Directorate Of RD PRIS And ULBS Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Directorate Of RD PRIS And ULBS Tender
Civil And Construction
Road Construction
Eprocure
Opening Date19 Nov 2024
Closing Soon27 Nov 2024
Tender Amount₹ 34,96,385
Costs
EMD
₹ 69,928Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDPRI_16416_1Tender No
72/EE/PRI/NMA/MB/24-2025Tender Authority
Directorate Of RD PRIS And ULBS ViewPurchaser Address
-Website
http://eprocure.andaman.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
399
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
1:4:8 (1 Cement : 4Pulverised sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
34.23
-
-
1:3:6 (1 Cement : 3Pulverised sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
0.17
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, if nishing and reinforcement- All work up to plinth level :
-
-
-
1:1.5:3 (1 cement: 1.5Pulverised sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
0.13
-
-
Centering and shuttering including strutting, propping etc. and removal of form for
-
-
-
Foundations, footings, bases of columns, etc. for mass concrete
70.11
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
Thermo-Mechanically Treated bars of grade Fe-500D or more.
9.33
-
-
Extra for making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc.
198
-
-
Cement concrete flooring 1:2:4 (1 cement : 2Pulverised sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
-
-
-
40 mm thick with 20 mm nominal size stone aggregate
0.45
-
-
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
1323
-
-
Providing, Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
-
-
-
Subbase with stone aggregate 90 mm to 45 mm including Stone screening 13.2 mm size
132.3
-
-
Base Coursese with stone aggregate 63 mm to 45mm i/c stone screening 13.2 mm size.
79.38
-
-
Base Coursese with stone aggregate 53 mm to 22.4mm i/c stone screening 11.2 mm size.
79.38
-
-
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :
-
-
-
On W.B.M. @ 0.75 Kg / sqm
992.25
-
-
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).
-
-
-
With paving Asphalt grade VG - 30 with no solvent
992.25
-
-
Providing and adding shredded Plastic @ 8% of Bitumen cosumed including carriage of the same Port Blair (Only in the item of laying 2 cm premix carpeting)
114.3
-
-
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.
992.25
-
-
Routine Maintenance after completion of construction works (Lump-sum Amount for each year per Km.)
-
-
-
For 1st year (Rs. 16,533.78)
For 2nd year (Rs. 31,036.38)
For 3rd year (Rs. 39,509.39)
For 4th year (Rs. 48,307.12)
For 5th year (Rs. 1,05,797.44)
Maintenance Cost (Fixed)
Total 5 year maintenance cost = Rs. 2,41,184.11
(Same rate to be quoted i.e Rs. 2,41,184.11)
1
-
-
For Routine Maintenance, the unit rate indicated by the Authority shall apply. The bidder is requried to accept these rates, Further, the payment shall be performance based.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%