Works Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department - EICCL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date29 Nov 2023
Closing DateCancelled
Tender Amount₹ 7,52,77,468 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sand filling in foundation of structure as per approved Drawing & Technical Specifications and as per Section - 900, 2100 of MORT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

172.02

102950

598.48

... More
Providing and laying bituminous macadam with hot mix plant minimum capacity of 60-90 TPH Producing an avarage out put 75tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen @3.3% of total mix, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 504 of MoSRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

1003.4

7645566

7619.66

... More
Approved for 30 ( Thirty ) items only

-

-

-

... More
For Sub-structure

439.15

4340664

9884.24

... More
Construction of embankment with approved material deposited at site from road way cutting & excavation from drain & foundation of other structures graded & complete to meet the requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

2874

102141

35.54

... More
Painting two coats with synthetic enamel paint of approved quality at any elevation on kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (Latest Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

194.29

14189

73.03

... More
Earthwork in excavation for Structure in Ordinary soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, setting out, dressing of section to correct line, level, grade and camber transporting to embankment site within all lifts and lead upto 1000mtr., utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

2874

212790

74.04

... More
Providing ad laying RCC of M25 garde for CD work and other structures of controlled quality having minimum cube strength of 250 Kg/CM2 at 28 days using 20mm and down graded black hard granite crusher broken stone agrregates, clean rever sand from approved quarry and using minimum quantity of approved quality cement as per clause 303.5 of IRC -21-1987 and IS-456-1987 including hoisting , lowering and laying concrete in layers to the required thickness and compacting each layer by means of vibrator including watering, curring and cost convence royality taxes etc all complete including rigid centering, shutering but excluding cost of reinforcement as per section 900,1000,1500, 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

-

-

-

... More
Supplying,straightening ,cutting,fitting and placing in position coiled or bend up M.S. rod / HYSD bars confirming to grade Fe-500, (Confirming to ISI specification) and jointing if necessary by lapping and tying the grills and placing in position as required for RCC work as per approved design, hoisting, lowering and laying in position including cost conveyance & taxes of M.S. rod / tor steel (Primary Producer like-SAIL/RINL/TATA/JINDALSTEEL/SHYAM STEEL) make and binding wire of 18 to 20 gauge (as approved by the deptt. as per Section - 1000 and 1600 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all materials,labour, T&P, etc. complete and as per direction of Engineer-in-charge. (weight of over lapping, couping, welded joints, spaeer bar, chair, stage, hanger and binding wires shall not be considered for payment at all. Standard co-efficient of different size of the steel shall be considered. Welding & lapping should be confirming to relevant clause of IRC 1987 in all heights)

898.36

7966108

8867.39

... More
Construction of granular material by providing Granular sub-base Grading-VI material as per table 400-1 ,spreading in unifrom layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC , and compacting with vibratory roller to achieve the desired density as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for road & Bridge works(latest Revision) including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

5805.96

13628155

2347.27

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (Latest Revision) fixed over aluminium sheeting, 1.5mm thick with area exceeding 0.9 Sqm supported on a mild steel angle iron post 75mm x 75mm x 6mm , firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

4.32

56183

13005.37

... More
Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

16944

443424

26.17

... More
Providing weep wholes in plain/reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and section 2200 & 2706 of MORT&H specification for road and bridge work (latest revision) and direction of Engineer in charge.

222.36

20817

93.62

... More
Loosening to a depth of 150mm, levelling and compacting original ground supporting embankment/ sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specifications for Road and Bridge works (latest Revision) & including cost of all labour, T&P, royalty etc. complete and including cost of all labour, T&P, etc. complete and as per direction of Engineer-in-charge.

7624.8

271442

35.6

... More
Ordinary Kilometre Stone

2

4501

2250.62

... More
60 cm x 45 cm rectangular

8

39994

4999.33

... More
Providing RCC M-20 Crash Barrier at the edges of road, approaches to bridge structures and medians with HYSD Reinforcement confirming to IRC-21 and dowel bars of 25mm dia, 450 mm long at expansion joints filled with premoulded asphalt filler board, keyed to the structure on which it is built and installed as per approved drawing design and section 809 of MORT&H specification for road and bridge work (latest revision) and direction of Engineer in charge .

