Integrated Defence Staff Tender

To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Integrated Defence Staff - IDS Tender

Works
Automobiles and Auto Parts
Electrical and Electronics
Eprocure
Opening Date3 Nov 2020
Closing Date16 Nov 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nsry/com/1898/repair Rate Contract For Repair/routines Of M/s Koel Make Diesel Alternators Fitted Onboard In Ships Yard Crafts And Fdns

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(1) UNDERTAKE THE INITIAL ALIGNMENT FOR ENGINE WITH ALTERNATOR , CHECK TO BE WITHIN LIMIT AND SUBMIT READING TO MQC (E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PARAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEAD (4) CHECK CLEARANCE OF CONNECTING ROD & BEARING ALSO CHECK THE CAMSHAFT REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER CARRY OUT CHEMICALLY CLEANING AND PRESSURE TEST. (6) INSERT VALVE SEAT, REPLACE THE INLET & EXHAUST VALVE (7) REPLACE FRESH & SEA WATER PUMPS. (8) CHECK THE ALTERNATOR AND TEST ON BOARD CHECK INDULATION OF VARIOUS COMPONENTS INCLUDOING BEARING AND RUBBER PADS, REPLACE IF NECESSARY (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GUAGE & ALARMPANEL SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GUAGE TO CARRIED OUT. (10) REPLACE THERMOSTAT VALVE & REPLACE ALL FLEXIBLE / RUBBER HOSES. (11) CHECK STARTER STOP SOLENOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE REPLACE ALL THE INJECTORS & FUEL SYSTEM PIPES (14) COMMISION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

2

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (6R1080T)- NT ARGA

-

-

-

... More
(1) UNDERTAKE THE INITIAL ALIGNMENT FOR ENGINE WITH ALTERNATOR , CHECK TO BE WITHIN LIMIT AND SUBMIT READING TO MQC (E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PARAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEAD (4) CHECK CLEARANCE OF CONNECTING ROD & BEARING ALSO CHECK THE CAMSHAFT REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER CARRY OUT CHEMICALLY CLEANING AND PRESSURE TEST. (6) INSERT VALVE SEAT, REPLACE THE INLET & EXHAUST VALVE (7) REPLACE FRESH & SEA WATER PUMPS. (8) CHECK THE ALTERNATOR AND TEST ON BOARD CHECK INDULATION OF VARIOUS COMPONENTS INCLUDING BEARING AND RUBBER PADS, REPLACE IF NECESSARY (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GUAGE & ALARMPANEL SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GUAGE TO CARRIED OUT. (10) REPLACE THERMOSTAT VALVE & REPLACE ALL FLEXIBLE / RUBBER HOSES. (11) CHECK STARTER STOP SOLENOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE REPLACE ALL THE INJECTORS & FUEL SYSTEM PIPES (14) COMMISION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

2

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (4R1040TA)- AJA & ABHISHEK

-

-

-

... More
(1) UNDERTAKE THE INITIAL ALIGNMENT FOR ENGINE WITH ALTERNATOR , CHECK TO BE WITHIN LIMIT AND SUBMIT READING TO MQC (E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PARAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEAD (4) CHECK CLEARANCE OF CONNECTING ROD & BEARING ALSO CHECK THE CAMSHAFT REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER CARRY OUT CHEMICALLY CLEANING AND PRESSURE TEST. (6) INSERT VALVE SEAT, REPLACE THE INLET & EXHAUST VALVE (7) REPLACE FRESH & SEA WATER PUMPS. (8) CHECK THE ALTERNATOR AND TEST ON BOARD CHECK INSULATION OF VARIOUS COMPONENTS INCLUDOING BEARING AND RUBBER PADS, REPLACE IF NECESSARY (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GUAGE & ALARMPANEL SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GUAGE TO CARRIED OUT. (10) REPLACE THERMOSTATE VALVE & REPLACE ALL FLEXIBLE / RUBBER HOSES. (11) CHECK STARTER STOP SOLENOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE REPLACE ALL THE INJECTORS & FUEL SYSTEM PIPES (14) COMMISION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

2

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (HA 394)- SB VII

-

-

-

... More
(1) UNDERTAKE THE INITIAL ALIGNMENT FOR ENGINE WITH ALTERNATOR , CHECK TO BE WITHIN LIMIT AND SUBMIT READING TO MQC (E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PARAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEAD (4) CHECK CLEARANCE OF CONNECTING ROD & BEARING ALSO CHECK THE CAMSHAFT REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER CARRY OUT CHEMICALLY CLEANING AND PRESSURE TEST (6) INSERT VALVE SEAT, REPLACE THE INLET & EXHAUST VALVE (7) REMOVE FRESH & SEA WATER PUMPS. OVERHAUL THE PUMPS AND CHANGE THE DAMAGE PART AND RECONDITION THE PUMPS (8) CHECK THE ALTERNATOR AND TEST ON BOARD CHECK INSULATION OF VARIOUS COMPONENTS INCLUDING BEARING AND RUBBER PADS, REPLACE IF NECESSARY (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GUAGE & ALARMPANEL SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GUAGE TO CARRIED OUT. (10) REPLACE THERMOSTATE VALVE & REPLACE ALL FLEXIBLE / RUBBER HOSES. (11) RENEW THE TECHO DRIVE UNITE ALONG WITH ITS CABLE. CHECK STARTER, STOP SOLINOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE ALL THE INJECTORS REPLACE SPARES AS NECESSARY (14) COMMISION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

1

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (6SL9088TA)- LCU MK IV

-

-

-

... More
(1) CARRY OUT VISUAL EXAMINATION OF ENGINE FOR CLEANLINESS AND LEAKAGES IF ANY. RECTIFY THEM, (2) CHECK THE VALVE CLEARANCE & ADJUST IF REQUIRED , (3) CLEAN SEA WATER STRAINER, (4) CLEAN THE HEAT EXCHANGER INTERNALLY, (5) CLEAN CENTRIFUGE FILTER, (6) CHANGE THE ENGINE LUBE OIL, (7) REPLACE THE CARTRIDGE OF DUPLEX LUBE OIL FILTER, (8) REPLACE THE ELEMENT OF DRY TYPE AIR CLEANER, (9) REPLACE THE V BELTS, (10) REPLACE THE CARTRIDGE OF DUPLEX FUEL FILTER, (11) CHARGE JOINT OF ROCKER COVER, (12) TOP UP THE COOLANT, (13)REPLACE FUEL HOSES, (14)REPLACE WIRE BRADED HOSES, (15) REPLACE HIGH PRESSURE FUEL PIPE, (16) RELACE THE 'O' RING OF THE DRAIN PLUG, (17) REPACE THE RUBBER HOSES OF CHARGE AIR COOLER INLET & OUTLET PIPE, (18) CLEAN CAC, (19) REPLACE THE AIR CLEANER HOSE, (20) DISCONNECT THE EXPANSION BELLOW. REPLACE THE JOINTS, (21)DISCONNECT THE LUBE OIL INLET PIPE TO TURBOCHARGER. REPALCE THE JOINT, (22) DISCONNECT THE LUBE OIL DRAIN PIPE TO TURBOCHARGER. REPALCE THE JOINT, (23) REPLACE THE JOINTS OF TURBOCHARGER EXHAUST MANIFOLD, (24) REPLACE OLD JOINTS OF EXHAUST MANIFOLD, (25) REMOVE THE SEALING RINGS AND REPLACE SEALING RINGS OF EX MANIFOLD, (26) REPLACE THE SEALING WASHERS VENTING PIPE OF CYLINDER HEAD, (27) REPLACE THE JOINTS OF ROCKER SUPPLY OIL PIPE BANJO, (28) REPLACE INJECTOR, (29) REPLACE THE NOZZLE SEALING WASHERS, (30) REPLACE THE CYLINDER HEAD BOLTS IF LENGTH IS INCREASED BEYOND LIMIT VALUE, (31) REPLACE THERMOSTAT ELEMENT, (32) REPLACE THE JOINT OF OIL SUMP, (33) REPLACE THE JOINT OF SUCTION TUBE ASSEMBLY, (34) REPLACE PISTON RINGS, (35) REPLACE THE CYLINDER LINER IF BORE HAS REACHED THE WEAR LIMIT, (36) OVERHAUL CYLINDER HEAD, (37) REPLACE CYLINDER HEAD GASKET, (38) REPLACE INLET AND EXHAUST VALVES, (39) REPLACE VALVE GUIDES, (40) REPLACE INLET VALVE SEAT, (41) REPLACE EXHAUST VALVE SEAT, (42) REPLACE VALVE SEALS, (43) REPLACE VALVE COLLETS, (44) REPLACE VALVE SPRING INNER, (45) REPLACE VALVE SPRING OUTER, (46) REPLACE VALVE SPRING CUP, (47) REPLACE CONNECTING ROD BOLTS, (48) SERVICE SEA WATER PUMP, (49) REPLACE SET OF JOINTS, (50) REPLACE SET OF 'O' RINGS, (51) REPLACE SET OF COPPER WASHERS, (52) REPLACEMENT OF ALL THE HOSES, (53) REPLACE ANTI-VIBRATION MOUNTINGS FOR ENGINE, M(54) REPLACE ANTI-VIBRATION MOUNTINGS FOR CONTOL PANEL, (55) CHECK & CALIBRATE ENGINE SENSORS & SWITCHES AND UNDERTAKE SAFETY CHECKS, (56) CHECKING OF ALTERNATOR IR, SPACE HEATER, WINDING TEMPERATURE & BEARING CONDITION.

