Yamuna Expressway Industrial Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Yamuna Expressway Industrial Development Authority - YEIDA Tender
Civil And Construction
Excavation
Eprocure
Opening Date5 Dec 2023
Closing Date15 Dec 2023
Tender Amount₹ 37,87,279
Costs
EMD
₹ 76,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_YEIDA_867317_3Bid Award Id
ViewTender No
YEA/GM(PROJECT)/2023/849 DT-01/12/2023Tender Authority
Yamuna Expressway Industrial Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
centering & shuterring including strutting propping etc & removal of form forWall (any thickness) including attached pilasters, Butteresses, plinth and string couses etc
12.25
4735
386.55
... More
Cement concrete with 4cm gauge approved stone ballast coarse sand and cement in the proportion of 8:4:1 including supply of all material labour tools and plants etc required for all complation of work (item code 5:4;3)
16
5911
369.45
... More
Pumping out water by Diesal pump of discharge capacity of 4000 its per hour including fuel operator, suction & delivery pipes of size 4"x4" length 150 as per all kinds of soil UP PWD SOR-2020/DAR-18/A.R YEIDA
1108
1325168
1196
... More
Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete UPPWD/SOR/251a/P-14
28762
2093873
72.8
... More
cement concrete with 4cm gauge approved stone ballast coarse sand and cement in the proportion of 8:4:1 including supply of all material labour tools and plants etc required for all completion of work (item code 5.4.3)
1.23
7158
5820
... More
Laying non-pressure NP2 class R.C.C Pipe jointed with stiff mixture of cement mortar in the proportion of 1:2(1 cement : 2 coarse sand ) including testing of joints etc. complete
16
9465
591.6
... More
12 mm cement plaster 1:6(1cement: 6 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall. UP PWD SOR-2020/DAR-18/
41.6
6855
164.8
... More
M-150 brick work in 1:6 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work UPPWD SOR 303 Same as item no 305 but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a
9.57
47371
4950
... More
Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30cm measured at a height of 1m aboveground level and removal of rubbish up to distance of 50m out side the periphery of the area cleared UP PWD SOR-2020/DAR-18/2.31
6380
19778
3.1
... More
centering & Shuttering including strutting, propping etc at all level edges of slabs & breaks in floors and walls under 20cm wide
3.5
445
127.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements