO BE REPAIRED/RENEWED.

1

-

-

... More
WOODEN LOCKER WOODEN LOCKER'S BROWN SUNMICA BROKEN/DAMAGED. TO BE RENEWED. AREA- 15 SQ MTR

15

-

-

... More
WOODEN TABLE 01 IN NO WOODEN TABLE IS TO BE MANUFACTURED FOR CREW CABIN DIM 2.0 X 1.2 X 1.0 MTR X MTR X MTR

1

-

-

... More
METALLIC LOCKER 02 IN NO METALLIC LOCKER DOOR BROKEN/UPROOTED. TO BE REPAIRED/WELDED. MAT.- MS

2

-

-

... More
LIFE BUOY COVER 02 IN NO WOODEN LIFEBUOY COVER FITTED ON W/H WING DETERIORATED/PERISHED. METALLIC COVER TO BE MANUFACTURED AS PER SAMPLE.

2

-

-

... More
PORT HOLE 03 IN NO PORT HOLE NOT CLOSING PROPERLY. RUBBER BEADING TO BE CHANGED. DEFECT IS TO BE RECTIFIED.

3

-

-

... More
MORTARISE LOCK 05 IN NO. MORTARISE LOCK OF CABINS NOT FUNCTIONING. TO BE REPLACED.

5

-

-

... More
DECK COVERING/MICROTECH MACHROTECH AT SCATTERED LOCATION UPROOTED/DAMAGED. (I)            WHEEL HOUSE – 05 SQ MTR (FULL COAT) (II)          PASSAGE – 05 SQ MTR (FULL COAT) (III)         SILLER COAT IN WHEEL HOUSE – 30 SQ PTR

40

-

-

... More
TRUNKING GALLEY TRUNKING AND FILTERS ARE TO BE CLEANED AND DEFECTIVE AREA IF ANY TO BE REPAIRED. TOTAL LENGTH – 10 MTR

10

-

-

... More
SECURING BRCKET 10 IN NO SECURING BRACKET TO BE MANUFACTURED AND WELDED AT SCATTERED LOCATION. MAT - MS

10

-

-

... More
GANGWAY PLATEFORM 02 IN NO GANGWAY PLATEFORM BENT/DAMAGED/BROKEN. TO BE RENEWED. MAT – MS, LENGTH APPROX 10 MTR ANGLE BAR

2

-

-

... More
SHED PILLAR 01 IN NO PILLAR OF SHED BENT/BROKEN. TO BE RENEWED. MAT – MS, LENGTH APROX. 2.0 MTR AND DIA 2”

1

-

-

... More
MATERIAL

-

-

-

... More
ENGINEERING

-

-

-

... More
O2 IN NOS MAIN ENGINES MAKE- CUMMINS INDIA MODEL KTA- 19- M4 CHANGE AIR CLEANER ELEMENT CHANGE ENGINE OIL CHANGE ENGINE FULL FLOW FILTER CHANGE BY PASS FILTER CHANGE MARINE GEAR OIL CHECK THROTTLE LINKAGE, CHANGE FUEL FILTER CHECK/REPAIR/RENEW AIR PIPING CLEAN/CHANGE CRANKCASE BREATHER CHECK/REPLACE HEAT EXCHANGER ZINC PLUGS CHECK/REPLACE BELTS ADJUST IF REQUIRED CHECK/REPLACE BELTS ADJUST IF REQUIRED CARRY OUT INSPECTION OF ENGINE VALVE ROTATORS CLEAN FUEL TANK FROM INSIDE CHECK IDLER AND WATER PUMP IDLER CLEAN AND CALIBRATE INJECTORS AND ADJUST VALVES REPLACE ROCKER COVER GASKET CHECK FUEL PUMP CALIBRATION CLEAN TURBOCHARGER COMPRESSOR WHEEL AND DIFFUSER IF REQUIRED CHECK TURBOCHARGER BEARING CLEARANCE TIGHTEN MANIFOLD NUTS OR CAPSCREWS CHANGE COOLANT CHECK VIBRATION DAMPER CHECK SAFETY CONTROL OVERHAUL LUB OIL PRIMING PUMP AND PROVE THEM FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
MAIN ENGINE SAFETY DEVICES CALIBRATION ALL INSTRUMENT AND CARRYOUT AFETY DEVICES CHECK PROVE FOR SARTISFACTORY PERFORMANCE REPAIR/RENEW FAULTY COMPONENTS.

2

-

-

... More
MARINE CONTROL SYSTEM FOR BOTH MAIN ENGINES MODEL - EC 300 MAKE - TWINDISC, USA CARRY OUT FUNCTIONAL TEST OF EC 300 CONTROL TEST AND REPAIR/REPLACE FAULTY COMPONENTS. CHECK ALL WIRINGS AND CONNECTIONS. PROVE FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
GEAR BOX TYPE-REVERSE DEDUCTION MAKE-TWINDISC USA CHANGE GEARBOX OIL. FLUSH THROUGH THE SYSTEM CHECKS FOR ANY LEAKAGES, TOP UP IF NECESSARY INSPECT THE MOUNTING BOLTS FOR LOOSEN, TIGHTEN IT IF REQUIRED. CHECK THE PRESSURE AND TEMPERATURE GAUGE ASSEMBLY FOR PROPER FUNCTIONING REPLACE OIL FILTER WITH GASKET CLEAN THE OIL STRAINER BY FLUSHING IN CLEAN DIESEL GREASE ALL BULKHEAD GLANDS/ PLUMBER BLOCKS CHECK AHEAD AND STERN FUNCTIONAL TEST AND PROVE FOR SATISFACTORY PERFORMANCE. CHECK/ADJUST ALIGNMNET WITH RESPECT TO ENGINE AND SHAFTING.

2

-

-

... More
RUDDER ASSEMBLY MAKE-NIBHA INUDUSTERIES- 02 NOS CHECK RUDDER CLEARANCE. CHECK ALL BOLTS TIGHTENING AND THEIR LOCKING ARRANGEMENT RENEW GLAND PACKING

2

-

-

... More
STEERING GEAR MAKE- GEETA ENGG CHANGE HYDAULIC OIL CLEAN STORAGE AND SERVICE TANK CHANGE OIL FILTERS CHECK SYSTEM PIPELINES FOR LEAKAGE, RECTIFY IF ANY CHECK ALIGNMENT OF RUDDER ANGLE INDICATOR, CHECK/REPAIR/RENEW SOLENOID VALVES CHECK FUNCTIONAL TEST OF STEERING GEAR FOR SATISFACTORY PERFORMANCE

2

-

-

... More
SHAFTING CHECK SHAFT ALIGNMENT CHECK CLEARANCE OF PLUMBER BLOCKS. CLEANING OF SHAFT AND APPLY PROTECTIVE COATING. FUNCTIONAL CHECKS OF LOKING ARRANGEMENT/SHAFT BRAKE. CHECK COUPLING BOLTS FOR TIGHTNES

2

-

-

... More
PROPELLER MAKE -WARTSILA QTY- 02 FOUR BLADE DIA-1740 MM CLEANIG AND GREASING OF PROPELLER TO BE CARRIED OUT. CHECK FOR ANY DAMAGE/ PITTING. REPAIR AS REQUIRED.

2

-

-

... More
02 IN NOS DIESEL ALTERNATOR MAKE- CUMMINS MODEL- 6CTA-8.3-D(M) CHANGE ENGINE OIL CHECK/REPLACE FUEL WATER SEPARATOR REPLACE FUEL FILTER CARTRIDGE INSPECT/ CLEAN AIR INTAKE PIPING VENT FUEL LINES AND VENT INJECTOR SUPPLY LINES. ADJUST OVERHEAD SET INCLUDING TAPPET SETTING AND GASKET REPLACEMENT. CHANGE COOLANT. INSPECT VIBRATION DAMPER.

2

-

-

... More
CONTROLS AND INSTRUMENTATION OF BOTH DIESEL ALTERNATOR FUNCTIONAL CHECKS ON CONTROLS OF BOTH DIESEL ALTERNATORS TO BE CARRIED OUT. REPAIR/ RENEW COMPONENTS AS NECESSARY. PROVE THEN FOR SATICFACTORY PERFORMANCE CALIBRATE ALL INSTRUMENTS AND CARRYOUT SAFETY DEVICES CHECK. PROVE FOR SATISFACTORY PERFORMANCE, REPAIR/RENEW FAULTY COMPONENTS.

2

-

-

... More
LUB OIL PURIFIER MAKE - GEA WESTFALIA TYPE - OTC2-02-137 QTY - 01LUB OIL PURIFIER MAKE - GEA WESTFALIA TYPE - OTC2-02-137 QTY - 01 CLEAN BOWL PARTS. CHECK THE BOWL AND CENTRIPETAL PUMP PARTS FOR CORROSION AND EROSION. REPLACE GASKET CHECK THE MOTOR. RE-LUBRICATE MOTOR BEARING, IF REQUIRED. CHECK THE HOSES AND HOSE PIPES AND REPLACE IF NECESSARY. CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE . OIL CHANGE AND THROUGH CLEANING OF THE DRIVE CHAMBER REPLACE DRIVE BELTS. CHECK GROVED BALL BEARINGS 30 AND 40 REPLACE IF NECESSARY. CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
FUEL OIL PURIFIER MAKE - GEA WESTFALIA TYPE - OTC2-02-137 QTY - 01 CLEAN BOWL PARTS. CHECK THE BOWL AND CENTRIPETAL PUMP PARTS FOR CORROSION AND EROSION. REPLACE GASKET CHECK THE MOTOR. RE-LUBRICATE MOTOR BEARING, IF REQUIRED. CHECK THE HOSES AND HOSE PIPES AND REPLACE IF NECESSARY. CLEAN AND CHECK OF LOCK RING, BOWL HOOD, TOP DISC, GRAVITY DISC, BOWL DISC, DISTRIBUTOR, BOWL BODY, CORROSION, EROSION, CRACKS, DISC STACK PRESSURE . OIL CHANGE AND THROUGH CLEANING OF THE DRIVE CHAMBER REPLACE DRIVE BELTS. CHECK GROVED BALL BEARINGS 30 AND 40 REPLACE IF NECESSARY. CARRY OUT FUNCTIONAL CHECKS OF MONITORING EQUIPMENT. REPAIR AS NECESSARY

1

-

-

... More
CO2 SYSTEM CARRY OUT WEIGHING OF CO2 BOTTLES. REFILL BOTTLES IF NET LOSS OF MORE THAN 10%, BOTTLES TO BE REFILLED IT SHALL BE REFILLED AFTER PRESSURE TESTING UPTO 1.5 TIMES OF WORKING PRESSURE.WORKING PR - 150 KG/CM2 AND TESTING PR - 250 KG/CM2 QTY- 07 IN NOS CARRY OUT FUNCTION TEST OF CO2 SYSTEM FITTED FOR ENGINE ROOM, GALLEY EXHAUST DUCT AND FWD PAINT STORE. CALIBRATE ALL PRESSURE SWITCHES AND GAUGES. CLEAN ALL NOZZLES. CARRYOUT FUNCTIONAL TEST WITH LP AIR.

7

-

-

... More
OILY BILGE SEPERATOR MAKE - VICTOR MARINE LTD TYPE - CS 500 QTY -01 CARRY OUT FUNCTIONAL CHECKS OF EQUIPMENT, REPAIR/ RENEW COMPONENT AS NECESSARY. PROVE THE EQUIPMENT FOR SATICFACTORY PERFORMANCE. CHECK AND CALIBTARE ALL SENSOR AND GAUGES. RENEW AS REQUIRED.

1

-

-

... More
AIR COMPRESSOR MAKE -ELGI SAUER TYPE- RECIPROCATING MODEL- LG 02 100 QTY - 02 CARRY OUT FUNCTIONAL CHECKS OF PRESSURE SWITCHES, CUT- IN AND CUT-OFF PRESSURE. RENEW/ REPAIR COMPONENT AS NECESSARY. CHANGE THE SAFETY VALVE DISMANTLE BREATHER VALVE, CLEAN AND CHECK FOR ALL CORRECT SEATING. EXAMINE THE LUBRICATING OIL IN THE CRANKCASE SUMP, RENEW IF NECESSARY. CHECK ALL PIPELINES FOR LEAKS AT JOINTS, RENEW PACKING AND PIPE LINE AS NECESSARY. REPLACE BELT. ADJUST BELT TENSION.

2

-

-

... More
CARGO PUMP (LSHSD) MAKE - TUSHACO PUMPS PVT LTD MODEL - TDSH-118/064 QTY - 02 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

2

-

-

... More
CARGO PUMP (AVCAT) MAKE - TUSHACO PUMPS PVT LTD MODEL - TDSH-105/058 QTY - 02 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

2

-

-

... More
FUEL OIL PUMP MAKE - TUSHACO PUMP PVT LTD TYPE - T3ST-45/46 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

1

-

-

... More
LUB OIL PUMP MAKE - TUSHACO PUMP PVT LTD TYPE - T3SFP 20/46 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

1

-

-

... More
DIRTY OIL PUMP MAKE - TUSHACO PUMP PVT LTD TYPE - T1S 50.1 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

1

-

-

... More
STRIPPING PUMP (LSHSD) MAKE - TUSHACO PUMP PVT LTD TYPE - T3ST-45/46 QTY - 02 REPLACE OIL IN THE TIMING GEAR BOX CHECK THE LEAKAGE OF STUFFING BOX, IF MORE THAN PERMISIBLE LIMIT REPLACE MECHANICAL SEAL CHECK THE ALIGNMENT OF THE COUPLING HALVES. ADJUST IF NECESSARY CHECK CAPACITY AND ABSORVED HORSE POWER. CAPACITY AND POWER LOSS WILL INDICATE WAER CHECK THE SCREW FLANK CLEARANCE, AS WELL AS THE PLAY BETWEEN THE TIMING GEARS. CHECK AXIAL CLEARANCE OF BEARING. LIMIT - 0.2 MM,REPLACE IF EXCEEDS LIMIT. CHECK TIMING GEAR CLEARANCE. LIMIT 0.5 MM, REPLACE IF EXCEEDS LIMIT.

2

-

-

... More
FRESH WATER CARGO PUMP MAKE - SPX FLOW TECHNOLOGY TYPE - CV-40-200 QTY - 02 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
FRESH WATER CARGO PUMP MAKE - SPX FLOW TECHNOLOGY TYPE - CV-40-201 QTY - 01 COMPLETE OVERHAUAL THE PUMP. CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
FIRE PUMP MAKE - JOHNSON PUMPS TYPE - CV40-250 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED. CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
BILGE PUMP MAKE - JOHNSON PUMPS TYPE - CV65-160 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED. CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
EMERGENCY FIRE PUMP MAKE - JOHNSON PUMPS TYPE - CH80-400 CHECK MECHANICAL SEAL AND LIP SEAL FOR ANY LEAKAGES. REPAIR AS NECESSARY CHECK BEARING , REPLACE IF NECESSARY CALIBRATE SUC & DISC PRESSURE GAUGES, RENEW IF REQUIRED. CHECK ALIGNMENT OF PUMP AND MOTOR, TAKE CORRECTIVE ACTION. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

1

-

-

... More
FRESH WATER HYDROPHORE TANK MAKE - DENKI CARRYOUT PRESSURE TESTING AND SYSTEM TO BE PROVED FOR SATISFACTORY PERFORMANCE. CALIBRATE ALL PRESSURE GAUGES AND SWITCHES. REPLACE FAULTY COMPONENTS IF REQUIRED.

1

-

-

... More
20 TPH SUBMERSIBLE PUMP MODEL-M120N(M) QTY - 04 EXAMINE INTERNAL WEAR CHECK RUNNING CLERANCE CHECK OIL CONDITION FOR MECHANICAL SEAL CHECK DIFFUSER FOR WEAR AND CLERANCE

2

-

-

... More
37 TPH DIESEL DRIVEN PUMP MODEL- SH65-16N1-DG S2-316 QTY - 02 CHECK INJECTION NOZZLE CHECK INJECTION PUMP ADJUST VALVE CLERANCE OF INTAKE AND EXHAUST VALVE CHECK THE SURFACE OF BRUSH AND SLIP RING CHECK AND REPLACE FUEL PIPING CHECK THE PUMP CLEARANCES AND REPAIR AS NECESSARY. PROVE THE PUMP FOR SATISFACTORY PERFORMANCE.

2

-

-

... More
INSTRUMENTATION GUAGE PIPE LINES INSTRUMENTATION PIPE LINES OF VARIOUS MACHINERIES HOLED AND PERISHED AT VARIOUS PLACES, TO BE RENEWED INCLUDING END FITTINGS. LENGTH- 30 MTR, SIZE-8 / 10 MM.

30

-

-

... More
FUEL STORAGE TANK 02 IN NO. FUEL STORAGE TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES: (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
FUEL RU TANK 02 IN NOS. MAIN ENGINE FUEL RU TANK TO BE CLEANED AND ONE COAT OF OM 750 TO BE APPLIED. WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).

2

-

-

... More
LUB OIL RU TANK 01 IN NOS. LUBRICATING OIL RU TANK TO BE CLEANED . WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT.TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN.(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
FRESH WATER STORAGE TANK 01 IN NOS. FRESH WATER STORAGE TANK TO BE CLEANED, SURFACE PREPARED AND PAINTED. (01 COAT EROP, 02 COATS OF COLD BITUMINOUS.WORK INVOLVES (A)MECHANICAL CLEANING OF INTERNAL SURFACE.(B)CARRY OUT STRUCTURAL REPAIRS OF DEFECTIVE AREA.(C)CARRY OUT AIR PRESSURE TESTING AND PROVE ALL TANKS AFTER DEFECT RECTIFICATION(D) CLEANING BEFORE APPLYING PAINT. TEST PRESSURE - 0.25 KG/SQ CM (OR 6"WATER GAUGE FOR TEN MIN).(E)FLUSHING THROUGH TO BE CARRIED OUT POST PAINTING WORK.

1

-

-

... More
DOMESTIC FRESH WATER SYSTEM PIPE LINE CHEMICALLY CLEAN AND PRESSURE TEST FRESH WATER SYSTEM PIPE LINE. RENEW PIPE LINE IF NECESSARY. DIA - 40 MM , LENGTH - 20 MTRS, MAT - MS

20

-

-

... More
DOMESTIC FRESH WATER SYSTEM VALVES 06 IN NOS FRESH WATER SYSTEM VALVES NOT HOLDING. TO BE OVERHAULED. DIA - 40 MM

6

-

-

... More
FUEL FILLING SYSTEM 04 IN NOS FLANGES TO BE MANUFATURED AS PER FITTING.

4

-

-

... More
CARGO FUEL FILLING/DEFUELING SYSTEM VALVES 10 IN NOS FUEL FILLING NOT HOLDING. VALVE TO BE OVERHAULED. LOCATION - SCATTERED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE

10

-

-

... More
CARGO AVCAT FILLING/DEFUELING SYSTEM VALVES 05 IN NOS FUEL FILLING NOT HOLDING. VALVE TO BE OVERHAULED. LOCATION - SCATTERED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE

5

-

-

... More
CARGO FUEL FILLING TANK SUC/DISCH VALVES 08 IN NOS FUEL FILLING/DEFUELING VALVES OF CARGO FUEL TANKS NOT HOLDING. VALVE TO BE OVERHAULED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE. VALVES ARE SITUATED INSIDE CARGO TANKS AND OPERATED BY ROD GEARING. WORK INCLUDES REPAIR/RENEWAL OF VALVES, ROD GEARING AND REPAIR/RENEWAL OF VALVE WHEEL.

8

-

-

... More
CARGO AVCAT FILLING TANK SUC/DISCH VALVES 02 IN NOS AVCAT FILLING VALVES OF CARGO AVCAT TANKS NOT HOLDING. VALVE TO BE OVERHAULED. DIA -150 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE. VALVES ARE SITUATED INSIDE CARGO TANKS AND OPERATED BY ROD GEARING. WORK INCLUDES REPAIR/RENEWAL OF VALVES, ROD GEARING AND REPAIR/RENEWAL OF VALVE WHEEL.

2

-

-

... More
STRIPPING SYSTEM TANK SUCTION VALVES 10 IN NOS VALVES OF STRIPPING SYSTEM TANK SUCTION VALVE NOT HOLDING. VALVE TO BE OVERHAULED. DIA -32 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE. VALVES ARE SITUATED INSIDE CARGO TANKS AND OPERATED BY ROD GEARING. WORK INCLUDES REPAIR/RENEWAL OF VALVES, ROD GEARING AND REPAIR/RENEWAL OF VALVE WHEEL.

10

-

-

... More
STRIPPING SYSTEM TANK SUCTION VALVES 08 IN NOS VALVES OF STRIPPING SYSTEM NOT HOLDING. VALVE TO BE OVERHAULED. DIA -32 MM. IF REPAIR OF VALVE IS NOT POSSIBLE. RENEW THE VALVE. TYPE - FLAP VALVE.

8

-

-

... More
RUBBER RING JOINTS OF PIPE LINE CLAMP JOINTS RUBBER RING JOINT OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND TO BE RENEWED . Dia (mm) QTY 32 10 40 10 60 10 100 15 125 20

1

-

-

... More
DURETTES DURETTES OF VARIOUS SYSTEM PIPE LINES DETERIORATED AND PERISHED, TO BE RENEWED . ALL SECURING JUBILEE CLIPS/ CLAMPS TO BE RENEWED. Dia (mm) Length (mtr) 25 6 50 8 76 12 100 8 130 6

5

-

-

... More
BILGE BILGES OF MAIN ENGINE COMPARTMENT AND SRP COMPARTMENT TO BE CLEANED THROUGHLY AND TO BE PAINTED AS PER PAINT SCHEME.

1

-

-

... More
MISCELLANEOUS NUTS/ ADAPTORS OF VARIOUS SYSTEMS TO BE MANUFACTURED AS PER SAMPLE. MAT- BRASS, QTY - 80 NOS

80

-

-

... More
DIGITAL TANK SOUNDING CALIBRATION OF ALL 12 IN CARGO TANKS DIGITAL SOUNDING GAUGES. TO BE PROVED AFTER CALIBRATION. REPLACE DEFECTIVE LEVEL SENSORS.

12

-

-

... More
AVCAT AND DIESEL TANKS STRIPPING SYSTEM AVCAT AND DIESEL STRIPPING SYSTEM INTERCONNECTION TO BE ISOLATED TO AVOID CONTAMINATION.

1

-

-

... More
MATERIAL

-

-

-

... More
ELECTRICAL

-

-

-

... More
Alternators(02) (140KVA) MAKE - KIRLOSKER (a) Overhaul the alternator job involves the following :- (i) Replacement of bearing. (ii) Cleaning / varnishing of stator winding. (iii) Both interior & Exterior parts of the machine to be blown out with clean and hot air. (iv) Remove oil and dust from internal parts of Alternator.Check bearing and winding. Replace if required. (b) Post overhauling and fitment check for insulation. Insulation to be checked by megger terminal with respect to earth/body, minimum insulation acceptable is 2 mega ohm). (c). Control wiring to be fully renewed. Wiring to be renewed from DA to local and remote control panels as per the circuit diagram. On completion check completeness of the circuit and prove system during trials. (d).Check insulation of circuit. Insulation to be checked with respect to earth/body, minimum insulation acceptable is 2 mega ohm. (e) Associated glands, clamping, cable trays and all other accessories for laying of cables are to renewed if defective during survey. (f) Both diesel alternators engine control panels and alarm panels Malfunctioning to be overhauled and Internal perished wiring to be renewed as per drawing. (g) Over speed protection of digital counter not working to be Calibrated /renewed (h) Alignment of alternater to be carried out post fitment of alternater. (i) Trials would be offered and accepted as per standard Naval trials team procedure

2

-

-

... More
Self Starter (24V DC) Both Main Engine Alternator and self starters (24V DC) to be Overhaul(Qty 04)

4

-

-

... More
Main Switch Board (i) Volt meters -02 (ii) Freq. meters -02 (iii) Ammeters - 02 (iv) KW meters -02 (v) insulation meater- 02(01m ohm,01 k ohm) (vi) power factor meter - 02 (vii) Double volt meter -01 (viii) Double frequncy metre - 01 (b) Both DA Breaker to be calibrated. If required to be replaced. (c) Rotary Hand change over switch (03 possition) defective to be renewed.

1

-

-

... More
Main Engine Control Panel Cum Instrument Panel (Engine Room (a) Both main engine alarm panels (engine room & Wheel House) not working. Engine control not working from wheel house. DIDR to be carried out and control system to be proved. (b) Both engine digital RPM meters to be calibrated. If required to be replaced. (c) 02 in no tachometer to be overhauled. (d) 02 in no Exhaust Temperature gauge to be Calibrated. (d) 02 in no Exhaust Temperature gauge to be Calibrated. (e) 02 in no shaft RPM indicator erratic to be calibrated.

2

-

-

... More
Steering Gear System Rudder angle indicator pointer in wheel house showing erratic reading, defect to be rectified. Potentional meter in (ASP) to be Calibrated .

1

-

-

... More
Electrical Motors Following motors to be overhauled and to be proved satisfactory . Stripping pump(415V 3PH 2.2KW ) - 1 Stripping pump (415V 3PH 2.2KW) - 2 Avcat pump (415V 3PH 11KW ) - 1 Lshsd pump (415V 3PH 15KW ) -1 Lshsd pump(415V 3PH 15KW ) - 2 Fresh water cargo pump (415V 3PH 3.7KW ) -1 Windlass motor (415V 3PH 7.5 KW) = 01 Fresh water transfer motor (415V 3PH 1.1 KW)=01 Bilge/Blast pump (415V 3PH 15 KW)=01 Fire pump (415V 3PH 18.5 KW)=01 Fuel transfer pump (415V 3PH 2.2 KW)=01 Fuel transfer pump (415V 3PH 2.2 KW)=02 STP Motor (415V 3PH 04 KW)=01 Bilge pump (415V 3PH 0.75 KW)=01 L/O purifier (415V 3PH 1.1 KW)=01 Boat davit motor (415V 3PH 3.7 KW)=01

19

-

-

... More
Ventilation Motors Following ventilation motors to be overhaul E/R Exhaust fan (01) E/R Supply fan(01) Galley Exhaust fan (01) Pump room Exhaust fan Aft and fwd (02) Pump room Supply fan Aft and fwd (02) Crew mess Supply fan (01) Paint store Exhaust fan (01)

9

-

-

... More
Starter And Control Panel Following starters and Control panels to be repair and safety protection to be Calibrated as per motor rated current. If found defective to be replaced. Air compressor starter - 02 no Fuel oil transfer pump motor - 01 no GS bilge pump starter - 02 no Engine room supply fan starter - 02 no Engine room Exhaust fan starter - 02 no Supply fan starter for wheel house & Accommodation) - 01no Steering gear starter - 02 no Capstan Control Panel - 01 no Windlass control panel - 01no Capstan master control panel - 01no Fresh water motor starter - 01no Overhaul of a starter panel would involve the following:- (a). Replace internal wiring alongwith associated terminals, lugs, etc. (b) All overload relays (OLR) , contactors & relays are to be renewed after calibration. (c) All indication lamps to be replaced with indigenous make lamps. (d). All electrical connections and fasteners are to be tightened (e). All switches of starter panel to be replaced. (f). On completion of overhaul, the Insulation of entire system to be checked - by a megger - with respect to earth / body, minimum insulation acceptable is 2 mega ohm. (j) All starters are to undergo test bed trials with standard current injection test rig

16

-

-

... More
Fire Alarm Serviciability checks of AFDS system

1

-

-

... More
Battery Rectifier 03 In no Battery charging rectifier to be overhauled. Rating 415V/24 V DC. Portable battery charging rectifier to be overhauled. Rating 230V/ 24V DC

3

-

-

... More
General Lighting Light fitting defective/broken/ fused to be replaced including flood lights/CFL/Bulbs/tubes.Damaged sockets & switches to be replaced. Total - 25 in no.

25

-

-

... More
Talk Back System Talk back system from engine room to wheel house not working defect to be checked and replaced the cable if required.

1

-

-

... More
Transformer, 10VA(415V,50HZ ,3PH) 04 in no lighting transformers to be overhauled and serviceability checks to be carried out on completion.

4

-

-

... More
Batteries 12V (a) Re-commisioning of 10 in no 12V,180AH batteries. (b) Re-commisioning of 12 in no 12V, 200 AH inverter batteries.

22

-

-

... More
Cooking Range with oven Renewable of internal wiring & elements .checks of thermostart on oven for properly cut off if required then replace.

1

-

-

... More
sailor set serviceability checks of o1 no of sailor set.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.