If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Housing And Development Board - UPAVP Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date27 May 2023
Closing Date6 Jun 2023
Tender Amount₹ 7,50,000
Costs
EMD
₹ 15,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPHDB_805764_1Bid Award Id
ViewTender No
612/A-3/101 Dated 20.05.2023Tender Authority
Uttar Pradesh Housing And Development Board ViewPurchaser Address
-Website
http://https://upavp.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply & Laying of 25 sqmm 3.5 core LT cable complete the all respect as PWD SOR 2018 SI No. 501(K)
40
16880
422
... More
Testing- Under this item the firm will give the official testing of the pumping plant For a period of 8 hours running during the maintenance period. Enameled Danger Board of 440V.
1
5800
5800
... More
Installation/Errection/Commisioning of the Plant- Under this item you will take the erection of complete material to be supplied by them the above job. This will include the installatioin of pumping plant, fixing of the pipes special guage switchgear etc. as will be supplied by them. Suitable grider above the T.W. for fixing of pully block will be supplied by dept. All civil works such as making of the foundation of starter, cutting of holes inwall for taking out the pipe line etc. will be carried out by the Contractor.
1
23500
23500
... More
Painting- All parst of the motors, pump, switchgear accessories, piping and other iron or steel work not finished bright shall filled and painted with three coats of approved oil paint coat which shall be applied on after erection.
1
3500
3500
... More
Main Piping & Valves:- Supply main piping & Valves complete with detail given as below-
I C.I.D.F. 900 bends of 150 mm dia 1Nos.
II C.I.D.F. slues valves 150 mm size with hand wheel of I.V.C./Updhaya/Kisloskar make 4 Nos.
III C.I.D.F. Reflex Valve 150mm size 2 No.
IV M.S.D.F. Pipe piece of suitable size of 1.5 mtr. length In 150 mm size. 2Pcs.
V M.S.D.F. Pipe piece of suitable size of 2.00 mtr. length In 150 mm size. 1 Pcs.
VI C.I.D.F. Tee 150x150x150 mm size 1No.
VII M.S.D.Fcolumn 7.1mm thick 3M long 12 No.
VIII Column pipe clamps 2 Nos.
IX Complete Nut Bolt washer and rubber packing of suitable size. L.S.
X Housing Cover of M.S. sheet 1 No.
XI Cross Ring for reducer. 1 No
1
315000
315000
... More
Pressure & Depth:- I 100 mm dia pressure gauge H-GURU big make 1 Nos.
II 100 mm dia depth gauge H-GURU big make 1 Nos.
III 6 mm airline of suitable length with stop cock union nipple, elbows etc. complete. 1 Set.
IV 6 mm pipe with union nipple etc for connecting the guage Boards L.S.
V Teak Wood boards for mounting gauges 1 No.
1
9800
9800
... More
Lifting Tackle:- Supply of Chainpully block 2 Ton capacity with 4 mtr. Lift of Indef/Reva make
1
32500
32500