Andaman Lakshadweep Harbour Works Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Jul 2020
Closing Date31 Jul 2020
Tender AmountRefer Documents
Costs
EMD
₹ 1,32,720Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_ALHW_569286_1Tender No
ALHW/DCE-A/EE/OS/Tend40/19 -20Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply and stacking of stone boulder of size 20 - 30 cm from approved quarry at Mainland to the work site, including cost of materials, conveying and stacking at site, royalty charges, transportation charges of all materials to work site,all labour charges, labour welfare cess, GST, minor tools and plants etc. Complete. (Lead 5 KM from jetty to work site).
126
-
-
Laying and packing of boulders of various sizes by using Hitachi/Manual in line of boulder packing in a lead of 500 Mtrs as per the drawing excluding cost of boulders which will be paid separately, but including cost of all labour charges in shifting, laying,proper packing in the alignment, minor tools, transportation charges of all materials to work site, labour welfare cess and GST etc. Complete.
503
-
-
Supply and stacking of stone metal of size 40- 60 mm from approved quarry at Mainland to the work site, including cost of stone boulder etc..conveying and stacking at site, royalty charges, transportation charges of all materials to work site, all labour charges, labour welfare cess, GST, minor tools and plants etc. Complete. (Lead 5.0 KM from jetty to work site).
50
-
-
Laying and packing of stone metal of sizes of 40 to 60 mm by using Manual in line of boulder bund in a lead of 500 Mtrs as per the drawing excluding cost of stone metal which will be paid separately, but including cost of all labour charges in shifting, laying, proper packing in the alignment, minor tools, transportation charges of all materials to work site, labour welfare cess, GST, etc. Complete.
503
-
-
Providing and laying of PCC 1:3:6 (1 cement, 3 mainland sand, 6 graded mainland stone metal 40mm size) over the boulder surface including proper packing, including cost of cement, mainland river sand, mainland stone metal 40mm size and transportation of all materials, all labour charges, labour welfare cess, GST and minor tools etc. complete.
82
-
-
Providing and laying R.C.C 1:1.5:3 with 20mm size stone chips (one cement one and half mainland sand, & three stone chips of size 2cm graded) in all RCC works as directed by the EIC, excluding cost of fabrication charges of steel reinforcement, centering & shuttering charges which will be paid seperately, but including cost of cement, mainland stone chips and mainland sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing, all labour charges, labour welfare cess, GST, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator etc. complete.
48
-
-
Supplying and fixing of reinforcement in RCC works as directed by EIC, including cost of fabrication & fixing steel rods, cost of steel rods, all handling charges, cutting, bending, lapping, tying and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, cost of binding wire, transportation charges for all materials to worksite, GST, all T&P required for the work and minor tools etc. complete.
58
-
-
Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc. and removal of the same from reinforced cement concrete and plain concrete work as directed by the Engineer In Charge, including cost of cantering and shuttering, all labour charges, labour welfare cess, GST, cost of binding materials, cost of transportation charges of all materials to work site, cost of ballies, cost of minor tools etc. complete.
119
-
-
Bailing out the sea water from spring, tidal or drains, sea bed including hire charges pump set with POL and operator, cost of all labour charges, labour welfare cess, GST, transportation charges, minor tools etc. complete.
50
-
-
Supplying and Fixing of cast iron mooring ring at the required locations,level and alignment as directed by EIC and as per the approved drawings, including cost of mooring, ring, bolts, nuts & Washers etc. complete, hire charges of crane with POL & operator, cost of transportion charges of mooring ring, bolts, nuts & Washers, fixing the same with mooring ring bolt in concrete, welding charges for fixing mooring ring, cost of all labour charges, Labour welfare cess, GST, cost of minor tools, etc. complete.
15
-
-
Engaging of Hitachi for removal of slided boulder and levelling etc including cost of hire charges of Hitachi including POL & operator, all labour charges, labour welfare cess, GST and minor tools etc. complete.
20
-
-
Supplying and installation of the marker buoya including cost of materials, transportation charges, installation charges, acceseearies which are required for installation , all labour charges, labour welfare cess, GST and minor tools etc. complete
5
-
-