2

-

-

... More
LIST OF SPARES REQUIRED FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (6SL9088TA)- LCU MK IV

-

-

-

... More
SERVICE KIT FOR HEAT EXCHANGER (F6.M009.01.0.00)

2

-

-

... More
SERVICE KIT FOR CENTRIFUGAL FILTER (F6.M009.04.0.00)

2

-

-

... More
K-OIL (20 LITRE) (82.050.10.0.20)

4

-

-

... More
OIL FILTER (DV0.014.42.0.00)

4

-

-

... More
AIR CLEANER PRIMARY FILTER ELEMENT (DV8.505.74.0.00)

2

-

-

... More
POLY V BELT 4PK 1280 (F6.064.95.0.00)

2

-

-

... More
POLY V BELT 4PK 1515 (F6.184.04.0.00)

2

-

-

... More
FUEL FILTER CARTRIDGE DUPLEX TYPE (4H.333.03.0.00)

4

-

-

... More
K COOL SUPER PLUS - 50-50 PREMIX, 25 LITRE CAN (82.020.35.1.26)

4

-

-

... More
FUEL PIPE (FILTER TO PUMP) (F6.353.106.0.00)

2

-

-

... More
FUEL PIPE (PUMP TO FILTER) (F6.353.105.0.00)

2

-

-

... More
1 METER LONG FUEL HOSES WIRE BRADED (6H.466.35.0.00)

2

-

-

... More
1 METER LONG FUEL HOSES WIRE BRADED (6H.466.36.0.00)

2

-

-

... More
WIRE BRAIDED PIPE FROM JACKETED LEAKOFF TO FUEL COLLECTOR (6H.945.14.0.00)

2

-

-

... More
WIRE BRAIDED LUB OIL SUPPLY HOSE (CRANK CASE TO FIP) FOR IRS (4H.333.01.0.00)

2

-

-

... More
JACKETED H.P. PIPE ASSLY (F6.734.70.0.00)

2

-

-

... More
O-RING FOR DRAIN PLUG (F6.024.47.0.00)

2

-

-

... More
HOSE BETWEEN CAC PIPE TO MANIFOLD PIPE (F6.063.19.0.00)

2

-

-

... More
RUBBER HOSE TURBO TO PIPE (F6.063.79.0.00)

2

-

-

... More
HOSE FROM HE TO ENGINE IN (F6.064.97.0.00)

2

-

-

... More
HOSE FROM HE TO PIPE COOLANT SIDE (F6.063.99.0.00)

2

-

-

... More
HOSE FROM ENGINE OUT TO HE (F6.064.39.0.00)

2

-

-

... More
JOINT FOR AIR INLET/OUTLET COVER (4H.1494.18.0.00)

4

-

-

... More
JOINT FOR AIR INLET MANIFOLD OUTLET (F6.674.04.0.00)

4

-

-

... More
HOSE FROM AIR CLEANER TO TURBOCHARGER (F6.065.27.0.00)

2

-

-

... More
R RING (DIN 70910-65x2.5) (F6.168.02.0.00)

12

-

-

... More
INJECTOR (F6.042.31.0.00)

12

-

-

... More
CUP SEAL (F6.031.02.0.00)

12

-

-

... More
THERMOSTAT ELEMENT (74 DEG)- WTIL No.DEV358 (39.040.09.0.00)

4

-

-

... More
PISTON RING SET (STD.) (F6.005.71.0.00)

12

-

-

... More
INLET & EXHAUST VALVE PAIR (F6.359.50.0.00)

12

-

-

... More
VALVE GUIDE (F6.007.02.7.00)

24

-

-

... More
VALVE SEAT INSERT INLET (F6.359.02.7.00)

12

-

-

... More
VALVE SEAT INSERT EXHAUST (F6.359.04.7.00)

12

-

-

... More
VALVE SEAL (F6.007.14.0.00)

24

-

-

... More
VALVE COLLET (PAIR) (F6.007.07.0.00)

24

-

-

... More
VALVE SORING (INNER) (F6.007.11.0.00)

24

-

-

... More
VALVE SORING (OUTER) (F6.007.09.0.00)

24

-

-

... More
VALVE SPRING CUP (F6.007.08.0.00)

24

-

-

... More
CONNECTING ROD BOLT (F6.005.02.0.00)

24

-

-

... More
SERVICE KIT FOR SEA WATER PUMP (F6.M009.02.0.00)

2

-

-

... More
SET OF JOINTS (F6.421.30.0.00)

2

-

-

... More
SET OF O RINGS (F6.421.32.0.00)

2

-

-

... More
SET OF COPPER WASHERS (F6.421.31.0.00)

2

-

-

... More
RUBBER HOSES (TGL 13880 40LG) (F6.013.13.0.00)

2

-

-

... More
HOSE FROM MAKEUP TANK TO ENGINE IN PIPE (F6.064.38.0.00)

2

-

-

... More
HOSE BETWEEN RAW WATER PIPE & H.E. (F6.064.28.0.00)

2

-

-

... More
HOSE FOR RAW WATER SIDE (F6.063.96.0.00)

2

-

-

... More
BREATHER HOSE (F6.064.94.0.00)

2

-

-

... More
HOSE FROM SUMP TO DRAIN PUMP (F6.064.51.0.00)

2

-

-

... More
HOSE FOM DRAIN PUMP OUT (F6.064.52.0.00)

2

-

-

... More
AVM FOR SL90 (ENGINE SIDE) (F6.063.76.0.00)

8

-

-

... More
RUBBER AVM RESTOFLEX/AVMOUNTS MAKE 30MM x 30MM (6H.720.07.0.00)

12

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (HA 294/20 KVA DA)- WB III

-

-

-

... More
(1) UNDERTAKE THE INITIAL ALIGNMENT OF ENGINE WITH ALTERNATOR. CHECK TO BE WITH IN LIMITS AND SUBMIT READING TO MQC(E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PERAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS. DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEADS (4) CHECK CLEARANCE OF CONNECTING ROD & BEARINGS. ALSO CHECK THE CAMSAFT. REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER, CARRY OUT CHEMICALLY CKEANING AND PRESSURE TEST. (6) INSERT VALVES SEAT, CLEAN INLET & EXHAUST VALVE, GRIND IF NECESSARY (7) REMOVE FRESH & SEA WATER PUMPS. OVERHAUL THE PUMPS AND CHANGE THE DAMAGE PART AND RECONDITION THE PUMPS. (8) CHECK THE ALTYERNATOR AND TEST ON BOARD. CHECK INSULATION OF VARIOUS COMPONENTS INCLUDING BEARING AND RUBBER PADS, RENEW (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GAUGES & ALARM PANEL. SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GAUGE TO BE CARRIED OUT (10) REPLACE THERMOSTATE VALVE & REPLACE ALL FLEXIBLE/ RUBBER HOSES (11) RENEW THE TECHO DRIVE UNITE ALONG WITH ITS CABLE. CHECK STARTER, STOP SOLENOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE ALL THE INJECTORS. REPLACE SPARES AS NECESSARY. (14) COMMISSION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

1

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (6R1080T)- NT BALI

-

-

-

... More
(1) UNDERTAKE THE INITIAL ALIGNMENT FOR ENGINE WITH ALTERNATOR , CHECK TO BE WITHIN LIMIT AND SUBMIT READING TO MQC (E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PARAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEAD (4) CHECK CLEARANCE OF CONNECTING ROD & BEARING ALSO CHECK THE CAMSHAFT REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER CARRY OUT CHEMICALLY CLEANING AND PRESSURE TEST. (6) INSERT VALVE SEAT, REPLACE THE INLET & EXHAUST VALVE (7) REPLACE FRESH & SEA WATER PUMPS. (8) CHECK THE ALTERNATOR AND TEST ON BOARD CHECK INDULATION OF VARIOUS COMPONENTS INCLUDING BEARING AND RUBBER PADS, REPLACE IF NECESSARY (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GUAGE & ALARMPANEL SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GUAGE TO CARRIED OUT. (10) REPLACE THERMOSTAT VALVE & REPLACE ALL FLEXIBLE / RUBBER HOSES. (11) CHECK STARTER STOP SOLENOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE REPLACE ALL THE INJECTORS & FUEL SYSTEM PIPES (14) COMMISION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

2

-

-

... More
SERVICES CHARGES FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (HA 694)- FDN II

-

-

-

... More
(1) UNDERTAKE THE INITIAL ALIGNMENT OF ENGINE WITH ALTERNATOR. CHECK TO BE WITH IN LIMITS AND SUBMIT READING TO MQC(E) (2) START THE ENGINE & OBSERVE LUB OIL PRESSURE, TEMPRESSURE AND OTHER PERAMETERS BEFORE DISMANTLING THE ENGINE (3) REMOVE ALL CYLINDER HEADS & PISTONS. DECARBONIZE THE PISTON AND COMBUTION CHAMBERS AND EXHAUST PARTS OF CYLINDER HEADS (4) CHECK CLEARANCE OF CONNECTING ROD & BEARINGS. ALSO CHECK THE CAMSAFT. REPLACE AS NECESSARY (5) REMOVE FRESH WATER AND LUB OIL COOLER, CARRY OUT CHEMICALLY CKEANING AND PRESSURE TEST. (6) INSERT VALVES SEAT, CLEAN INLET & EXHAUST VALVE, GRIND IF NECESSARY (7) REMOVE FRESH & SEA WATER PUMPS. OVERHAUL THE PUMPS AND CHANGE THE DAMAGE PART AND RECONDITION THE PUMPS. (8) CHECK THE ALTYERNATOR AND TEST ON BOARD. CHECK INSULATION OF VARIOUS COMPONENTS INCLUDING BEARING AND RUBBER PADS, RENEW (9) CHECK THE INSTRUCTION PANEL WIRING OF ALL GAUGES & ALARM PANEL. SERVICEABILITY CHECK & CALIBRATION OF ALL THE PRESSURE, TEMP AND RPM GAUGE TO BE CARRIED OUT (10) REPLACE THERMOSTATE VALVE & REPLACE ALL FLEXIBLE/ RUBBER HOSES (11) RENEW THE TECHO DRIVE UNITE ALONG WITH ITS CABLE. CHECK STARTER, STOP SOLENOID AND CHARGING ALTERNATOR (12) DECARBONISES THE INLET AND EXHAUST MANIFOLD AND CLEAN THE SAME (13) OVERHAUL THE FUEL INJECTION PUMP AND CALIBRATE ALL THE INJECTORS. REPLACE SPARES AS NECESSARY. (14) COMMISSION THE AUXILIARY DG & CARRY OUT LOAD TRIAL ON AVAILABLE LOAD FOR A PERIOD OF ONE HOUR

1

-

-

... More
LIST OF SPARES REQUIRED FOR UNDERTAKING 5000 HRLY ROUTINE JOB ON DA (HA 694)- FDN II

-

-

-

... More
KOEL CARE SUPER GENUINE OIL 20 LITERS CAN (82.050.10.0.20)

1

-

-

... More
SET OF JOINTS FOR 03.2107 (03.M002.04.0.00)

1

-

-

... More
SET OF COPPER WASHER FOR 03.2107 (03.M002.05.0.00)

1

-

-

... More
SET OF O RINGS FOR 03.2107 (03.M002.06.0.00)

1

-

-

... More
CYLINDER LINER (02.019.04.0.00)

3

-

-

... More
PISTON ASSEMBLY COMPLETE (02.020.50.0.00)

3

-

-

... More
ROCKER ARM ADJUSTING SCREW (02.024.13.0.00)

6

-

-

... More
NUT FOR RICKER ARM ADJUSTING SCREW (02.024.27.0.00)

6

-

-

... More
BOLT FOR CYLINDER HEAD 12x211 (02.022.03.0.00)

12

-

-

... More
PUSH ROD (WELDED) (02.024.70.0.00)

6

-

-

... More
CONNECTING ROD BEARING (STD) / BIG END BEARING (NA) (04.685.02.0.00)

6

-

-

... More
K-COOL SUPER PLUS, 25 LTR CAN (82.020.35.1.26)

1

-

-

... More
INLET VALVE (US TIER 1 ENGINE) (02.445.02.0.00)

3

-

-

... More
EXHAUST VALVE (US TIER 1 ENGINE) (02.445.03.0.00)

3

-

-

... More
VALVE GUIDE - SEMI FINSH (READY FOR F BORE) (06.631.01.0.00)

6

-

-

... More
VALVE SEAT INSERT (INLET) (US TIER 1 ENGINE) (02.445.04.0.00)

3

-

-

... More
VALVE SEAT INSERT (EXHAUST) S/FINISH-CPCB (04.584.02.0.00)

3

-

-

... More
WIRE SNAP RING (02.022.18.0.00)

6

-

-

... More
VALVE COLLET (02.022.12.0.00)

12

-

-

... More
V.R. TOE (02.024.15.0.00)

6

-

-

... More
JOINT FOR ROCKER COVER (02.024.97.0.00)

3

-

-

... More
BELT (SPZ) AVx10 x 1564 (02.637.01.0.00)

1

-

-

... More
SENSOR UNIT (FOR ELEC TEMP GAUGE) (46.085.02.0.00)

1

-

-

... More
ELEC. LUB OIL TEMPERATURE GAUGE (46.084.01.0.00)

1

-

-

... More
LUB OIL PRESSURE SENSOR SWITCH (2H.092.11.0.00)

1

-

-

... More
WORM DRIVE HOSE CLIP (12MM) (50.519.01.000)

2

-

-

... More
WORM DRIVE HOSE CLIP (35MM) (50.519.07.000)

1

-

-

... More
HOSE CLIP (S.S.70 DIA) (30.650.02.0.00)

2

-

-

... More
LUB OIL SUPPLY HOSE (04.304.02.0.00)

1

-

-

... More
FUEL HOSE 5.1/D x 11.5.12.70 (02.525.06.0.00)

1

-

-

... More
HOSE FOR AIR CLEANER (3H.415.10.0) (03.203.29.0.00)

1

-

-

... More
HOSE FOR AIR CLEANER (S/F 24 V ALT) (04.387.02.0.00)

1

-

-

... More
FUEL FILLING HOSE (02.544.04.0.00)

1

-

-

... More
STOP SOLENOID (02.663.10.0.00)

1

-

-

... More
JOINT FOR AIR INLET MANIFOLD (02.058.07.0.00)

3

-

-

... More
SS JOINT FOR EXHAUST MANIFOLD (34.107.06.0.00)

2

-

-

... More
PRIMRY ELEMENT FOR AIR FILTER (04.586.03.0.00)

1

-

-

... More
OIL SPRAY NOZZLE ASSY (02.002.10.0.00)

3

-

-

... More
FUEL PIPE (FUEL FILTER OUTLET TO F.I.P INLET) (03.052.07.0.00)

1

-

-

... More
FUEL PIPE (FEED PUMP TO FUEL FILTER INLET) (03.052.08.0.00)

1

-

-

... More
PRIMRY ELEMENT (03.922.42.0.00)

1

-

-

... More
PRIMRY ELEMENT FOR AIR FILTER (04.586.03.0.00)

1

-

-

... More
SPIN ON FILTER FOR LUBRICATING (04.270.01.0.00)

1

-

-

... More
SET OF HIGH PRESSURE PIPES (DHA394) (03.723.90.0.00)

1

-

-

... More
COMBINED LEAK OFF PIPE NOZZLE TO PUMP (02.525.10.0.00)

1

-

-

... More
LUB OIL SUPPLY HOSE (04.304.02.0.00)

1

-

-

... More
INJECTOR ASSEMBLY (02.481.01.0.00)

3

-

-

... More
K-OIL SUPPER 20 LTR CAN (82.050.10.0.20)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.