66.4

285105

4293.75

... More
90 cm x 45 cm rectangular

8

49865

6233.19

... More
Providing and laying P.C.C M-15 grade in foundation using 40mm down graded crusher broken stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900, 1000, 1500, 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

-

-

-

... More
60 cm Circular

12

61273

5106.1

... More
Foundation

264.91

1379879

5208.86

... More
For Foundation Raft

493.32

3158200

6401.93

... More
Construction of embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site,spreading, grading to required slope and compacting at OMC by Vibratory Roller to meet the requirement of Table-300.2 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

44943.59

9098829

202.45

... More
Providing and fixing drainage spouts in deck slab with 100 mm diameter G.I pipe for finished item of work as per approved drawing and technical specifications complete in all respect as per Clause 2705 of MoRT&H Specifications for Road & Bridge works (Latest Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

26

26470

1018.09

... More
Providing wet mix macadum using crushed stone aggregates as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for road & Bridge works(latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

5017

12924996

2576.24

... More
Providing and laying semi dense bituminous concrete with minimum capacity of 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specification complete in all respect as per Section 900 and clause 508 of MoRT&H Specifications for Road & Bridge works (latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

501.7

4801364

9570.19

... More
Providing and laying R.C.C M-30 grade in wearing coat including cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900,1500,1600 & 2702 of MoRT&H specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

32.69

426344

13042.04

... More
Providing and applying primer coat with Medium setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer @ 0.60 Kg/ Sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

20068

709403

35.35

... More
Providing & laying sub-base with Moorum in layers not exceeding 225mm watering and compacting to the required density in O.M.C with Vibratory Roller including cost and conveyance of sub base materials as per Clause 408 & 901 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.

706

499664

707.74

... More
Substructure

284.72

1663516

5842.64

... More
Providing & fixing RCC M-15 grade Latest 200m stone, Ordinary Km. stone using 20mm down graded stone aggregates along with reinforcement for finished item of work as per drawing as per IRC -25 / 1967 & IRC-8-1980 fixed in position including finishing and lettering, painting as per approved drawing and technical specification complete in all respect as per Clause No. 805 & Section 800, 900, 1000, 1500, 1600, 1700 of MoRT&H specification for road & bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

-

-

-

... More
90 cm octagon

12

99605

8300.49

... More
Providing and applying tack coat with Medium setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion @ 0.20 Kg/ Sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

20068

246836

12.3

... More
Providing, laying gravel backing to aprons & revetments and providing filter material using gravel underneath pitching in slopes as per approved drawing and technical specifiactions complete in all respect as per Section 900, 1000 & 2500 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc. complete and as per direction of Engineer-in-charge.

92.75

81509

878.81

... More
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works Latest Revision & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

56480

364296

6.45

... More
For Super-structure

190.48

1557427

8176.33

... More
Providing road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads@250gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and free from streaks and holes etc. for finished item of work as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 803 of MoRT&H specification for road and bridge work (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

695.23

193607

278.48

... More
80 cm x 60 cm rectangular

7

47066

6723.82

... More
200 Mtr stone

12

7913

659.43

... More
Providing and laying filter media with stone crushed agreegates of 45 mm size satisfying the requirements laid down in clause 2200 and 2504.2.2 of MoRTH specification (latest revesion) to a thickness of not less than 600 mm width smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical specification and direction of Engineer in charge.

666.79

1845761

2768.13

... More
Providing Rough stone dry packing in aprons and revetments and stone pitching in slopes and boulder approns etc with hard granite stone (30 cm and above size) as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 and 2500 of MoRT&H Specifications for Road & Bridge works (Latest Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.

275.83

587363

2129.44



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.