Directorate General Of Lighthouses And Lightships Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Directorate General Of Lighthouses And Lightships - DGLL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Nov 2024
Closing Date18 Nov 2024
Tender Amount₹ 47,19,254
Costs
EMD
₹ 94,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DGLL_834246_1Bid Award Id
ViewTender No
CM-PB-02036/1/2022-CM-PBTender Authority
Directorate General Of Lighthouses And Lightships ViewPurchaser Address
-Website
http://http://www.dgll.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Core cutting for Rebar Connection of Minimum of 20 mm dia bar with Depth of embedment 500 mm including using chemical compound RE500 V for rebar fixing including cost of drilling, anchor fastners for core and all arrangement for cutting.
40
-
-
Providing portable Genset of 5kW, scaffolding with staging platform, sufficient lighthing arrangement, fresh water supply (5 lit per minute) at the time of cutting, safe storage of resources, corrective civil works, helping hands, 1 HP water pump, hoses, other miscellaneous components for facilitating to complete core cutting and rebar connection
2
-
-
Fabrication, Supply and transportation of steel with a minimum yield strength of 500N/mm2 and minimum elongation of 16% or equivalent confirming to IS 1786 with corrosion resistant element for Fabrication and fixing of reinforcement in cast-in situ works as per the direction of Engineer-in-Charge, including cost of fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site, cost of binding wires, all T&P required for the work and minor tools ,tools & plants, engaging trained/ experienced workforce for working challenging mid sea working condition ,water charges, and all other charges etc. complete. ,
706
-
-
Fabrication Position and shuttering of 6mm thick structural steel with stiffeners of 6mm thick as sacrificial shuttering for pedestal column & beams etc, including cost of structural steel plates confirming to IS: 2062, Grade E250, manpower, transporting to location, placing in position, aligning, staging, welding cost of all other materials, transportation charges , all labour charges, hire charges, minor tools, rolling, cutting, welding engaging trained/ experienced workforce for working challenging mid sea working condition ,water charges, and all other charges etc. complete.
3394
-
-
Providing and laying Microconcrete of M50 grade as cast-in-situ concrete work. as indicated in the approved drawing and as directed by Engineer-in Charge , excluding cost of fabrication, fixing of reinforcement, but including cost of microconcrete, course aggregate, cost of all labour charges, mixing, conveying, placing, consolidation, transportation charges of all materials to the Work Site, hire charges and running charges of tools & plant, vibrator, consumables and all other equipments, cost of minor tools etc. complete. engaging trained / experienced workforce for working challenging mid sea working condition, water charges, safety gears, lifting and all other charges etc. complete.
8.8
-
-
Preparation, supply & fixing of template for installation of anchor bolts for the Trestle tower as per drawings including drilling holes, Providing GI anchor Bolt , placing and positioning the templete as per drawings including cost of all materials. fabrication charges, drilling holes, handling & placing, engaging trained/ experienced workforce for working challenging mid sea working condition ,water charges, and all other charges etc. complete.
2
-
-
Erection of Trestle tower over the existing structure as per drawing with all accessories/ components bracing, platform, plates, etc. tightering bolts and nuts, punching etc for proper holes etc(if required) completely including tools & plants, equipments, safety ropes, pulleys, safety belts, scafolding, all other items requires for erection as directed by engaging trained/ experienced workforce for working challenging mid sea working condition, water charges, and all other charges etc. complete.
1500
-
-
Painting of Trestle tower including base foundation with Two Coats of Marine grade Paint over coat of Primer including cost of all materials ,scafolding, all other items requires for paint as directed by engaging trained/ experienced workforce for working challenging mid sea working condition, water charges, and all other charges etc. complete.
1
-
-
Providing assistance for installation of Solar Pannel, Light Equipment, placing battery, including fixing light on pedestal with nut & bolt, all other items as directed by Engineer-In-Charge including cost of materials, labour charges, cutting welding,all other equipments, cost of minor tools etc. complete. engaging trained/ experienced workforce for working challenging mid sea working condition ,water charges, and all other charges etc. complete
1
-
-
Providing safety ropes , Safety equipments, Safety jackets, FirstAID kits,safety ladder, floaters Insurance for workforce engaged in mid sea working condition, all other safety gadgets ,safety suit,TOOLs & Plants required for ensuring safety ,engaging safety supervisor for ensuring safety, water charges, and all other charges etc. complete.
1
-
-