Directorate Of RD PRIS And ULBS Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Directorate Of RD PRIS And ULBS Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 28,36,674
Costs
EMD
₹ 56,733Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDPRI_16710_1Bid Award Id
ViewTender No
EE/PRI/SAD-I/RR/2024-25/105Tender Authority
Directorate Of RD PRIS And ULBS ViewPurchaser Address
-Website
http://eprocure.andaman.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
On bituminous surface @ 0.50 Kg / sqm
1795.5
-
-
... More
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).( Use shredded plastic @10% of total bitumen i.e 90% VG-30 & 10% shredded plastic)
-
-
-
... More
With paving Asphalt grade VG - 30 with no solvent
1795.5
-
-
... More
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.
1795.5
-
-
... More
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
-
-
-
... More
All kinds of soil
570
-
-
... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1km (by mechanical means).
168.18
-
-
... More
Providing and applying 2.5 mm thick road marking strips (retroreflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications.
119.7
-
-
... More
05 Years Maintenance Provision.
-
-
-
... More
1st Year 0.25% of Upgradation amount
1
-
6596
... More
2nd Year 1.00% of Upgradation amount
1
-
26387
... More
3rd Year 1.50% of Upgradation amount
1
-
39581
... More
4th Year 2.00% o f Upgradation amount
1
-
52775
... More
5th Year 2.75% of Upgradation amount
1
-
72566