If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 98,676Document Cost
₹ 2,000Tender Fee
₹ 5,822
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WR_108183_18Tender No
05/2023Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc.
4179.37
-
-
... More
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4
45
-
-
... More
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
198.39
-
-
... More
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
0.8
-
-
... More
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
1.34
-
-
... More
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
76.47
-
-
... More
10mm thick cement plaster 1:4 on bed and top.
74.5
-
-
... More
Providing Lowering, jointing and cutting of RCC pipes 450 mm dia into trenches & laying same to correct alignment complete
2350.67
-
-
... More
Cement concrete 1:4:8 with brick ballast 40mm gauge
14.51
-
-
... More
Dismantling of Brick work in Cement
288.59
-
-
... More
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
127.85
-
-
... More
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators)
44
-
-
... More
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
50.08
-
-
... More
Earth work Excavation for pipe line in trenches and pits from 1.5 to 2.25 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc.
55.73
-
-