To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Forests And Environment Department Tender

Eprocure
Opening Date29 Oct 2021
Closing Date15 Nov 2021
Tender Amount₹ 13,06,696 
Notes
Download

Summary

Construction Of 28 Mtr Rcc Retaining Wall

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).

26.88

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).

41.16

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete

56

-

-

... More
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

252

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.

4460.93

-

-

... More
Providing Weep Poles with PVC pipe of 50 mm dia including the cost of cutting and placing in position as per the direction of engineer -in-charge

23.76

-

-

... More
12 mm cement plaster of mix: 1:4 (1 cement : 4 fine sand)

95.2

-

-

... More
Manually Carriage of materials including loading, un-Loading and stacking for lead less than 0.50 Km. Sand, Stone Aggregate below 40 mm Nominal size

72

-

-

... More
Manually Carriage of materials including loading, un-Loading and stacking for lead less than 0.50 Km. Stone Aggregate 40 mm Nominal size and above

6

-

-

... More
Manually Carriage of materials including loading, un-Loading and stacking for lead less than 0.50 Km. Cement

23.25

-

-

... More
Manually Carriage of materials including loading, un-Loading and stacking for lead less than 0.50 Km. Thermo-Mechanically Treated bars of grade Fe-500D or more.

4.46

-

-

... More
Manually Carriage of materials including loading, un-Loading and stacking for lead less than 0.50 Km. Timber

8.25

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.