Directorate Of RD PRIS And ULBS Tender

To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.

Directorate Of RD PRIS And ULBS Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date30 Jan 2024
Closing Date8 Feb 2024
Tender Amount₹ 69,48,834 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1:4:8 (1 Cement : 4 Pulverised sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources).

19.56

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement

-

-

-

... More
1:1.5:3 (1 cement : 1.5 Pulverised sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

66.36

-

-

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).

2.85

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

552.55

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

2004.13

-

-

... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.

1575

-

-

... More
Supplying and stacking at site.

-

-

-

... More
90 mm to 45 mm size stone aggregate

196.88

-

-

... More
63 mm to 45 mm size stone aggregate

118.44

-

-

... More
53 mm to 22.4 mm size stone aggregate

118.44

-

-

... More
Stone screening 13.2 mm nominal size (Type A)

61.9

-

-

... More
Stone screening 11.2 mm nominal size (Type B)

24.57

-

-

... More
Moorum

41.9

-

-

... More
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .

346.5

-

-

... More
Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :

-

-

-

... More
For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm.

1181.25

-

-

... More
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :

-

-

-

... More
On W.B.M @ 0.75Kg/Sqm

1181.25

-

-

... More
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).

-

-

-

... More
With paving Asphalt grade VG - 30 with no solvent

1181.25

-

-

... More
Providing and laying Shredded Plastic @ 8% of Bitumen consumed including carriage of the same Port Blair (Only in the item of laying 2 cm premix carpeting ).

136.1

-

-

... More
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.

1181.25

-

-

... More
Routine Maintenance after completion of construction works (Lump-sum Amount for each year per Km.)

-

-

-

... More
For 1st year (Rs. 19,682.40) For 2nd year (Rs. 58,645.56) For 3rd year (Rs. 80,229.00) For 4th year (Rs. 1,02,649.20) For 5th year (Rs. 1,25,949.48) Maintenance Cost (Fixed) Total 5 year maintenance cost = Rs. 3,87,155.64) (Same rate to be quoted i.e Rs. 3,87,155.64)

1

-

-

... More
For Routine Maintenance, the unit rate indicated by the Authority shall apply. The bidder is requried to accept these rates, Further, the payment shall be performance based.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.