Indian Coast Guard Tender

To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Indian Coast Guard - ICG Tender

Machinery and Tools
GEM
Opening Date30 Jan 2025
Closing Soon8 Feb 2025
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1004 Clean With Mild Detergent In Fresh Water Inspect For Cracks AndPeeling Of Gel Coat Repair If Necessary; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1005 Touch Up The Antifouling Paint As Per Paint Scheme Paint YardSupply; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1006 Clean All Sea Suction Scoops And Inspect For Cracks; ServiceProvider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1007 Clean The Marine Growth Of Shaft Propeller And Rudder; ServiceProvider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1008 Measure And Record The Clearance Of Stern Tube And P BracketBushes Rudder And Rudder Jumping Collar; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1009 Overhauling And Pressure Testing Of The Underwater Valves AndCocks Including Painting Of Valvesall Material And Spares Yard Supply I GS PumpUnderwat.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1010 Clean The Bilges And Thoroughly Inspect The Structure To MainEngine Foundation Supports For Distortion Cracks And Delamination; Service Provider( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1011 Check The Tightness Of Foundation Bolts Of All AuxiliaryMachineries; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HA1012 Marine Toilet Remove And Clean All Flexible Pipes And Refit WithNew ClipsHand Pumpsuction And Discharge Valve To Be OverhauledMakeJABSCOModelCMPCT 24vDia.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WK507; HB1013 Dfender Crack And Deterioration Observed At Dfenders At VariousPlaces To Be Renewed As Per SampleLegth Approx10 MtrEBD Type Rubber Fender75x75x40 Mm; Se.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB1014 Cleaning And Painting Of Bilges Of Following Compartment To BeCarried Out As Per Paint SchemePaint Yard Supply I Engine Room 148 Sqm Approx IiPum.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB 1015 Wheel House Sofa Rexine Is Deteriorated And Tear Off At VariousPlaces To Be Renewed As Per Samplelength 03 Mtr Height And Breadth 05 Mtr Each;Service Pr.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB 1016 Wheel House Sofa And Sitting Area Seat Cover To Be Changed As PerSample Length03 Mtrheight And Breadth 05 Mtr EachQty02; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB 1017 Wheel House Sofa And Sitting Area Floor Mat Is Damaged To BeRenewed As Per Sample Area 12 SQm Mat PVC VINYL; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB1018 Wheel House Wash Basin Tap Leaking Drain Pipe Choked Pipe To BeChemically Clean And Tap To Be Reneweddia Of Pipe40mmMaterial MS TapMaterialSS; Service Pr.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB1019 Wheel House Rear Window Sun Light Protection Film Shading ScreenTear Off At Amny Places To Be Replaced As Per Sample Area20 Sqm; Service Provider( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB1020 A Wooden Locker At Crew Cabin Broken Hinges Securing HolesInlarge Locker To Be Repaired And Sunmica Sheet To Be Renewed Size1mtrx1mtrx05Mtr; Service Prov.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB1021 Ingress Of Rain Water Observed In Bridge Crew Cabin Engine RoomAnd Pump Room Through Window Beeding Wire Gland And Securing Bolt Of StanchionBeeding To B.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; HB1022 Anchor And Chain Cable To Be Chip And Clean And Paint With TwoCoats Of Anti Corosive Paint Make SEA Links Weight50 Kg Cable Length10 MtrDia10mm Paint And.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3001 Gear Oil Cooler To Be Chemically Claeneed And Pressure Tested InWay Job Include Renewal Of GasketO Rings And 02 Nos Sacrificial Anode TP 15BarQty02; Serv.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3002 AC Sea Water Pump To Be Overhauled And Proved For SatisfactoryOperation Jobs Include Renewal Of Bearings Mechanicalseal And ImpellerMakeCrompton Greaves .. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3003 Checks All Cooling Coils For Cleaniness And Corrosion If The Coils AreDirty Clean With Water Sparay Soap Solution And Nylon Brush And Carryout PressureTe.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3004 Fire Fighting System ModelNOVEC 1230 Following Jobs To BeUndertaken In Yearly Routine A Check Manual Operation B Calibrate All PressureDevice .. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3005 Following Sewa Water Syatem Valve To Be Removed OverhaulkedAnd Pressure Tested All Material And Spares Yard Supply A Bilge Syatem Valve 40 NBTypeSDN.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3006 Fresh Water Tank To Be Cleaned With Liquid Detergent Renew ManHole Cover Gasket; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3007 Fuel Oil Tank To Be Cleaned Inspect And Paint The As Per PaintScheme Paint Yard Supply Renew Manhole Cover Gasket; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3008 Fire Pump Ot Be Overhauled And Proved For Satisfactory OperationAll Spares And Material Yard Supply Make CEM Model AM 512A; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EA3009 Bilge Pump To Be Overhauled And Proved For Satisfactory OperationAll Spares And Material Yard Supply Make CEM Model AM 512A; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EB3010 Fresh Water Pump Is Not Developing Sufficient Pressure SuspectExcessive Clearence Between Pump And Impeller Pump To Be Overhauled And ProvedFor Satsifac.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EB3011 Quick Shutt Off Valve Cover Of Firemain Syatem Broken To BeFabricated As Per Sample Material FRP Sheet Saize04x08x12 Inches; Service Provider( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EB3012 Securing Clamps Of Sw Fw And Fuel Syatem Coroded AndDeteriorated To Be Renewed As Per Sample A Dia12 Inches Qty06 MaterialSS B Dia10Inches Qty06.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; EB3013 04 Nos Gland Bush Stud Of Port And Stbd Shafting Thread WornoutStud To Be Fabricated And Fitted As Per Sample Dia14 Mm Length72 Mm MaterailSS;Service Pro.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; LA5001 Engine Room Supply Fans With Motors 02 Nos To Be Overhaul AndBearings To Be Replace Make CEM Model VE35230M; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; LA5002 05 In No Battery Charger To Be Overhauled And Proved ForSatisfactory Operation All Spares And Material Yard Supply MakeVICTRON ENERGYModelBLUE SMART IP67.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; LA5003 Window Wiper Overhaul The Window Wiper Motor And Gear AssemblyReplace Bearings If Required Wiper Blade To Be Changed As Per Sample All SparesAnd Materia.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) -WB507; LA5004 General Lighting Replace The Damage Fittings With A New OneQty08; Service Provider ( 1 )

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.