Forests And Environment Department Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Forests And Environment Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date7 Aug 2024
Closing Date16 Aug 2024
Tender Amount₹ 47,52,109
Costs
EMD
₹ 1,18,803Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DFOMA_15112_1Tender No
MA/2(S)/97/22Tender Authority
Forests And Environment Department ViewPurchaser Address
-Website
http://eprocure.andaman.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Timber Stocking Room for Category- III , IV and V Sawn Timber at Govt. Saw Mill, Betapur during 2024-25
Construction of Timber Stocking Room for Category- III , IV and V Sawn Timber at Govt. Saw Mill, Betapur during 2024-25
BOQ Items
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
1:2:4 (1 Cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 40 mm nominal size).
13.81
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
1:4:8 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size).
4.05
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
Foundations, footings, bases for columns.
153.12
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
6.24
-
-
Centering and shuttering including strutting, propping etc. and removal of form for :
-
-
-
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
87.6
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
-
-
-
Thermo-Mechanically Treated bars of grade Fe-500D or more.
660.52
-
-
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and
applying one or more coats of steel paint over a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
-
-
-
Hot finished welded type tubes
13399.86
-
-
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying one or more coat of steel paint over a priming coat of approved steel primer using structural steel etc. as required.
-
-
-
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
261.6
-
-
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
467.8
-
-
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete :
-
-
-
Ridges plain (500 - 600mm).
57
-
-
12 mm cement plaster of mix :
-
-
-
1:4 (1 cement: 4 fine sand)
86.84
-
-
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
86.84
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements