Andaman Lakshadweep Harbour Works Tender
To inquire about any e-tender the Andaman & Nicobar Islands government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder one can find every eprocurement Punjab tender on BidAssist. BidAassist has collated each and every Eproc Andaman & Nicobar Island Tender on its website. Looking for Andaman & Nicobar Island tenders online or going through the cumbersome government websites for it, has been made easier with the help of BidAssist.
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Building Construction
Machinery and Tools
Eprocure
Opening Date6 Sep 2024
Closing Date17 Sep 2024
Tender Amount₹ 16,98,116
Costs
EMD
₹ 33,962Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_824741_1Bid Award Id
ViewTender No
ALHW/EEC/CB/DB/TEND-27-3rd Call/2024-25Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Repairing and maintenance of Mechanical workshop of ALHW at MUS in Car Nicobar Island
Repairing and maintenance of Mechanical workshop of ALHW at MUS in Car Nicobar Island
BOQ Items
Providing and laying PCC of specific grade excluding the cost of centering and shuttering All works upto plinth level and including cost of cement, mainland river sand& stone aggregate,cost of all labour charges and transportation chargesof all materials to the worksite & cost of minor tools,labour cess, GST etc. complete.1:3:6( 1 cement , 3 mainland river sand, 6 grade stone aggregate 20 mm nominal size from mainland quarry)
11
-
-
Plastering with cement mortar 1:4 with 12 mm thick over exposed surface of concrete, hollow block walling, including cost of cement, mainland river sand, cost of transportation charges, all labour charges and minor tools, GST etc. complete.
188
-
-
Supplying and fixing rolling shutters of approved make, made of required sizeM.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters & including Transportation charges, labour cess, minor tools and GST etc., complete.
27
-
-
Providing and fixing glazing in aluminium door, window , ventilator, shutters and partitions etc with PVC neoprene gasket etc., complete as per the architectural drawings and the direction of EIC (cost of aluminium snap beading shall be paid in basic item). with glass panes of 5.5 mm thickness (weight not less than 10.00 kg/sqm and including cost of all materials, transportation charges,material to work site, cost of all labour charges, labour cess, minor tools and GST etc., complete).
19.5
-
-
Dismantling cement concrete manually by mechanical means including disposal of materials within 50 m lead as per direction of Engineer in charge 1:2:4/1:3:6 or richer mix , cost of all labour charges ,transportation charges and minor tools , GST, Labour welfare cess etc. complete.
7
-
-
Providing and fixing anodised aluminium grill of weight not less than 2.07 kg/sqm (anodised transparent or dyed to required shade according to IS: 1868 with minimum anodic coating of grade AC 15) of approved design/ pattern, with approved standard section and fixed to the existing window frame with C.P. brass/ stainless steel screws @ 200 mm centre to centre, including cutting the grill to proper opening size for fixing and operation of handles and fixing approved anodised.
12
-
-
Painting with Synthetic enamel paint of approved brand and manufacture of required colour to give an even shade as directed by EIC, including cost of paint , brush, scaffolding charges,transportion charges of all materials to work site all labour charges,minor tools labour cess & GST etc.,complete. a) Two or more coats on old work.
322
-
-
Distempering with 1st quality acrylic distemper (ready mix) having VOC content less than 50 grm/litre of approved brand and manufacture to give an even shade over the old surface including cost of distemper, materials to work site, scaffolding arragements, all labour charges, cost of mior tools, GST, labour cess etc., complete.
680
-
-
Painting two coat with antifungal paint of approved brand and manufacture on old wall surface to give an even shade including cost of other material , transportation charges, labour charges scaffolding arrangements, cost of putty, minor tools, GST, labour cess, etc., complete.
515
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shutting, including Cost of cement,mainland river sand & stones, all labour charges, labour cess , minor tools and GST etc., complete . All work up plinth level 1:1.5:3 ( 1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size form Mainland quarry)
7
-
-
Centering and shuttering including shutting, propping etc., and removal of from work and including cost of all materials to works site, cost of all labour charges, labour cess, minor tools and GST etc., complete . a) Foundation, footing, bases for columns
66
-
-
Fabrication and fixing Tor steel reinforcement for RCC work including cost of Tor Steel, cutting, bending, binding and placing in position, cost of binding wire, minor tools, GST, labour welfare cess etc. complete .
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements